메뉴 건너뛰기




Volumn 36, Issue 8, 2004, Pages 711-724

Subcontracting with availability guarantees: Production control and capacity decisions

Author keywords

[No Author keywords available]

Indexed keywords

AVAILABILITY; DECISION THEORY; MARKOV PROCESSES; MATHEMATICAL MODELS; NUMERICAL ANALYSIS; OUTSOURCING; PROBABILITY;

EID: 3242685160     PISSN: 0740817X     EISSN: None     Source Type: Journal    
DOI: 10.1080/07408170490458463     Document Type: Article
Times cited : (16)

References (26)
  • 3
    • 0035435909 scopus 로고    scopus 로고
    • Capacity acquisition, subcontracting, and lot sizing
    • Atamturk, A. and Hochbaum, D.S. (2001) Capacity acquisition, subcontracting, and lot sizing. Management Science, 47, 1081-1100.
    • (2001) Management Science , vol.47 , pp. 1081-1100
    • Atamturk, A.1    Hochbaum, D.S.2
  • 4
    • 0035254165 scopus 로고    scopus 로고
    • A study of simple rules for subcontracting in make-to-order manufacturing
    • Bertrand, J.W. and Sridharan, V. (2001) A study of simple rules for subcontracting in make-to-order manufacturing. European Journal of Operational Research, 128, 509-531.
    • (2001) European Journal of Operational Research , vol.128 , pp. 509-531
    • Bertrand, J.W.1    Sridharan, V.2
  • 5
    • 0024037430 scopus 로고
    • Optimality of zero-inventory policies for unreliable manufacturing systems
    • Bielecki, T. and Kumar, P.R. (1988) Optimality of zero-inventory policies for unreliable manufacturing systems. Operations Research, 36(4), 532-541.
    • (1988) Operations Research , vol.36 , Issue.4 , pp. 532-541
    • Bielecki, T.1    Kumar, P.R.2
  • 8
    • 0036475099 scopus 로고    scopus 로고
    • Managing capacity and inventory jointly in manufacturing systems
    • Bradley, J. and Glynn, P. (2002) Managing capacity and inventory jointly in manufacturing systems. Management Science, 48, 273-288.
    • (2002) Management Science , vol.48 , pp. 273-288
    • Bradley, J.1    Glynn, P.2
  • 9
    • 0036815272 scopus 로고    scopus 로고
    • Competition and outsourcing with scale economies
    • Cachon, G.P. and Harker, P.T. (2002) Competition and outsourcing with scale economies. Management Science, 48(10), 1314-1333.
    • (2002) Management Science , vol.48 , Issue.10 , pp. 1314-1333
    • Cachon, G.P.1    Harker, P.T.2
  • 10
    • 0034508368 scopus 로고    scopus 로고
    • Capacity allocation and outsourcing in a process industry
    • De Kok, T.G. (2000) Capacity allocation and outsourcing in a process industry. International Journal of Production Economics, 68, 229-239.
    • (2000) International Journal of Production Economics , vol.68 , pp. 229-239
    • De Kok, T.G.1
  • 11
    • 0023455979 scopus 로고
    • An optimal stochastic production planning with randomly fluctuating demand
    • Fleming, W., Sethi, S. and Soner, H. (1987) An optimal stochastic production planning with randomly fluctuating demand. SIAM Journal of Control Optimization, 25, 1495-1502.
    • (1987) SIAM Journal of Control Optimization , vol.25 , pp. 1495-1502
    • Fleming, W.1    Sethi, S.2    Soner, H.3
  • 12
    • 0028742537 scopus 로고
    • Subcontracting versus capacity expansion and the impact on pricing of services
    • Gaimon, C. (1994) Subcontracting versus capacity expansion and the impact on pricing of services. Naval Research Logistics, 41(7), 875-892.
    • (1994) Naval Research Logistics , vol.41 , Issue.7 , pp. 875-892
    • Gaimon, C.1
  • 14
    • 0034313858 scopus 로고    scopus 로고
    • Analysis of the effects of uncertainty, risk-pooling, and subcontracting mechanisms on project performance
    • Gutierrez, G. and Paul, A. (2000) Analysis of the effects of uncertainty, risk-pooling, and subcontracting mechanisms on project performance. Operations Research, 48(6), 927-938.
    • (2000) Operations Research , vol.48 , Issue.6 , pp. 927-938
    • Gutierrez, G.1    Paul, A.2
  • 15
    • 0029252650 scopus 로고
    • Production rate control for failure prone production with no backlog permitted
    • Hu, J. (1995) Production rate control for failure prone production with no backlog permitted. IEEE Transactions on Automatic Control, 40(2), 291-295.
    • (1995) IEEE Transactions on Automatic Control , vol.40 , Issue.2 , pp. 291-295
    • Hu, J.1
  • 16
    • 0012309731 scopus 로고    scopus 로고
    • Optimal control of a failure prone manufacturing system with the possibility of temporary increase in production capacity
    • Yin, G. and Zhang, Q. (eds.) Springer-Verlag
    • Huang, L., Hu, J. and Vakili, P. (1996) Optimal control of a failure prone manufacturing system with the possibility of temporary increase in production capacity, in Recent Advances in Control and Optimization of Manufacturing Systems,Yin, G. and Zhang, Q. (eds.) Springer-Verlag, pp. 31-60.
    • (1996) Recent Advances in Control and Optimization of Manufacturing Systems , pp. 31-60
    • Huang, L.1    Hu, J.2    Vakili, P.3
  • 17
    • 0020915621 scopus 로고
    • An algorithm for the computer control of production in a flexible manufacturing systems
    • Kimemia, J.G. and Gershwin, S.B. (1983) An algorithm for the computer control of production in a flexible manufacturing systems. IIE Transaction, 15(4), 353-362.
    • (1983) IIE Transaction , vol.15 , Issue.4 , pp. 353-362
    • Kimemia, J.G.1    Gershwin, S.B.2
  • 18
    • 0036680992 scopus 로고    scopus 로고
    • Supply chain capacity and outsourcing: The dynamic interplay of demand and supply uncertainty
    • Kouvelis, P. and Milner, J.M. (2002) Supply chain capacity and outsourcing: the dynamic interplay of demand and supply uncertainty. IIE Transactions, 34, 717-728.
    • (2002) IIE Transactions , vol.34 , pp. 717-728
    • Kouvelis, P.1    Milner, J.M.2
  • 19
    • 0001520749 scopus 로고
    • Double band policy for stochastic manufacturing systems in heavy traffic
    • Krichagina, E.V., Lou, S.X.C. and Taksar, M.I. (1994) Double band policy for stochastic manufacturing systems in heavy traffic. Mathematics of Operations Research, 19(3), 560-597.
    • (1994) Mathematics of Operations Research , vol.19 , Issue.3 , pp. 560-597
    • Krichagina, E.V.1    Lou, S.X.C.2    Taksar, M.I.3
  • 21
    • 0035279831 scopus 로고    scopus 로고
    • Failure-prone production systems with uncertain demand
    • Perkins, J. and Srikan, R. (2001) Failure-prone production systems with uncertain demand. IEEE Transactions on Automatic Control, 46, 441-449.
    • (2001) IEEE Transactions on Automatic Control , vol.46 , pp. 441-449
    • Perkins, J.1    Srikan, R.2
  • 22
    • 0031220337 scopus 로고    scopus 로고
    • Variance of the throughput of an N-station production line with no intermediate buffers and time dependent failures
    • Tan, B. (1997) Variance of the throughput of an N-station production line with no intermediate buffers and time dependent failures. European Journal of Opeational Research, 101(3), 560-576.
    • (1997) European Journal of Opeational Research , vol.101 , Issue.3 , pp. 560-576
    • Tan, B.1
  • 23
    • 0036576750 scopus 로고    scopus 로고
    • Production control of a pull system with production and demand uncertainty
    • Tan, B. (2002a) Production control of a pull system with production and demand uncertainty. IEEE Transactions on Automatic Control, 47(5), 779-783.
    • (2002) IEEE Transactions on Automatic Control , vol.47 , Issue.5 , pp. 779-783
    • Tan, B.1
  • 24
    • 0036477003 scopus 로고    scopus 로고
    • Managing manufacturing risks by using capacity options
    • Tan, B. (2002b) Managing manufacturing risks by using capacity options. Journal of the Operations Research Society, 53(2), 232-242.
    • (2002) Journal of the Operations Research Society , vol.53 , Issue.2 , pp. 232-242
    • Tan, B.1
  • 25
    • 3242663060 scopus 로고    scopus 로고
    • Production and subcontracting strategies for manufacturers with limited capacity and volatile demand
    • Tab, B. and Gershwin, S.B. (2004) Production and subcontracting strategies for manufacturers with limited capacity and volatile demand. Annals of Operations Research, 125, 205-232.
    • (2004) Annals of Operations Research , vol.125 , pp. 205-232
    • Tab, B.1    Gershwin, S.B.2
  • 26
    • 0032689596 scopus 로고    scopus 로고
    • Coordinating investment, production, and subcontracting
    • Van Mieghem, J.A. (1999) Coordinating investment, production, and subcontracting. Management Science, 45(7), 954-971.
    • (1999) Management Science , vol.45 , Issue.7 , pp. 954-971
    • Van Mieghem, J.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.