1
-
-
0003947419
-
-
Kluwer Academic Publishers, Hingham, MA, U.S.A.
-
Ham, I., Hitomi, K., Yoshida, T., 1985, Group Technology: Applications to Production Management, Kluwer Academic Publishers, Hingham, MA, U.S.A.
-
(1985)
Group Technology: Applications to Production Management
-
-
Ham, I.1
Hitomi, K.2
Yoshida, T.3
-
2
-
-
0022989040
-
A heuristic algorithm for group scheduling
-
Dallas, TX
-
Radharamanan, R., 1986, "A Heuristic Algorithm for Group Scheduling," Proc. of the International Industrial Engineering Conference, Dallas, TX, 229-236.
-
(1986)
Proc. of the International Industrial Engineering Conference
, pp. 229-236
-
-
Radharamanan, R.1
-
3
-
-
0013419890
-
Designing GT cells enhanced by group scheduling: Key to flexible manufacturing system
-
St. Louis, MO
-
Al-Qattan, I., 1988, "Designing GT Cells Enhanced by Group Scheduling: Key to Flexible Manufacturing System," Proc. of the IIE Integrated Systems Conference, St. Louis, MO, 25-30.
-
(1988)
Proc. of the IIE Integrated Systems Conference
, pp. 25-30
-
-
Al-Qattan, I.1
-
5
-
-
0026386081
-
Minimizing the makespan of a group scheduling problem: A new heuristic
-
Logendran, R., Nudtasomboon, N., 1991, "Minimizing the Makespan of a Group Scheduling Problem: A New Heuristic," International Journal of Production Economics, 22, 217-230.
-
(1991)
International Journal of Production Economics
, vol.22
, pp. 217-230
-
-
Logendran, R.1
Nudtasomboon, N.2
-
6
-
-
0013371595
-
Combined heuristics for bi-level group scheduling problems
-
Logendran, R., Mai, L., Talkington, D., 1995, "Combined Heuristics for Bi-Level Group Scheduling Problems," International Journal of Production Economics, 38(2-3), 133-145.
-
(1995)
International Journal of Production Economics
, vol.38
, Issue.2-3
, pp. 133-145
-
-
Logendran, R.1
Mai, L.2
Talkington, D.3
-
7
-
-
0031621164
-
Group scheduling with sequence dependent setups
-
San Diego, CA
-
Schaller, J.E., Gupta, J.N.D., Vakharia, A.J., 1997, "Group Scheduling with Sequence Dependent Setups," Proc. Of the Annual Decision Sciences Institute Meeting, San Diego, CA, 1141-1143.
-
(1997)
Proc. of the Annual Decision Sciences Institute Meeting
, pp. 1141-1143
-
-
Schaller, J.E.1
Gupta, J.N.D.2
Vakharia, A.J.3
-
8
-
-
84867921442
-
Production planning problems in printed circuit board assembly
-
Crama, Y., van de Klundert, J., Spieksma, F.C.R., 2002, "Production Planning Problems in Printed Circuit Board Assembly," Discrete Applied Mathematics, 123, 339-361.
-
(2002)
Discrete Applied Mathematics
, vol.123
, pp. 339-361
-
-
Crama, Y.1
Van De Klundert, J.2
Spieksma, F.C.R.3
-
9
-
-
0037329238
-
Minimizing the mean flow time in a two-machine group-scheduling problem with carryover sequence dependency
-
Logendran, R., Gelogullari, C.A., Sriskandarajah, C., 2003, "Minimizing the Mean Flow Time in a Two-Machine Group-Scheduling Problem with Carryover Sequence Dependency," Journal of Robotics and Computer-Integrated Manufacturing, 19(1-2), 21-33.
-
(2003)
Journal of Robotics and Computer-Integrated Manufacturing
, vol.19
, Issue.1-2
, pp. 21-33
-
-
Logendran, R.1
Gelogullari, C.A.2
Sriskandarajah, C.3
-
10
-
-
30044437155
-
Minimizing the mean flow time in a two-machine group scheduling problem with carryover sequence dependency via mathematical programming
-
May 17-21, Portland, OR
-
Gelogullari, C.A., Logendran, R., 2003, "Minimizing the Mean Flow Time in a Two-Machine Group Scheduling Problem with Carryover Sequence Dependency via Mathematical Programming," Proc. of the IIE 2003 Annual Conference (CD-ROM), May 17-21, Portland, OR.
-
(2003)
Proc. of the IIE 2003 Annual Conference (CD-ROM)
-
-
Gelogullari, C.A.1
Logendran, R.2
-
12
-
-
30044448605
-
-
Paris, France
-
Ilog Inc., ILOG CPLEX 8.1, Paris, France, 2001.
-
(2001)
ILOG CPLEX 8.1
-
-
|