Volumn 15, Issue 4, 2000, Pages 1212-1217

Estimating the variance of production cost using a stochastic load model

Author keywords

Load uncertainty; Monte carlo simulation; Production costs; Variance of production costs

Indexed keywords

COMPUTER SIMULATION; COST EFFECTIVENESS; ELECTRIC POWER SYSTEMS; ESTIMATION; MONTE CARLO METHODS;

EID: 0034428117     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/59.898092     Document Type: Article
Times cited : (9)

References (14)
  • 3
    • 0026907883 scopus 로고
    • Using a semi-guided Monte Carlo method for faster simulation of forced outages of generation units
    • Aug.
    • A. Scully et at., Using a semi-guided Monte Carlo method for faster simulation of forced outages of generation units, IEEE Trans, on PWRS, vol. 7, no. 3 Aug. 1992.
    • (1992) IEEE Trans, on PWRS , vol.7 , Issue.3
    • Scully, A.1
  • 5
    • 0030085161 scopus 로고    scopus 로고
    • Analytical modeling of chronological reservoir operation in probabilistic production costing
    • , Feb.
    • M. E. P. Maceira and M. F. V. Pereira, Analytical modeling of chronological reservoir operation in probabilistic production costing, IEEE Trans, on PWRS, vol. 11, no. 1, Feb. 1996.
    • (1996) IEEE Trans, on PWRS , vol.11 , Issue.1
    • Maceira, M.E.P.1    Pereira, M.F.V.2
  • 9
    • 0024668077 scopus 로고    scopus 로고
    • Variance of power generating system production costs
    • , May
    • M. Mazumdar and C. K. Yin, Variance of power generating system production costs, IEEE Trans, on PWRS, vol. 4, no. 2, May 1989.
    • IEEE Trans, on PWRS , vol.4 , Issue.2 , pp. 1989
    • Mazumdar, M.1    Yin, C.K.2
  • 10
    • 0025427758 scopus 로고
    • The variance of production cost
    • , May
    • N.S. RauandY Hegazy, The variance of production cost, IEEE Trans. on PWRS, vol. 5, no. 2, May 1990.
    • (1990) IEEE Trans. on PWRS , vol.5 , Issue.2
    • Rauandy Hegazy, N.S.1
  • 11
    • 0024767252 scopus 로고
    • Comparison of probabilistic production cost simulation methods
    • Oct.
    • M. Lin, A. M. Breipohl, and F. N. Lee, Comparison of probabilistic production cost simulation methods, IEEE Trans, on PWRS, vol. 4, no. 4Oct. 1989.
    • (1989) IEEE Trans, on PWRS , vol.4 , Issue.4
    • Lin, M.1    Breipohl, A.M.2    Lee, F.N.3
  • 12
    • 0028481032 scopus 로고
    • An adaptive production simulation structure for operational planning with annual emission/fuel constraints
    • , Aug.
    • A. M. Breipohl, F. N. Lee, M. Lin, H. Wang, and J. Chiang, An adaptive production simulation structure for operational planning with annual emission/fuel constraints, IEEE Trans, on PWRS, vol. 9, no. 3, Aug. 1994.
    • (1994) IEEE Trans, on PWRS , vol.9 , Issue.3
    • Breipohl, A.M.1    Lee, F.N.2    Lin, M.3    Wang, H.4    Chiang, J.5
  • 13
    • 0033079766 scopus 로고    scopus 로고
    • Probabilistic load variation modeling for estimating the variance of annual production cost
    • Feb.
    • J. Chiang, A. M. Breipohl, F. N. Lee, and R. Adapa, Probabilistic load variation modeling for estimating the variance of annual production cost, IEEE Trans, on PWRS, vol. 14, no. 1Feb. 1999.
    • IEEE Trans, on PWRS , vol.14 , Issue.1 , pp. 1999
    • Chiang, J.1    Breipohl, A.M.2    Lee, F.N.3    Adapa, R.4
  • 14
    • 0026954138 scopus 로고
    • A Gauss-Markov load model for application in risk evaluation and production simulation
    • , Nov.
    • A. M. Breipohl, F. N. Lee, D. Zhai, and R. Adapa, A Gauss-Markov load model for application in risk evaluation and production simulation, IEEE Trans, on PWRS, vol. 7, no. 4, Nov. 1992.
    • (1992) IEEE Trans, on PWRS , vol.7 , Issue.4
    • Breipohl, A.M.1    Lee, F.N.2    Zhai, D.3    Adapa, R.4