메뉴 건너뛰기




Volumn 19, Issue 1-2, 2003, Pages 21-33

Minimizing the mean flow time in a two-machine group-scheduling problem with carryover sequence dependency

Author keywords

Carryover sequence dependency; Electronics manufacturing; Group scheduling; Lower bound; Tabu search

Indexed keywords

ALGORITHMS; PRINTED CIRCUIT MANUFACTURE; PRODUCTION CONTROL; SCHEDULING; TREES (MATHEMATICS);

EID: 0037329238     PISSN: 07365845     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0736-5845(02)00059-5     Document Type: Conference Paper
Times cited : (15)

References (28)
  • 1
    • 0018520161 scopus 로고
    • Optimal two-stage production scheduling with setup times separated
    • Yoshida T., Hitomi K. Optimal two-stage production scheduling with setup times separated. AIIE Trans. 11:1979;261-263.
    • (1979) AIIE Trans , vol.11 , pp. 261-263
    • Yoshida, T.1    Hitomi, K.2
  • 2
    • 0020177876 scopus 로고
    • Sequencing n jobs on two machines with setup, processing and removal times separated
    • Sule D.R. Sequencing n jobs on two machines with setup, processing and removal times separated. Nav Res Logistics Q. 29:1982;517-519.
    • (1982) Nav Res Logistics Q , vol.29 , pp. 517-519
    • Sule, D.R.1
  • 4
    • 0013419890 scopus 로고
    • Designing GT cells enhanced by group scheduling: Key to flexible manufacturing system
    • St. Louis, Missouri
    • Al-Qattan I. Designing GT cells enhanced by group scheduling: key to flexible manufacturing system. Proceedings of the IIE Integrated Systems Conference, 1988. St. Louis, Missouri. p. 25-30.
    • (1988) Proceedings of the IIE Integrated Systems Conference , pp. 25-30
    • Al-Qattan, I.1
  • 6
    • 0026117836 scopus 로고
    • Flowshop scheduling with set-up, processing and removal time separated
    • Proust C., Gupta J.N.D., Deschamps V. Flowshop scheduling with set-up, processing and removal time separated. Int J Prod Res. 29:1991;479-493.
    • (1991) Int J Prod Res , vol.29 , pp. 479-493
    • Proust, C.1    Gupta, J.N.D.2    Deschamps, V.3
  • 7
    • 0026386081 scopus 로고
    • Minimizing the makespan of a group scheduling problem: A new heuristic
    • Logendran R., Nudtasomboon N. Minimizing the makespan of a group scheduling problem. a new heuristic Int J Prod Econom. 22:1991;217-230.
    • (1991) Int J Prod Econom , vol.22 , pp. 217-230
    • Logendran, R.1    Nudtasomboon, N.2
  • 8
    • 0013371595 scopus 로고
    • Combined heuristics for bi-level group scheduling problems
    • Logendran R., Mai L., Talkington D. Combined heuristics for bi-level group scheduling problems. Int J Prod Econom. 38(2-3):1995;133-145.
    • (1995) Int J Prod Econom , vol.38 , Issue.2-3 , pp. 133-145
    • Logendran, R.1    Mai, L.2    Talkington, D.3
  • 10
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry part I: System characteristics, performance evaluation and production planning
    • Uzsoy R., Lee C-.Y., Martin-Vega L.A. A review of production planning and scheduling models in the semiconductor industry part I. system characteristics, performance evaluation and production planning IIE Trans. 26(5):1992;47-61.
    • (1992) IIE Trans , vol.26 , Issue.5 , pp. 47-61
    • Uzsoy, R.1    Lee, C.-Y.2    Martin-Vega, L.A.3
  • 11
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry part II: Shop-floor control
    • Uzsoy R., Lee C-.Y., Martin-Vega L.A. A review of production planning and scheduling models in the semiconductor industry part II. shop-floor control IIE Trans. 26(5):1994;44-55.
    • (1994) IIE Trans , vol.26 , Issue.5 , pp. 44-55
    • Uzsoy, R.1    Lee, C.-Y.2    Martin-Vega, L.A.3
  • 13
    • 0023983796 scopus 로고
    • Component allocation and partitioning for a dual delivery placement machine
    • Ahmadi J., Grotzinger S., Johnson D. Component allocation and partitioning for a dual delivery placement machine. Oper Res. 36:1988;176-191.
    • (1988) Oper Res , vol.36 , pp. 176-191
    • Ahmadi, J.1    Grotzinger, S.2    Johnson, D.3
  • 14
    • 0027927407 scopus 로고
    • Staging problem of a dual delivery pick-and-place machine in printed circuit card assembly
    • Ahmadi R.H., Kouvelis P. Staging problem of a dual delivery pick-and-place machine in printed circuit card assembly. Oper Res. 42(1):1994;81-91.
    • (1994) Oper Res , vol.42 , Issue.1 , pp. 81-91
    • Ahmadi, R.H.1    Kouvelis, P.2
  • 15
    • 0025460538 scopus 로고
    • 1990, Part assignment to electronic insertion machines: Two machine case
    • Ben-Arieh D., Dror M. 1990, Part assignment to electronic insertion machines. two machine case Int J Prod Res. 28(7):1990;1317-1327.
    • (1990) Int J Prod Res , vol.28 , Issue.7 , pp. 1317-1327
    • Ben-Arieh, D.1    Dror, M.2
  • 16
    • 0003040783 scopus 로고
    • Design of manufacturing cells: Operations assignment in oriented circuit board manufacturing
    • Brandeau M.L., Billington C.A. Design of manufacturing cells. operations assignment in oriented circuit board manufacturing J Intell Manuf. 2:1991;95-106.
    • (1991) J Intell Manuf , vol.2 , pp. 95-106
    • Brandeau, M.L.1    Billington, C.A.2
  • 17
    • 0032156048 scopus 로고    scopus 로고
    • Optimal component assignment and board grouping in printed circuit board manufacturing
    • Hillier M.S., Brandeau M.L. Optimal component assignment and board grouping in printed circuit board manufacturing. Oper Res. 46(5):1998;675-689.
    • (1998) Oper Res , vol.46 , Issue.5 , pp. 675-689
    • Hillier, M.S.1    Brandeau, M.L.2
  • 19
    • 0031627962 scopus 로고    scopus 로고
    • A comparison of setup strategies for printed circuit board assembly
    • Leon V.J., Peters B.A. A comparison of setup strategies for printed circuit board assembly. Comput Ind Eng. 34(1):1998;219-234.
    • (1998) Comput Ind Eng , vol.34 , Issue.1 , pp. 219-234
    • Leon, V.J.1    Peters, B.A.2
  • 20
    • 0024070715 scopus 로고
    • Models arising from a flexible manufacturing machine, part I: Minimization of the number of tool switches
    • Tang C.S., Denardo E.V. Models arising from a flexible manufacturing machine, part I. minimization of the number of tool switches Oper Res. 36(5):1988;767-777.
    • (1988) Oper Res , vol.36 , Issue.5 , pp. 767-777
    • Tang, C.S.1    Denardo, E.V.2
  • 21
    • 0016952078 scopus 로고
    • The complexity of flowshop and jobshop scheduling
    • Garey M.R., Johnson D.S., Sethi R.R. The complexity of flowshop and jobshop scheduling. Math Oper Res. 1:1976;117-129.
    • (1976) Math Oper Res , vol.1 , pp. 117-129
    • Garey, M.R.1    Johnson, D.S.2    Sethi, R.R.3
  • 23
    • 0002703574 scopus 로고
    • Tabu-search: A tutorial
    • Glover F. Tabu-search. a tutorial Interfaces. 20:1990;79-94.
    • (1990) Interfaces , vol.20 , pp. 79-94
    • Glover, F.1
  • 24
    • 0031103522 scopus 로고    scopus 로고
    • Tabu search-based approach for scheduling job-shop type flexible manufacturing systems
    • Logendran R., Sonthinen A. Tabu search-based approach for scheduling job-shop type flexible manufacturing systems. J Oper Res Soc. 48:1997;264-277.
    • (1997) J Oper Res Soc , vol.48 , pp. 264-277
    • Logendran, R.1    Sonthinen, A.2
  • 26
    • 0003075019 scopus 로고
    • Optimal two- and three-stage production schedules with set-up times included
    • Johnson S.M. Optimal two- and three-stage production schedules with set-up times included. Nav Res Logistics Q. 1:1954;61-68.
    • (1954) Nav Res Logistics Q , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 28
    • 0013419891 scopus 로고    scopus 로고
    • MathSoft Inc.S-Plus, Data Analysis Products Division, Seattle, Washington, USA, 1997.
    • MathSoft Inc.S-Plus, Data Analysis Products Division, Seattle, Washington, USA, 1997.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.