메뉴 건너뛰기




Volumn 23, Issue 1, 2006, Pages 34-47

Design for logistics in set-based concurrent engineering environment

Author keywords

Activity based costing; Design for logistics; High level Petri nets; Set based concurrent engineering; TOPSIS

Indexed keywords

DECISION SUPPORT SYSTEMS; LOGISTICS; PETRI NETS; PRODUCT DESIGN;

EID: 31544433672     PISSN: 10170669     EISSN: 21517606     Source Type: Journal    
DOI: 10.1080/10170660609508994     Document Type: Article
Times cited : (6)

References (72)
  • 2
    • 0000151662 scopus 로고
    • The benefits and limitations of structured design methodologies
    • Barkan, P., and Hinckley, C. M., 1993. The benefits and limitations of structured design methodologies. ASME Manufacturing Review, 6 (3):211–220.
    • (1993) ASME Manufacturing Review , vol.6 , Issue.3 , pp. 211-220
    • Barkan, P.1    Hinckley, C.M.2
  • 3
    • 0037431955 scopus 로고    scopus 로고
    • Activity-based cost management for design and development stage
    • Ben-Arieh, D., and Qian, L., 2003. Activity-based cost management for design and development stage. International Journal of Production Economics, 83 (2):169–183.
    • (2003) International Journal of Production Economics , vol.83 , Issue.2 , pp. 169-183
    • Ben-Arieh, D.1    Qian, L.2
  • 4
    • 0026120365 scopus 로고
    • Modeling and verification of time dependent systems using time petri nets
    • Berthomieu, B., and Diaz, M., 1991. Modeling and verification of time dependent systems using time petri nets. IEEE Transactions on Software Engineering, 17:259–273.
    • (1991) IEEE Transactions on Software Engineering , vol.17 , pp. 259-273
    • Berthomieu, B.1    Diaz, M.2
  • 5
    • 0028467828 scopus 로고
    • Product design for manufacture and assembly
    • Boothroyd, G., 1994. Product design for manufacture and assembly. Computer Aided Design,:505–520.
    • (1994) Computer Aided Design , pp. 505-520
    • Boothroyd, G.1
  • 6
    • 0038197200 scopus 로고    scopus 로고
    • Effective collaboration
    • Callioni, G, and Billington, C., 2001. Effective collaboration. OR/MS Today, 28 (5):34–39.
    • (2001) OR/MS Today , vol.28 , Issue.5 , pp. 34-39
    • Callioni, G.1    Billington, C.2
  • 8
    • 0002270606 scopus 로고
    • The rise of activity-based costing—part one: What is an activity-based cost system
    • Cooper, R., 1988. The rise of activity-based costing—part one:what is an activity-based cost system. Journal of Cost Management, 2:45–54.
    • (1988) Journal of Cost Management , vol.2 , pp. 45-54
    • Cooper, R.1
  • 11
    • 0031234653 scopus 로고    scopus 로고
    • The role of product design in designer-buyer-supplier interface
    • Dowlatshahi, S., 1997. The role of product design in designer-buyer-supplier interface. Production Planning and Control, 8 (6):522–532.
    • (1997) Production Planning and Control , vol.8 , Issue.6 , pp. 522-532
    • Dowlatshahi, S.1
  • 12
    • 0344286060 scopus 로고    scopus 로고
    • A modeling approach to logistics in concurrent engineering
    • Dowlatshahi, S., 1999. A modeling approach to logistics in concurrent engineering. European Journal of Operational Research, 115 (1):59–76.
    • (1999) European Journal of Operational Research , vol.115 , Issue.1 , pp. 59-76
    • Dowlatshahi, S.1
  • 14
    • 0033729541 scopus 로고    scopus 로고
    • Evaluation of supply chain structures through modularization and postponement
    • Ernst, R., and Kamrad, B., 2000. Evaluation of supply chain structures through modularization and postponement. European Journal of Operational Research, 124 (3):495–510.
    • (2000) European Journal of Operational Research , vol.124 , Issue.3 , pp. 495-510
    • Ernst, R.1    Kamrad, B.2
  • 16
    • 0001275618 scopus 로고    scopus 로고
    • What is the right supply chain for your product?
    • Fisher, M. L., 1997. What is the right supply chain for your product?. Harvard Business Review,:105–116.
    • (1997) Harvard Business Review , pp. 105-116
    • Fisher, M.L.1
  • 18
    • 0009342508 scopus 로고    scopus 로고
    • Efficient discrete-event simulation of colored petri nets
    • Gaeta, R., 1996. Efficient discrete-event simulation of colored petri nets. IEEE Transactions on Software Engineering, 22 (9):629–639.
    • (1996) IEEE Transactions on Software Engineering , vol.22 , Issue.9 , pp. 629-639
    • Gaeta, R.1
  • 19
    • 0033079793 scopus 로고    scopus 로고
    • A concurrent optimization methodology for concurrent engineering
    • Hatch, M., and Badinelli, R. D., 1999. A concurrent optimization methodology for concurrent engineering. IEEE Transactions on Engineering Management, 46 (1):72–86.
    • (1999) IEEE Transactions on Engineering Management , vol.46 , Issue.1 , pp. 72-86
    • Hatch, M.1    Badinelli, R.D.2
  • 23
    • 0027677566 scopus 로고
    • A new approach for multiple objective decision making
    • Hwang, C. L., Lai, Y. J., and Liu, T. Y., 1993. A new approach for multiple objective decision making. Computer Operation Research, 20:889–899.
    • (1993) Computer Operation Research , vol.20 , pp. 889-899
    • Hwang, C.L.1    Lai, Y.J.2    Liu, T.Y.3
  • 26
    • 0001604985 scopus 로고
    • Coloured Petri nets: A high level language for system design and analysis
    • Rozenberg G., (ed), Berlin: Springer-Verlag
    • Jensen, K., 1990. “ Coloured Petri nets:a high level language for system design and analysis ”. In Advances in Petri Pets, Vol. 483 of Lecture Notes In Computer Science Edited by:Rozenberg, G., 342–416. Berlin:Springer-Verlag.
    • (1990) Advances in Petri Pets, Vol. 483 of Lecture Notes In Computer Science , pp. 342-416
    • Jensen, K.1
  • 27
    • 0031142371 scopus 로고    scopus 로고
    • Identifying investment opportunities for advanced manufacturing systems with comparative-integrated performance measurement
    • Kim, G., Park, C. S., and Yoon, K. P., 1997. Identifying investment opportunities for advanced manufacturing systems with comparative-integrated performance measurement. International Journal of Production Economics, 50 (1):23–33.
    • (1997) International Journal of Production Economics , vol.50 , Issue.1 , pp. 23-33
    • Kim, G.1    Park, C.S.2    Yoon, K.P.3
  • 29
    • 0009380290 scopus 로고
    • Modeling the design process with petri nets
    • Kusiak A., (ed), New York: John Wiley & Sons
    • Kusiak, A., and Yang, H. H., 1993. “ Modeling the design process with petri nets ”. In Concurrent Engineering:Automation, Tools, and Techniques Edited by:Kusiak, A., 447–464. New York:John Wiley & Sons.
    • (1993) Concurrent Engineering: Automation, Tools, and Techniques , pp. 447-464
    • Kusiak, A.1    Yang, H.H.2
  • 31
    • 0036763061 scopus 로고    scopus 로고
    • Design of part family robust-to-production plan variations based on quantitative manufacturability evaluation
    • Lee, B., and Saitou, K., 2002. Design of part family robust-to-production plan variations based on quantitative manufacturability evaluation. Research in Engineering Design, 13:199–212.
    • (2002) Research in Engineering Design , vol.13 , pp. 199-212
    • Lee, B.1    Saitou, K.2
  • 33
    • 0002473927 scopus 로고
    • Hewlett-Packard gains control of inventory and service through design for localization
    • Lee, H. L., Billington, C., and Carter, B., 1993. Hewlett-Packard gains control of inventory and service through design for localization. Interfaces, 23 (4):1–11.
    • (1993) Interfaces , vol.23 , Issue.4 , pp. 1-11
    • Lee, H.L.1    Billington, C.2    Carter, B.3
  • 34
    • 0002397691 scopus 로고    scopus 로고
    • E-fulfillment: Winning the last mile of e-commerce
    • Lee, H. L., and Whang, S., 2001. E-fulfillment:winning the last mile of e-commerce. Sloan Management Review, 42 (4):54–62.
    • (2001) Sloan Management Review , vol.42 , Issue.4 , pp. 54-62
    • Lee, H.L.1    Whang, S.2
  • 36
    • 0030148492 scopus 로고    scopus 로고
    • Involving suppliers in product development in the US and Japan: Evidence for set-based concurrent engineering
    • Liker, J. K., Sobek, D. K., Ward, A. C., and Cristiano, J. J., 1996. Involving suppliers in product development in the US and Japan:evidence for set-based concurrent engineering. IEEE Transactions in Engineering Management, 43 (2):165–177.
    • (1996) IEEE Transactions in Engineering Management , vol.43 , Issue.2 , pp. 165-177
    • Liker, J.K.1    Sobek, D.K.2    Ward, A.C.3    Cristiano, J.J.4
  • 37
    • 84976753721 scopus 로고
    • A class of generalized stochastic petri nets for the performance evaluation of multiprocessor systems
    • Marsan, M. J., Balbo, G., and Conte, G., 1984. A class of generalized stochastic petri nets for the performance evaluation of multiprocessor systems. ACM Transactions on Computer Systems, 2:93–122.
    • (1984) ACM Transactions on Computer Systems , vol.2 , pp. 93-122
    • Marsan, M.J.1    Balbo, G.2    Conte, G.3
  • 38
    • 0345296554 scopus 로고
    • Design for logistics (DFL)—the next challenge for designers
    • Mather, H., 1992. Design for logistics (DFL)—the next challenge for designers. Production and Inventory Management Journal, 33:7–10.
    • (1992) Production and Inventory Management Journal , vol.33 , pp. 7-10
    • Mather, H.1
  • 41
    • 0024645936 scopus 로고
    • Petri nets: Properties, analysis and applications
    • Murata, T., 1989. Petri nets:properties, analysis and applications. Proceedings of the IEEE, 77:541–580.
    • (1989) Proceedings of the IEEE , vol.77 , pp. 541-580
    • Murata, T.1
  • 42
    • 1842680394 scopus 로고    scopus 로고
    • Integrated product and process modeling for collaborative design environment
    • Nahm, Y. E., and Ishikawa, H., 2004. Integrated product and process modeling for collaborative design environment. Concurrent Engineering:Research and Applications, 12 (1):5–23.
    • (2004) Concurrent Engineering: Research and Applications , vol.12 , Issue.1 , pp. 5-23
    • Nahm, Y.E.1    Ishikawa, H.2
  • 46
    • 0009381934 scopus 로고
    • Concurrent engineering and enterprise modeling
    • Ranky, P. G., 1994. Concurrent engineering and enterprise modeling. Assembly Automation, 14 (3):14–21.
    • (1994) Assembly Automation , vol.14 , Issue.3 , pp. 14-21
    • Ranky, P.G.1
  • 49
    • 0036722566 scopus 로고    scopus 로고
    • Modularity, product variety, production volume, and component sourcing: Theorizing beyond generic prescriptions
    • Salvador, F., Forza, C., and Rungtusanatham, M., 2002. Modularity, product variety, production volume, and component sourcing:theorizing beyond generic prescriptions. Journal of Operations Management, 20 (5):549–575.
    • (2002) Journal of Operations Management , vol.20 , Issue.5 , pp. 549-575
    • Salvador, F.1    Forza, C.2    Rungtusanatham, M.3
  • 53
    • 0001817489 scopus 로고    scopus 로고
    • Toyota's principles of set-based concurrent engineering
    • Sobek, D.K., II, Ward, A. C., and Liker, J. K., 1999. Toyota's principles of set-based concurrent engineering. Sloan Management Review, 40 (2):67–83.
    • (1999) Sloan Management Review , vol.40 , Issue.2 , pp. 67-83
    • Sobek, D.K.1    Ward, A.C.2    Liker, J.K.3
  • 54
    • 0032737809 scopus 로고    scopus 로고
    • Application of discrete event simulation to the activity based costing of manufacturing systems
    • Spedding, T. A., and Sun, G. Q., 1999. Application of discrete event simulation to the activity based costing of manufacturing systems. International Journal of Production Economics, 58:289–301.
    • (1999) International Journal of Production Economics , vol.58 , pp. 289-301
    • Spedding, T.A.1    Sun, G.Q.2
  • 55
    • 85024538151 scopus 로고    scopus 로고
    • Supply-Chain Council, Project Concept for Product Design for Supply Chain, Supply-Chain Council, Inc. (2003)
    • Supply-Chain Council, Project Concept for Product Design for Supply Chain, http://www.supply-chain.org, Supply-Chain Council, Inc. (2003).
  • 56
    • 0031175567 scopus 로고    scopus 로고
    • Design for global manufacturing and assembly
    • Taylor, G. D., 1997. Design for global manufacturing and assembly. IIE Transactions, 29 (7):585–597.
    • (1997) IIE Transactions , vol.29 , Issue.7 , pp. 585-597
    • Taylor, G.D.1
  • 57
    • 1542694587 scopus 로고
    • What is the scope of activity based costing
    • Turney, P. B., 1990. What is the scope of activity based costing. Journal of Cost Management, 3:40–42.
    • (1990) Journal of Cost Management , vol.3 , pp. 40-42
    • Turney, P.B.1
  • 58
    • 0002400997 scopus 로고
    • What an activity based costing model look like
    • Turney, P. B., 1992. What an activity based costing model look like. Journal of Cost Management, 5:54–60.
    • (1992) Journal of Cost Management , vol.5 , pp. 54-60
    • Turney, P.B.1
  • 60
    • 31544444614 scopus 로고
    • Modeling and analysis of complex logistics systems
    • Pels H.J., Wortmann J.C., (eds), Elservier Science Publishers, Amsterdam
    • van der Aalst, W. M. P., 1992. “ Modeling and analysis of complex logistics systems ”. In Integration in Production Management Systems Vol. B-7 of IFIP Transactions Edited by:Pels, H. J., and Wortmann, J. C., 277–292. Elservier Science Publishers, Amsterdam.
    • (1992) Integration in Production Management Systems Vol. B-7 of IFIP Transactions , pp. 277-292
    • van der Aalst, W.M.P.1
  • 61
    • 0030190585 scopus 로고    scopus 로고
    • Business process redesign: A petri-net-based approach
    • van der Aalst, W. M.P., and van Hee, K. M., 1996. Business process redesign:a petri-net-based approach. Computers in Industry, 29 (1-2):15–26.
    • (1996) Computers in Industry , vol.29 , Issue.1-2 , pp. 15-26
    • van der Aalst, W.M.P.1    van Hee, K.M.2
  • 62
    • 85024551302 scopus 로고    scopus 로고
    • van der Aalst W. M. P., Hofstede A., Workflow Patterns, (2003)
    • van der Aalst W. M. P., Hofstede A., Workflow Patterns, http://tmitwww.tm.tue.nl/research/patterns/ (2003)
  • 64
    • 0037666034 scopus 로고    scopus 로고
    • Interactive evolutionary solution synthesis in fuzzy set-based preliminary engineering design
    • Wang, J., and Terpenny, J., 2003. Interactive evolutionary solution synthesis in fuzzy set-based preliminary engineering design. Journal of Intelligent Manufacturing, 14 (2):153–167.
    • (2003) Journal of Intelligent Manufacturing , vol.14 , Issue.2 , pp. 153-167
    • Wang, J.1    Terpenny, J.2
  • 65
    • 0002533915 scopus 로고
    • The second Toyota paradox: How delaying decisions can make better cars faster
    • Ward, A., Liker, J. K., Sobek, D., and Cristiano, J., 1995. The second Toyota paradox:how delaying decisions can make better cars faster. Sloan Management Review, 36 (3):43–61.
    • (1995) Sloan Management Review , vol.36 , Issue.3 , pp. 43-61
    • Ward, A.1    Liker, J.K.2    Sobek, D.3    Cristiano, J.4
  • 68
    • 0026825151 scopus 로고
    • Creating project plans to focus product development
    • Wheelwright, S. C., and Clark, K. B., 1992. Creating project plans to focus product development. Harvard Business Review, 70 (2):70–82.
    • (1992) Harvard Business Review , vol.70 , Issue.2 , pp. 70-82
    • Wheelwright, S.C.1    Clark, K.B.2
  • 69
    • 0041386427 scopus 로고    scopus 로고
    • A strategic model for supply chain design with logical constraints: Formulation and solution
    • Yan, H., Yu, X., and Cheng, T. C. E., 2003. A strategic model for supply chain design with logical constraints:formulation and solution. Computers and Operations Research, 30:2135–2155.
    • (2003) Computers and Operations Research , vol.30 , pp. 2135-2155
    • Yan, H.1    Yu, X.2    Cheng, T.C.E.3
  • 70


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.