-
1
-
-
33747249376
-
Air Force Maintenance Munitions and Supply Management Engineering Team
-
4.1," Wright-Patterson Air Force Base, OH,1982.
-
Air Force Maintenance Munitions and Supply Management Engineering Team, "Logistics composite model, user's guide version4.1," Wright-Patterson Air Force Base, OH,1982.
-
"Logistics Composite Model, User's Guide Version
-
-
-
2
-
-
33747325347
-
-
Wright-Patterson Air Force Base, OH,1986.
-
Air Force Material Command, "Logistics assessment work station (LAWS), functional description," Air Force Wright Aeronautical Lab., Wright-Patterson Air Force Base, OH,1986.
-
"Logistics Assessment Work Station (LAWS), Functional Description," Air Force Wright Aeronautical Lab.
-
-
-
3
-
-
0020203624
-
"On optimal replacement policies,"
-
vol. 28,no. 1
-
D. Assaf and B. Levikson, "On optimal replacement policies," Manag. Sci.,vol. 28,no. 11, pp. 439-452,1982.
-
Manag. Sci.
, pp. 439-452
-
-
Assaf, D.1
Levikson, B.2
-
4
-
-
84985765902
-
"Multiattribute decision making with inexact value-function assessment,"
-
vol. 21,no. 2,pp. 318-336,1990.
-
R. D. Badinelli and J. R. Baker, "Multiattribute decision making with inexact value-function assessment," Decision Sci.,vol. 21,no. 2,pp. 318-336,1990.
-
Decision Sci.
-
-
Badinelli, R.D.1
Baker, J.R.2
-
7
-
-
0021436204
-
"A preventive replacement policy for units subject to intermittent demand,"
-
vol. 32,no. 3,pp. 584-595,1984.
-
M. Berg, "A preventive replacement policy for units subject to intermittent demand," Oper. Res., vol. 32,no. 3,pp. 584-595,1984.
-
Oper. Res.
-
-
Berg, M.1
-
8
-
-
0342282440
-
"Using simulation to solve design and operational problems,"
-
vol. 10,no. 9,pp. 89-105,1990.
-
K. Chaharbaghi, "Using simulation to solve design and operational problems," Int. J. Oper. Production Manag.,vol. 10,no. 9,pp. 89-105,1990.
-
Int. J. Oper. Production Manag.
-
-
Chaharbaghi, K.1
-
9
-
-
33747263770
-
-
L. Chapman, A. T. Bahill, and A. W. Wynore, Engineering Modeling and Design. Boca Raton, FL: CRC Press,1992.
-
Engineering Modeling and Design. Boca Raton, FL: CRC Press,1992.
-
-
Chapman, L.1
Bahill, A.T.2
Wynore, A.W.3
-
10
-
-
0005661138
-
"An informal survey of multi-echelon inventory theory,"
-
vol. 19,no. 4,pp. 621-649,1972.
-
A. Clark, "An informal survey of multi-echelon inventory theory," Naval Res. Logistics Quart.,vol. 19,no. 4,pp. 621-649,1972.
-
Naval Res. Logistics Quart.
-
-
Clark, A.1
-
11
-
-
33747271884
-
"Integrated weapon system program management,"
-
63-107, Aug.1994.
-
Department of the Air Force, "Integrated weapon system program management," Air Force Instruction63-107, Aug.1994.
-
Air Force Instruction
-
-
-
12
-
-
33747264406
-
-
1," Acquisition, Logistics Div., WPAFB, OH,1990.
-
Department of the Air Force, "Network repair level analysis, user's guide version1," Acquisition, Logistics Div., WPAFB, OH,1990.
-
"Network Repair Level Analysis, User's Guide Version
-
-
-
13
-
-
0030193478
-
"An organization ontology for enterprise modeling: Preliminary concepts for linking structure and behavior,"
-
vol. 29,pp. 123-134, July1996.
-
M. S. Fox, M. Barbuceanu, and M. Gruninger, "An organization ontology for enterprise modeling: Preliminary concepts for linking structure and behavior," Comput. Ind.,vol. 29,pp. 123-134, July1996.
-
Comput. Ind.
-
-
Fox, M.S.1
Barbuceanu, M.2
Gruninger, M.3
-
14
-
-
0021484181
-
"What does 'product quality' really mean?,"
-
vol. 26,no. 1,pp. 25-43,1984.
-
D. Garvin, "What does 'product quality' really mean?," Sloan Manag. Rev.,vol. 26,no. 1,pp. 25-43,1984.
-
Sloan Manag. Rev.
-
-
Garvin, D.1
-
15
-
-
0345728127
-
"Assessment of aircraft logistics planning models,"
-
vol. 9,no. 1,pp. 59-69,1981.
-
M. A. Geisler and B. L. Murrie, "Assessment of aircraft logistics planning models," Omega,vol. 9,no. 1,pp. 59-69,1981.
-
Omega
-
-
Geisler, M.A.1
Murrie, B.L.2
-
16
-
-
0018014639
-
"Spares provisioning for repairable items: Cyclic queues in light traffic,"
-
vol. 10,no. 3,pp. 307-314,1978.
-
D. Gross and J. F. Ince, "Spares provisioning for repairable items: Cyclic queues in light traffic," AUE Trans.,vol. 10,no. 3,pp. 307-314,1978.
-
AUE Trans.
-
-
Gross, D.1
Ince, J.F.2
-
18
-
-
0344865318
-
-
Ph.D. dissertation, Virginia Polytechnic Institute and State University, Blacksburg,1994.
-
M. Hatch, "Concurrent optimization in designing for logistics support," Ph.D. dissertation, Virginia Polytechnic Institute and State University, Blacksburg,1994.
-
"Concurrent Optimization in Designing for Logistics Support,"
-
-
Hatch, M.1
-
19
-
-
0041511475
-
"An overview on available models and techniques for the multi-criteria reliability problem with emphasis on a potential use in a DSS for this problem type,"
-
vol. 16,pp. 413-424,1988.
-
P. Jedrezejowicz, "An overview on available models and techniques for the multi-criteria reliability problem with emphasis on a potential use in a DSS for this problem type," Ann. Oper. Res.,vol. 16,pp. 413-424,1988.
-
Ann. Oper. Res.
-
-
Jedrezejowicz, P.1
-
20
-
-
0022160716
-
"An optimum multiechelon repair policy and stockage model,"
-
vol. 32,no. 4,pp. 551-566,1985.
-
A. Kaplan and D. Orr, "An optimum multiechelon repair policy and stockage model," Naval Res. Logistics Quart.,vol. 32,no. 4,pp. 551-566,1985.
-
Naval Res. Logistics Quart.
-
-
Kaplan, A.1
Orr, D.2
-
21
-
-
3843142536
-
"The JIT spiral of continuous improvement,"
-
vol. 89,no. 4,pp. 10-13,1989.
-
R. Lea and B. Parker, "The JIT spiral of continuous improvement," Ind. Manag. Data Syst.,vol. 89,no. 4,pp. 10-13,1989.
-
Ind. Manag. Data Syst.
-
-
Lea, R.1
Parker, B.2
-
22
-
-
0015723595
-
"Optimal reliability design of a system: A new look,"
-
22,no. 3,pp. 255-258,1973.
-
B. Misra and M. D. Ljubojevic, "Optimal reliability design of a system: A new look," IEEE Trans. Reliability, vol. R-22,no. 3,pp. 255-258,1973.
-
IEEE Trans. Reliability, Vol. R
-
-
Misra, B.1
Ljubojevic, M.D.2
-
23
-
-
0000218363
-
"Optimal reliability choice in product design,"
-
vol. 15,no. 4,pp. 281-294,1990.
-
D. Murthy, "Optimal reliability choice in product design," Eng. Optimization,vol. 15,no. 4,pp. 281-294,1990.
-
Eng. Optimization
-
-
Murthy, D.1
-
24
-
-
84986847074
-
"Concurrent engineering with early supplier involvement: A cross-functional challenge,"
-
vol. 29,no. 2,pp. 3-9, Spring1993.
-
C. O'Neal, "Concurrent engineering with early supplier involvement: A cross-functional challenge," Int. J. Purchasing and Materials Manag.,vol. 29,no. 2,pp. 3-9, Spring1993.
-
Int. J. Purchasing and Materials Manag.
-
-
O'Neal, C.1
-
25
-
-
0030149936
-
"Multiobjective concurrent engineering: A goal programming approach,"
-
vol. 43,pp. 202-209, May1996.
-
M. Schniederjans and S. Hong, "Multiobjective concurrent engineering: A goal programming approach," IEEE Trans. Eng. Manage.,vol. 43,pp. 202-209, May1996.
-
IEEE Trans. Eng. Manage.
-
-
Schniederjans, M.1
Hong, S.2
-
26
-
-
0002765931
-
"Models for managing the redesign and manufacture of product sets,"
-
vol. 3,no. 2,pp. 85-104,1990.
-
G. Shirley, "Models for managing the redesign and manufacture of product sets," J. Manufacturing and Manag.,vol. 3,no. 2,pp. 85-104,1990.
-
J. Manufacturing and Manag.
-
-
Shirley, G.1
-
27
-
-
0030211555
-
"An intelligent-agent framework for concurrent product design and planning,"
-
vol. 43,pp. 297-306, Aug.1996.
-
G. W. Tan, C. C. Hayes, and M. Shaw, "An intelligent-agent framework for concurrent product design and planning," IEEE Trans. Eng. Manage.,vol. 43,pp. 297-306, Aug.1996.
-
IEEE Trans. Eng. Manage.
-
-
Tan, G.W.1
Hayes, C.C.2
Shaw, M.3
-
28
-
-
0023386648
-
"Reliability, pricing and quality control,"
-
vol. 31,no. 1,pp. 37-45,1987.
-
C. Tapiero, P. H. Ritchken, and A. Reisman, "Reliability, pricing and quality control," Europ. J. Oper. Res.,vol. 31,no. 1,pp. 37-45,1987.
-
Europ. J. Oper. Res.
-
-
Tapiero, C.1
Ritchken, P.H.2
Reisman, A.3
-
29
-
-
0022805685
-
"Optimal replacement for fault-tolerant systems,"
-
vol. 33,no. 4,pp. 747-757,1986.
-
B. Taylor and B. E. Rodriguez, "Optimal replacement for fault-tolerant systems," Naval Res. Logistics Quart.,vol. 33,no. 4,pp. 747-757,1986.
-
Naval Res. Logistics Quart.
-
-
Taylor, B.1
Rodriguez, B.E.2
-
30
-
-
33747316892
-
"Manufacturing by design,"
-
vol. 66,no. 4,pp. 83-91, July-Aug.1988.
-
D. E. Whitney, "Manufacturing by design," Harvard Bus. Rev.,vol. 66,no. 4,pp. 83-91, July-Aug.1988.
-
Harvard Bus. Rev.
-
-
Whitney, D.E.1
-
31
-
-
0001110621
-
"Concurrent subspace optimization using design variables sharing in a distributed computing environment,"
-
vol. 4,no. 4,pp. 361-377, Dec.1996.
-
B. Wujek, J. Renaud, S. Batill, and J. Brockman, "Concurrent subspace optimization using design variables sharing in a distributed computing environment," Concurrent Eng.,vol. 4,no. 4,pp. 361-377, Dec.1996.
-
Concurrent Eng.
-
-
Wujek, B.1
Renaud, J.2
Batill, S.3
Brockman, J.4
-
32
-
-
33747267316
-
"Concurrent optimization of product design and manufacture," in
-
M. Yoshimura, "Concurrent optimization of product design and manufacture," in Concurrent Engineering Contemporary Issues and Modern Practices, H. Parsaei and W. Sullivan, Eds. London: Chapman & Hall,1993.
-
Concurrent Engineering Contemporary Issues and Modern Practices, H. Parsaei and W. Sullivan, Eds. London: Chapman & Hall,1993.
-
-
Yoshimura, M.1
-
33
-
-
0000929350
-
"Product design based on concurrent processing of design and manufacturing information by utility analysis,"
-
vol. 4,no. 4,pp. 379-387, Dec.1996.
-
M. Yoshimura and H. Kondo, "Product design based on concurrent processing of design and manufacturing information by utility analysis," Concurrent Eng.,vol. 4,no. 4,pp. 379-387, Dec.1996.
-
Concurrent Eng.
-
-
Yoshimura, M.1
Kondo, H.2
|