-
1
-
-
0022230489
-
Determining economic maintenance frequency for a family of machines
-
Goyal, S.K. and Kusy, M.I., 1985, Determining economic maintenance frequency for a family of machines. Journal of the Operational Research Society, 36(12), 1125-1128.
-
(1985)
Journal of the Operational Research Society
, vol.36
, Issue.12
, pp. 1125-1128
-
-
Goyal, S.K.1
Kusy, M.I.2
-
2
-
-
0024961505
-
Joint replenishment inventory control: Deterministic and stochastic models
-
Goyal, S.K. and Satir, A.T., 1989, Joint replenishment inventory control: deterministic and stochastic models. European Journal of Operational Research, 38, 2-13.
-
(1989)
European Journal of Operational Research
, vol.38
, pp. 2-13
-
-
Goyal, S.K.1
Satir, A.T.2
-
3
-
-
0027544486
-
A note on the joint replenishment problem under constant demand
-
van Eijs, M.J.G., 1993, A note on the joint replenishment problem under constant demand. Journal of the Operational Research Society, 44, 185-191.
-
(1993)
Journal of the Operational Research Society
, vol.44
, pp. 185-191
-
-
Van Eijs, M.J.G.1
-
4
-
-
0030193062
-
A new optimal algorithm for the joint replenishment problem
-
Viswanathan, S., 1996, A new optimal algorithm for the joint replenishment problem. Journal of the Operational Research Society, 47, 936-944.
-
(1996)
Journal of the Operational Research Society
, vol.47
, pp. 936-944
-
-
Viswanathan, S.1
-
5
-
-
0036849520
-
On optimal algorithms for the joint replenishment problem
-
Viswanathan, S., 2002, On optimal algorithms for the joint replenishment problem. Journal of the Operational Research Society, 53, 1286-1290.
-
(2002)
Journal of the Operational Research Society
, vol.53
, pp. 1286-1290
-
-
Viswanathan, S.1
-
6
-
-
0035280433
-
A new method for joint replenishment problems
-
Fung, R.Y.K. and Ma, X., 2001, A new method for joint replenishment problems. Journal of the Operational Research Society, 52, 358-362.
-
(2001)
Journal of the Operational Research Society
, vol.52
, pp. 358-362
-
-
Fung, R.Y.K.1
Ma, X.2
-
7
-
-
0037411895
-
On the joint replenishment problem under power-of-two policy
-
Lee, F.C. and Yao, M.J., 2003, On the joint replenishment problem under power-of-two policy. Computers and Operations Research, 30, 1319-1333.
-
(2003)
Computers and Operations Research
, vol.30
, pp. 1319-1333
-
-
Lee, F.C.1
Yao, M.J.2
-
8
-
-
0024641438
-
Computational complexity of uncapacitated multi-echlon production planning problems
-
Arkin, E., Joneja, D. and Roundy, R., 1989, Computational complexity of uncapacitated multi-echlon production planning problems. Operations Research Letters, 8, 61-66.
-
(1989)
Operations Research Letters
, vol.8
, pp. 61-66
-
-
Arkin, E.1
Joneja, D.2
Roundy, R.3
-
9
-
-
0025807474
-
Single machine scheduling with nonlinear cost functions
-
Alidaee, B., 1991, Single machine scheduling with nonlinear cost functions. Computers and Operations Research, 18(3), 317-322.
-
(1991)
Computers and Operations Research
, vol.18
, Issue.3
, pp. 317-322
-
-
Alidaee, B.1
-
10
-
-
0027541962
-
Numerical methods for single machine scheduling with non-linear cost functions to minimize total cost
-
Alidaee B., 1993, Numerical methods for single machine scheduling with non-linear cost functions to minimize total cost. Journal of the Operational Research Society, 44(2), 125-132.
-
(1993)
Journal of the Operational Research Society
, vol.44
, Issue.2
, pp. 125-132
-
-
Alidaee, B.1
-
11
-
-
0015983760
-
Preparedness model dealing with N systems operating simultaneously
-
Luss, H. and Kander, Z., 1974, Preparedness model dealing with N systems operating simultaneously. Operations Research, 22(1), 117-128.
-
(1974)
Operations Research
, vol.22
, Issue.1
, pp. 117-128
-
-
Luss, H.1
Kander, Z.2
-
12
-
-
0016928123
-
Maintenance policies when deterioration can be observed by inspections
-
Luss, H., 1976, Maintenance policies when deterioration can be observed by inspections. Operations Research, 24(2), 359-366.
-
(1976)
Operations Research
, vol.24
, Issue.2
, pp. 359-366
-
-
Luss, H.1
-
13
-
-
0017719787
-
Scheduling overhauls of soaking pits
-
Christer, A.H. and Doherty, T., 1977, Scheduling overhauls of soaking pits. Operational Research Quarterly, 28(4), 915-926.
-
(1977)
Operational Research Quarterly
, vol.28
, Issue.4
, pp. 915-926
-
-
Christer, A.H.1
Doherty, T.2
-
14
-
-
0018441246
-
Determination of coordinated maintenance scheduling frequencies for a group of machines
-
Sule, D.R. and Harmon, B., 1979, Determination of coordinated maintenance scheduling frequencies for a group of machines. AIIE Transactions, 11(1), 48-53.
-
(1979)
AIIE Transactions
, vol.11
, Issue.1
, pp. 48-53
-
-
Sule, D.R.1
Harmon, B.2
-
15
-
-
0026417692
-
A survey of maintenance models for multi-unit systems
-
Cho, D.I. and Parlar, M., 1991, A survey of maintenance models for multi-unit systems. European Journal of Operational Research, 51, 1-23.
-
(1991)
European Journal of Operational Research
, vol.51
, pp. 1-23
-
-
Cho, D.I.1
Parlar, M.2
-
16
-
-
0030651031
-
A review of multi-component maintenance models with economic dependence
-
Dekker, R., Wildeman, R. and van der Duyn Scheuten, F., 1997, A review of multi-component maintenance models with economic dependence. Mathematical Methods of Operations Research, 45, 411-435.
-
(1997)
Mathematical Methods of Operations Research
, vol.45
, pp. 411-435
-
-
Dekker, R.1
Wildeman, R.2
Van Der Duyn Scheuten, F.3
-
17
-
-
0001014155
-
Exact computation of optimal inventory policy over an unbounded horizon
-
Hassin, R. and Megiddo, N., 1991, Exact computation of optimal inventory policy over an unbounded horizon. Mathematics of Operations Research, 16, 534-546.
-
(1991)
Mathematics of Operations Research
, vol.16
, pp. 534-546
-
-
Hassin, R.1
Megiddo, N.2
-
18
-
-
0026883290
-
Pinwheel scheduling with two distinct numbers
-
Holte, R., Rosier, Z., Tulchinsky, I. and Varvel, D., 1992, Pinwheel scheduling with two distinct numbers. Theoretical Computer Science, 100, 105-135.
-
(1992)
Theoretical Computer Science
, vol.100
, pp. 105-135
-
-
Holte, R.1
Rosier, Z.2
Tulchinsky, I.3
Varvel, D.4
-
19
-
-
0006474341
-
Determining economic maintenance frequency of a transportation fleet
-
Goyal, S.K. and Gunasekaran, A., 1992, Determining economic maintenance frequency of a transportation fleet. International Journal of Systems Science, 23(4), 655-659.
-
(1992)
International Journal of Systems Science
, vol.23
, Issue.4
, pp. 655-659
-
-
Goyal, S.K.1
Gunasekaran, A.2
-
20
-
-
0026882102
-
General schedulers for the pinwheel problem based on double-integer reduction
-
Chan, M. Y. and Chin, F., 1992, General schedulers for the pinwheel problem based on double-integer reduction. IEEE Transactions on Computers, 41(6), 755-768.
-
(1992)
IEEE Transactions on Computers
, vol.41
, Issue.6
, pp. 755-768
-
-
Chan, M.Y.1
Chin, F.2
-
21
-
-
0001244709
-
Schedulers for larger classes of pinwheel instances
-
Chan, M.Y. and Chin, F., 1993, Schedulers for larger classes of pinwheel instances. Algorithmica, 9, 425-462.
-
(1993)
Algorithmica
, vol.9
, pp. 425-462
-
-
Chan, M.Y.1
Chin, F.2
-
22
-
-
0026930528
-
Feasibility of scheduling lot sizes of three products on one machine
-
Glass, C.A., 1992, Feasibility of scheduling lot sizes of three products on one machine. Management Science, 38, 1482-1494.
-
(1992)
Management Science
, vol.38
, pp. 1482-1494
-
-
Glass, C.A.1
-
23
-
-
0028769415
-
Feasibility of scheduling lot sizes of two frequencies on one machine
-
Glass, C.A., 1994, Feasibility of scheduling lot sizes of two frequencies on one machine. European Journal of Operational Research, 75, 354-364.
-
(1994)
European Journal of Operational Research
, vol.75
, pp. 354-364
-
-
Glass, C.A.1
-
24
-
-
0031352888
-
Broadcast scheduling for information distribution
-
Kobe, Japan
-
Su, C. and Tassiulas, L., 1997, Broadcast scheduling for information distribution. Proceeding of IEEE Infocom (Infocom 97), Kobe, Japan, 109-117.
-
(1997)
Proceeding of IEEE Infocom (Infocom 97)
, pp. 109-117
-
-
Su, C.1
Tassiulas, L.2
-
25
-
-
0036670971
-
Minimizing service and operation costs of periodic scheduling
-
Amotz, B.N., Bhatia, R., Naor, J. and Schieber, B., 2002, Minimizing service and operation costs of periodic scheduling. Mathematics of Operations Research, 27, 518-544.
-
(2002)
Mathematics of Operations Research
, vol.27
, pp. 518-544
-
-
Amotz, B.N.1
Bhatia, R.2
Naor, J.3
Schieber, B.4
-
26
-
-
0001807517
-
The scheduling of maintenance service
-
Anily, S., Glass, C.A. and Hassin, R., 1998, The scheduling of maintenance service. Discrete Applied Mathematics, 82, 27-42.
-
(1998)
Discrete Applied Mathematics
, vol.82
, pp. 27-42
-
-
Anily, S.1
Glass, C.A.2
Hassin, R.3
-
27
-
-
0033421927
-
Scheduling of maintenance services to three machines
-
Anily, S., Glass, C.A. and Hassin, R., 1999, Scheduling of maintenance services to three machines. Annals of Operations Research, 86, 375-391.
-
(1999)
Annals of Operations Research
, vol.86
, pp. 375-391
-
-
Anily, S.1
Glass, C.A.2
Hassin, R.3
-
28
-
-
0030259760
-
Optimal control of a production system with periodic maintenance
-
Krämer, F.J. and Bai, S.X., 1996, Optimal control of a production system with periodic maintenance. Optimal Control Applications and Methods, 17, 281-307.
-
(1996)
Optimal Control Applications and Methods
, vol.17
, pp. 281-307
-
-
Krämer, F.J.1
Bai, S.X.2
-
29
-
-
0035341857
-
On the economic lot scheduling problem under power-of-two policy
-
Yao, M.J. and Elmaghraby, S.E., 2001, On the economic lot scheduling problem under power-of-two policy. Computers and Mathematics with Applications, 41, 1379-1393.
-
(2001)
Computers and Mathematics with Applications
, vol.41
, pp. 1379-1393
-
-
Yao, M.J.1
Elmaghraby, S.E.2
-
30
-
-
0017931081
-
The economic lot scheduling problem (ELSP): Review and extension
-
Elmaghraby, S.E., 1978, The economic lot scheduling problem (ELSP): review and extension. Management Science, 24, 587-597.
-
(1978)
Management Science
, vol.24
, pp. 587-597
-
-
Elmaghraby, S.E.1
|