-
1
-
-
0003988826
-
-
Rep. BS-R8909, Centre for Mathematics and Computer Science
-
Lawler, E. L., J. K. Lenstra, A. H. G. Rinnooy Kan and D. B. Shmoys, 'Sequencing and scheduling: algorithms and complexity', Rep. BS-R8909, Centre for Mathematics and Computer Science, 1989.
-
(1989)
Sequencing and Scheduling: Algorithms and Complexity
-
-
Lawler, E.L.1
Lenstra, J.K.2
Rinnooy Kan, A.H.G.3
Shmoys, D.B.4
-
2
-
-
0020915621
-
An algorithm for the computer control of a flexible manufacturing system
-
Kimemia, J. and S. B. Gershwin, 'An algorithm for the computer control of a flexible manufacturing system', IIE Trans., 15, 353-362 (1983).
-
(1983)
IIE Trans.
, vol.15
, pp. 353-362
-
-
Kimemia, J.1
Gershwin, S.B.2
-
3
-
-
0022094177
-
Short-term production scheduling of an automated manufacturing facility
-
Gershwin, S. B., R. A. Akella and Y. Choong, 'Short-term production scheduling of an automated manufacturing facility', IBM J. Res. Develop., 29, 392-400 (1985).
-
(1985)
IBM J. Res. Develop.
, vol.29
, pp. 392-400
-
-
Gershwin, S.B.1
Akella, R.A.2
Choong, Y.3
-
4
-
-
0021484063
-
Performance of hierarchical production scheduling policy
-
Akella, R. A., Y. Choong and S. B. Gershwin, 'Performance of hierarchical production scheduling policy', IEEE Trans. Compon. Hybrids, Manuf. Technol., CHMT-7, pp. 225-240 (1984).
-
(1984)
IEEE Trans. Compon. Hybrids, Manuf. Technol.
, vol.CHMT-7
, pp. 225-240
-
-
Akella, R.A.1
Choong, Y.2
Gershwin, S.B.3
-
5
-
-
0029392253
-
Scheduling manufacturing systems with work-in-process inventory control: Single-part-type systems
-
Bai, S. X. and S. B. Gershwin, 'Scheduling manufacturing systems with work-in-process inventory control: single-part-type systems', IIE Trans., 27, 599-617 (1995).
-
(1995)
IIE Trans.
, vol.27
, pp. 599-617
-
-
Bai, S.X.1
Gershwin, S.B.2
-
6
-
-
0028374441
-
Scheduling manufacturing systems with work-in-process inventory control: Multiple-part-systems
-
Bai, S. X. and S. B. Gershwin, 'Scheduling manufacturing systems with work-in-process inventory control: multiple-part-systems', Int. J. Prod. Res., 32, 365-385 (1994).
-
(1994)
Int. J. Prod. Res.
, vol.32
, pp. 365-385
-
-
Bai, S.X.1
Gershwin, S.B.2
-
7
-
-
0000025394
-
Scheduling manufacturing systems with work-in-process inventory control: Reentrant systems
-
in press
-
Bai, S. X. and S. B. Gershwin, 'Scheduling manufacturing systems with work-in-process inventory control: reentrant systems', OR Spektrum, in press (1996).
-
(1996)
OR Spektrum
-
-
Bai, S.X.1
Gershwin, S.B.2
-
8
-
-
0000489163
-
Dynamic setup scheduling and flow control in manufacturing systems
-
Sharifnia, A., M. Caramanis and S. B. Gershwin, 'Dynamic setup scheduling and flow control in manufacturing systems', Discrete Event Dyn. Syst.: Theory Appl., 1, 149-175 (1991).
-
(1991)
Discrete Event Dyn. Syst.: Theory Appl.
, vol.1
, pp. 149-175
-
-
Sharifnia, A.1
Caramanis, M.2
Gershwin, S.B.3
-
9
-
-
0025567898
-
Selection of setup times in a hierarchically controlled manufacturing system
-
Honolulu, HI, 1990, IEEE, New York
-
Srinivatsan, N. and S. B. Gershwin, 'Selection of setup times in a hierarchically controlled manufacturing system', Proc. 29th IEEE Conf. on Decision and Control, Honolulu, HI, 1990, IEEE, New York, 1990.
-
(1990)
Proc. 29th IEEE Conf. on Decision and Control
-
-
Srinivatsan, N.1
Gershwin, S.B.2
-
10
-
-
0022667867
-
Optimal control of production rate in a failure prone manufacturing system
-
Akella, R. A. and P. R. Kumar, 'Optimal control of production rate in a failure prone manufacturing system,' IEEE Trans. Automatic Control, AC-31, 116-126 (1986).
-
(1986)
IEEE Trans. Automatic Control
, vol.AC-31
, pp. 116-126
-
-
Akella, R.A.1
Kumar, P.R.2
-
11
-
-
0027558877
-
Optimal production control for failure prone manufacturing systems with deterministic machine up times
-
Hu, J.-Q. and D. Xiang, 'Optimal production control for failure prone manufacturing systems with deterministic machine up times', IEEE Trans. Automatic Control, AC-36, 499-502 (1993).
-
(1993)
IEEE Trans. Automatic Control
, vol.AC-36
, pp. 499-502
-
-
Hu, J.-Q.1
Xiang, D.2
-
12
-
-
0347743930
-
-
Gordon and Breach, New York
-
Pontryagin, L. S., V. G. Boltyanskii, R. V. Gamkrelidze and E. F. Mishchenko, L. S. Pontryagin Selected Works, Vol. 4, The Mathematical Theory of Optimal Processes, Gordon and Breach, New York, 1962.
-
(1962)
L. S. Pontryagin Selected Works, Vol. 4, the Mathematical Theory of Optimal Processes
, vol.4
-
-
Pontryagin, L.S.1
Boltyanskii, V.G.2
Gamkrelidze, R.V.3
Mishchenko, E.F.4
-
13
-
-
0003448648
-
-
Prentice-Hall, Englewood Cliffs, NJ
-
Kirk, D. E. Optimal Control Theory, An Introduction, Prentice-Hall, Englewood Cliffs, NJ, 1970.
-
(1970)
Optimal Control Theory, An Introduction
-
-
Kirk, D.E.1
-
14
-
-
0011446744
-
-
Res. Rep. 94-12, Department of Industrial and Systems Engineering, University of Florida, Gainesville, FL
-
Krämer, F. J. and S. X. Bai, 'A production flow control problem with periodic maintenance', Res. Rep. 94-12, Department of Industrial and Systems Engineering, University of Florida, Gainesville, FL, 1994.
-
(1994)
A Production Flow Control Problem with Periodic Maintenance
-
-
Krämer, F.J.1
Bai, S.X.2
-
15
-
-
85033866164
-
-
Ph.D. Dissertation, University of Florida, Gainesville, FL
-
Krämer, F. J. 'Essays in production scheduling with work-in-process related performance measures', Ph.D. Dissertation, University of Florida, Gainesville, FL, 1994.
-
(1994)
Essays in Production Scheduling with Work-in-process Related Performance Measures
-
-
Krämer, F.J.1
|