메뉴 건너뛰기




Volumn 17, Issue 4, 1996, Pages 281-307

Optimal control of a production system with periodic maintenance

Author keywords

Optimal control; Periodic maintenance; Production flow model

Indexed keywords

MATHEMATICAL MODELS; OPTIMAL CONTROL SYSTEMS; PROBLEM SOLVING; SCHEDULING;

EID: 0030259760     PISSN: 01432087     EISSN: None     Source Type: Journal    
DOI: 10.1002/(SICI)1099-1514(199610/12)17:4<281::AID-OCA577>3.0.CO;2-8     Document Type: Article
Times cited : (9)

References (15)
  • 2
    • 0020915621 scopus 로고
    • An algorithm for the computer control of a flexible manufacturing system
    • Kimemia, J. and S. B. Gershwin, 'An algorithm for the computer control of a flexible manufacturing system', IIE Trans., 15, 353-362 (1983).
    • (1983) IIE Trans. , vol.15 , pp. 353-362
    • Kimemia, J.1    Gershwin, S.B.2
  • 3
    • 0022094177 scopus 로고
    • Short-term production scheduling of an automated manufacturing facility
    • Gershwin, S. B., R. A. Akella and Y. Choong, 'Short-term production scheduling of an automated manufacturing facility', IBM J. Res. Develop., 29, 392-400 (1985).
    • (1985) IBM J. Res. Develop. , vol.29 , pp. 392-400
    • Gershwin, S.B.1    Akella, R.A.2    Choong, Y.3
  • 5
    • 0029392253 scopus 로고
    • Scheduling manufacturing systems with work-in-process inventory control: Single-part-type systems
    • Bai, S. X. and S. B. Gershwin, 'Scheduling manufacturing systems with work-in-process inventory control: single-part-type systems', IIE Trans., 27, 599-617 (1995).
    • (1995) IIE Trans. , vol.27 , pp. 599-617
    • Bai, S.X.1    Gershwin, S.B.2
  • 6
    • 0028374441 scopus 로고
    • Scheduling manufacturing systems with work-in-process inventory control: Multiple-part-systems
    • Bai, S. X. and S. B. Gershwin, 'Scheduling manufacturing systems with work-in-process inventory control: multiple-part-systems', Int. J. Prod. Res., 32, 365-385 (1994).
    • (1994) Int. J. Prod. Res. , vol.32 , pp. 365-385
    • Bai, S.X.1    Gershwin, S.B.2
  • 7
    • 0000025394 scopus 로고    scopus 로고
    • Scheduling manufacturing systems with work-in-process inventory control: Reentrant systems
    • in press
    • Bai, S. X. and S. B. Gershwin, 'Scheduling manufacturing systems with work-in-process inventory control: reentrant systems', OR Spektrum, in press (1996).
    • (1996) OR Spektrum
    • Bai, S.X.1    Gershwin, S.B.2
  • 9
    • 0025567898 scopus 로고
    • Selection of setup times in a hierarchically controlled manufacturing system
    • Honolulu, HI, 1990, IEEE, New York
    • Srinivatsan, N. and S. B. Gershwin, 'Selection of setup times in a hierarchically controlled manufacturing system', Proc. 29th IEEE Conf. on Decision and Control, Honolulu, HI, 1990, IEEE, New York, 1990.
    • (1990) Proc. 29th IEEE Conf. on Decision and Control
    • Srinivatsan, N.1    Gershwin, S.B.2
  • 10
    • 0022667867 scopus 로고
    • Optimal control of production rate in a failure prone manufacturing system
    • Akella, R. A. and P. R. Kumar, 'Optimal control of production rate in a failure prone manufacturing system,' IEEE Trans. Automatic Control, AC-31, 116-126 (1986).
    • (1986) IEEE Trans. Automatic Control , vol.AC-31 , pp. 116-126
    • Akella, R.A.1    Kumar, P.R.2
  • 11
    • 0027558877 scopus 로고
    • Optimal production control for failure prone manufacturing systems with deterministic machine up times
    • Hu, J.-Q. and D. Xiang, 'Optimal production control for failure prone manufacturing systems with deterministic machine up times', IEEE Trans. Automatic Control, AC-36, 499-502 (1993).
    • (1993) IEEE Trans. Automatic Control , vol.AC-36 , pp. 499-502
    • Hu, J.-Q.1    Xiang, D.2
  • 14
    • 0011446744 scopus 로고
    • Res. Rep. 94-12, Department of Industrial and Systems Engineering, University of Florida, Gainesville, FL
    • Krämer, F. J. and S. X. Bai, 'A production flow control problem with periodic maintenance', Res. Rep. 94-12, Department of Industrial and Systems Engineering, University of Florida, Gainesville, FL, 1994.
    • (1994) A Production Flow Control Problem with Periodic Maintenance
    • Krämer, F.J.1    Bai, S.X.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.