메뉴 건너뛰기




Volumn 42, Issue 15, 2004, Pages 3055-3076

Feasibility study of the tactical design justification for reconfigurable manufacturing systems using the fuzzy analytical hierarchical process

Author keywords

[No Author keywords available]

Indexed keywords

COST BENEFIT ANALYSIS; CUSTOMER SATISFACTION; INTEGER PROGRAMMING; INVESTMENTS; MARKETING; PROCESS CONTROL; PRODUCT DESIGN; PRODUCTIVITY; SYSTEMS ANALYSIS;

EID: 3142717012     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207540410001696041     Document Type: Article
Times cited : (60)

References (22)
  • 1
    • 0242269877 scopus 로고    scopus 로고
    • A design strategy for reconfigurable manufacturing systems (RMSs) using the analytical hierarchical process (AHP): A case study
    • ABDI, M. R. and LABIB, A. W., 2003, A design strategy for reconfigurable manufacturing systems (RMSs) using the analytical hierarchical process (AHP): a case study. International Journal of Production Research, 41, 2273-2299.
    • (2003) International Journal of Production Research , vol.41 , pp. 2273-2299
    • Abdi, M.R.1    Labib, A.W.2
  • 2
    • 1342308539 scopus 로고    scopus 로고
    • Grouping and selecting products: The design key of reconfigurable manufacturing systems (RMSs)
    • ABDI, M. R. and LABIB, A. W., 2004, Grouping and selecting products: the design key of reconfigurable manufacturing systems (RMSs). International Journal of Production Research, 42, 521-546.
    • (2004) International Journal of Production Research , vol.42 , pp. 521-546
    • Abdi, M.R.1    Labib, A.W.2
  • 3
    • 0000672127 scopus 로고    scopus 로고
    • Theory and methodology: Application of the extent analysis method on fuzzy AHP
    • CHANG, D.-Y., 1996, Theory and methodology: application of the extent analysis method on fuzzy AHP. European Journal of Operational Research, 95, 649-655.
    • (1996) European Journal of Operational Research , vol.95 , pp. 649-655
    • Chang, D.-Y.1
  • 4
    • 0028500315 scopus 로고
    • Fuzzy cash flow analysis using present worth criterion
    • CHUI, C. and PARKS, C. S., 1994, Fuzzy cash flow analysis using present worth criterion. Engineering Economist, 39, 113-138.
    • (1994) Engineering Economist , vol.39 , pp. 113-138
    • Chui, C.1    Parks, C.S.2
  • 5
    • 0242329126 scopus 로고    scopus 로고
    • Pittsburgh: Expert Choice
    • EXPERT CHOICE, 1999, Expert Choice [software] (Pittsburgh: Expert Choice).
    • (1999) Expert Choice [Software]
  • 7
    • 0002067529 scopus 로고    scopus 로고
    • Justification of manufacturing technologies using fuzzy benefit/cost ratio analysis
    • KAHRAMAN C., TOLGA, E. and ULUKAN, Z., 2000, Justification of manufacturing technologies using fuzzy benefit/cost ratio analysis. International Journal of Production Economics, 66, 45-52.
    • (2000) International Journal of Production Economics , vol.66 , pp. 45-52
    • Kahraman, C.1    Tolga, E.2    Ulukan, Z.3
  • 9
    • 0034230856 scopus 로고    scopus 로고
    • On consistency and ranking of alternatives in fuzzy AHP
    • LEUNG, L. C. and CAO, D., 2000, On consistency and ranking of alternatives in fuzzy AHP. European Journal of Operational Research, 124, 102-113.
    • (2000) European Journal of Operational Research , vol.124 , pp. 102-113
    • Leung, L.C.1    Cao, D.2
  • 10
    • 0036300907 scopus 로고    scopus 로고
    • Selecting manufacturing system configurations based on performance using AHP
    • MAIER-SPEREDELOZZI, V. and HU, S. J., 2002, Selecting manufacturing system configurations based on performance using AHP. Transactions of NAMRI (West Lafayette), pp. 1-80.
    • (2002) Transactions of NAMRI (West Lafayette) , pp. 1-80
    • Maier-Speredelozzi, V.1    Hu, S.J.2
  • 11
    • 0038515132 scopus 로고    scopus 로고
    • A new fuzzy AHP method for the evaluation of automated manufacturing systems
    • MONITTO, M., PAPPALARDO, T. and TOLIO, T., 2002, A new fuzzy AHP method for the evaluation of automated manufacturing systems. Annals of the CIRP, 51, 395-398.
    • (2002) Annals of the CIRP , vol.51 , pp. 395-398
    • Monitto, M.1    Pappalardo, T.2    Tolio, T.3
  • 14
    • 0035872165 scopus 로고    scopus 로고
    • Application of new fuzzy-weighted average (NFWA) method to engineering design evaluation
    • VANEGAS, L. V. and LABIB, A. W., 2001, Application of new fuzzy-weighted average (NFWA) method to engineering design evaluation. International Journal of Production Research, 39, 1147-1162.
    • (2001) International Journal of Production Research , vol.39 , pp. 1147-1162
    • Vanegas, L.V.1    Labib, A.W.2
  • 16
    • 0000105320 scopus 로고
    • Information systems investments: Evaluation at the feasibility stage of projects
    • WILLCOCKS L. and LESTER, S., 1991, Information systems investments: evaluation at the feasibility stage of projects. Technovation, 11, 283-302.
    • (1991) Technovation , vol.11 , pp. 283-302
    • Willcocks, L.1    Lester, S.2
  • 17
    • 0009672516 scopus 로고    scopus 로고
    • Productivity analysis of a six CNC machine manufacturing system with different configurations
    • Ann Arbor, MI
    • YANG, S. and HU, S. J., 2000, Productivity analysis of a six CNC machine manufacturing system with different configurations. Proceeding of the 2000 Japan-USA Flexible Automation Conference, Ann Arbor, MI, pp. 499-505.
    • (2000) Proceeding of the 2000 Japan-USA Flexible Automation Conference , pp. 499-505
    • Yang, S.1    Hu, S.J.2
  • 20
    • 0034631276 scopus 로고    scopus 로고
    • A stochastic model of a reconfigurable manufacturing system, Part 1: A framework
    • ZHAO, X., WANG, J. and LUO, Z., 2000, A stochastic model of a reconfigurable manufacturing system, Part 1: A framework. International Journal of Production Research, 38, 2273-2285.
    • (2000) International Journal of Production Research , vol.38 , pp. 2273-2285
    • Zhao, X.1    Wang, J.2    Luo, Z.3
  • 21
    • 0035836311 scopus 로고    scopus 로고
    • A stochastic model of a reconfigurable manufacturing system, Part 3: Optimal selection policy
    • ZHAO, X., WANG, J. and LUO, Z., 2001, A stochastic model of a reconfigurable manufacturing system, Part 3: Optimal selection policy. International Journal of Production Research, 39, 747-758.
    • (2001) International Journal of Production Research , vol.39 , pp. 747-758
    • Zhao, X.1    Wang, J.2    Luo, Z.3
  • 22


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.