-
1
-
-
0033881924
-
An exact method for cost-oriented assembly line balancing
-
Amen, M., An exact method for cost-oriented assembly line balancing. Int. J. Prod. Econ., 2000, 64, 187-195.
-
(2000)
Int. J. Prod. Econ.
, vol.64
, pp. 187-195
-
-
Amen, M.1
-
2
-
-
0031621768
-
A survey of factory control algorithms that can be implemented in a multi-agent heterarchy: Dispatching, scheduling, and pull
-
Baker, A.D., A survey of factory control algorithms that can be implemented in a multi-agent heterarchy: Dispatching, scheduling, and pull. J. Manuf. Syst., 1998, 17, 297-320.
-
(1998)
J. Manuf. Syst.
, vol.17
, pp. 297-320
-
-
Baker, A.D.1
-
3
-
-
30844442904
-
A survey on problems and methods in generalized assembly line balancing
-
FSU Jena
-
Becker, C. and Scholl, A., A survey on problems and methods in generalized assembly line balancing. Jenaer Schriften zur Wirtschaftswissenschaft 21/03, FSU Jena, 2003 (http://www.wiwi.uni-jena.de/Entscheidung/alb/GALBP-Survey.pdf).
-
(2003)
Jenaer Schriften zur Wirtschaftswissenschaft 21/03
-
-
Becker, C.1
Scholl, A.2
-
4
-
-
0029723070
-
Survey of algorithms for static load balancing
-
Bilsen, G., Engels, M., Lauwereins, R. and Peperstraete, J.A., Survey of algorithms for static load balancing. Int. J. Mini Microcomput., 1996, 18, 92-99.
-
(1996)
Int. J. Mini Microcomput.
, vol.18
, pp. 92-99
-
-
Bilsen, G.1
Engels, M.2
Lauwereins, R.3
Peperstraete, J.A.4
-
5
-
-
0035451881
-
Two-machine open shop scheduling with an availability constraint
-
Breit, J., Schmidt, G. and Strusevich, V.A., Two-machine open shop scheduling with an availability constraint. Oper. Res. Letters, 2001, 29, 65-77.
-
(2001)
Oper. Res. Letters
, vol.29
, pp. 65-77
-
-
Breit, J.1
Schmidt, G.2
Strusevich, V.A.3
-
6
-
-
0032186585
-
An improvement of the Lagrangean relaxation approach for job shop scheduling: A dynamic programming method
-
Chen, H., Chu, C. and Proth, J., An improvement of the Lagrangean relaxation approach for job shop scheduling: A dynamic programming method. IEEE Trans. Robot. Autom., 1998, 14, 786-795.
-
(1998)
IEEE Trans. Robot. Autom.
, vol.14
, pp. 786-795
-
-
Chen, H.1
Chu, C.2
Proth, J.3
-
7
-
-
0020504370
-
Negotiation as a metaphor for distributed problem solving
-
Davis, R. and Smith, R. G., Negotiation as a metaphor for distributed problem solving. Artif. Intell., 1983, 20, 63-109.
-
(1983)
Artif. Intell.
, vol.20
, pp. 63-109
-
-
Davis, R.1
Smith, R.G.2
-
9
-
-
0037410521
-
Algorithms for the variable sized bin packing problem
-
Kang, J. and Park, S., Algorithms for the variable sized bin packing problem, Euro. J. Oper. Res., 2000, 147, 365-372.
-
(2000)
Euro. J. Oper. Res.
, vol.147
, pp. 365-372
-
-
Kang, J.1
Park, S.2
-
11
-
-
30844455237
-
Complexity analysis of multi-factor manufacturing scheduling problems, 2003
-
Accepted for the, October 25-28
-
Li, Y. and Shen, W., Complexity analysis of multi-factor manufacturing scheduling problems, 2003. Accepted for the SPIE Conference on Intelligent Systems in Design and Manufacturing V, October 25-28, 2004.
-
(2004)
SPIE Conference on Intelligent Systems in Design and Manufacturing v
-
-
Li, Y.1
Shen, W.2
-
12
-
-
0003438602
-
-
Prentice Hall: Upper Saddle River, New Jersey
-
Pinedo, M., Scheduling Theory, Algorithms, and Systems, 2nd edn, 2002 (Prentice Hall: Upper Saddle River, New Jersey).
-
(2002)
Scheduling Theory, Algorithms, and Systems, 2nd Edn
-
-
Pinedo, M.1
-
13
-
-
0036467861
-
Algorithm for optimal winner determination in combinatorial auctions
-
Sandholm, T., Algorithm for optimal winner determination in combinatorial auctions. Artif. Intel., 2002, 135, 1-54.
-
(2002)
Artif. Intel.
, vol.135
, pp. 1-54
-
-
Sandholm, T.1
-
14
-
-
0036200385
-
Distributed manufacturing scheduling using intelligent agents
-
Shen, W., Distributed manufacturing scheduling using intelligent agents. IEEE Intel. Syst., 2002, 17, 88-94.
-
(2002)
IEEE Intel. Syst.
, vol.17
, pp. 88-94
-
-
Shen, W.1
-
15
-
-
0242665904
-
Adaptive negotiation for agent-based grid computing
-
Bologna, Italy
-
Shen, W., Li, Y., Ghenniwa, H. and Wang, C., Adaptive negotiation for agent-based grid computing. Proceedings of AAMAS2002 Workshop on Agentcities: Challenges in Open Agent Environments, pp. 32-36, 2002 (Bologna, Italy).
-
(2002)
Proceedings of AAMAS2002 Workshop on Agentcities: Challenges in Open Agent Environments
, pp. 32-36
-
-
Shen, W.1
Li, Y.2
Ghenniwa, H.3
Wang, C.4
-
16
-
-
0027695322
-
Deterministic scheduling in computing and manufacturing system: A survey of models and algorithms
-
Tzafestas, S., and Triantafyllakis, A., Deterministic scheduling in computing and manufacturing system: A survey of models and algorithms. Maths. Comput. Simul., 1993, 35, 397-434.
-
(1993)
Maths. Comput. Simul.
, vol.35
, pp. 397-434
-
-
Tzafestas, S.1
Triantafyllakis, A.2
-
17
-
-
0036833157
-
Scheduling of unrelated parallel machines: An application to PWB manufacturing
-
Yu, L., Shih, H.M., Pfund, M., Carlyle, W.M. and Powler, J.W., Scheduling of unrelated parallel machines: An application to PWB manufacturing. IIE Trans., 2002, 34, 921-931.
-
(2002)
IIE Trans.
, vol.34
, pp. 921-931
-
-
Yu, L.1
Shih, H.M.2
Pfund, M.3
Carlyle, W.M.4
Powler, J.W.5
|