-
1
-
-
0018520161
-
Optimal two-stage production scheduling with setup times separated
-
Yoshida T., Hitomi K. Optimal two-stage production scheduling with setup times separated. AIIE Trans. 11:1979;261-263.
-
(1979)
AIIE Trans
, vol.11
, pp. 261-263
-
-
Yoshida, T.1
Hitomi, K.2
-
2
-
-
0020177876
-
Sequencing n jobs on two machines with setup, processing and removal times separated
-
Sule D.R. Sequencing n jobs on two machines with setup, processing and removal times separated. Nav Res Logistics Q. 29:1982;517-519.
-
(1982)
Nav Res Logistics Q
, vol.29
, pp. 517-519
-
-
Sule, D.R.1
-
4
-
-
0013419890
-
Designing GT cells enhanced by group scheduling: Key to flexible manufacturing system
-
St. Louis, Missouri
-
Al-Qattan I. Designing GT cells enhanced by group scheduling: key to flexible manufacturing system. Proceedings of the IIE Integrated Systems Conference, 1988. St. Louis, Missouri. p. 25-30.
-
(1988)
Proceedings of the IIE Integrated Systems Conference
, pp. 25-30
-
-
Al-Qattan, I.1
-
6
-
-
0026117836
-
Flowshop scheduling with set-up, processing and removal time separated
-
Proust C., Gupta J.N.D., Deschamps V. Flowshop scheduling with set-up, processing and removal time separated. Int J Prod Res. 29:1991;479-493.
-
(1991)
Int J Prod Res
, vol.29
, pp. 479-493
-
-
Proust, C.1
Gupta, J.N.D.2
Deschamps, V.3
-
7
-
-
0026386081
-
Minimizing the makespan of a group scheduling problem: A new heuristic
-
Logendran R., Nudtasomboon N. Minimizing the makespan of a group scheduling problem. a new heuristic Int J Prod Econom. 22:1991;217-230.
-
(1991)
Int J Prod Econom
, vol.22
, pp. 217-230
-
-
Logendran, R.1
Nudtasomboon, N.2
-
8
-
-
0013371595
-
Combined heuristics for bi-level group scheduling problems
-
Logendran R., Mai L., Talkington D. Combined heuristics for bi-level group scheduling problems. Int J Prod Econom. 38(2-3):1995;133-145.
-
(1995)
Int J Prod Econom
, vol.38
, Issue.2-3
, pp. 133-145
-
-
Logendran, R.1
Mai, L.2
Talkington, D.3
-
9
-
-
84941457782
-
Automated process planning for printed circuit card assembly
-
McGinnis L.F., Ammons J.C., Carlyle M., Cranmer L., Depuy G.W., Ellis K.P., Tovey C.A., Xu H. Automated process planning for printed circuit card assembly. IIE Trans. 24(4):1992;18-30.
-
(1992)
IIE Trans
, vol.24
, Issue.4
, pp. 18-30
-
-
McGinnis, L.F.1
Ammons, J.C.2
Carlyle, M.3
Cranmer, L.4
Depuy, G.W.5
Ellis, K.P.6
Tovey, C.A.7
Xu, H.8
-
10
-
-
84952240555
-
A review of production planning and scheduling models in the semiconductor industry part I: System characteristics, performance evaluation and production planning
-
Uzsoy R., Lee C-.Y., Martin-Vega L.A. A review of production planning and scheduling models in the semiconductor industry part I. system characteristics, performance evaluation and production planning IIE Trans. 26(5):1992;47-61.
-
(1992)
IIE Trans
, vol.26
, Issue.5
, pp. 47-61
-
-
Uzsoy, R.1
Lee, C.-Y.2
Martin-Vega, L.A.3
-
11
-
-
0028496979
-
A review of production planning and scheduling models in the semiconductor industry part II: Shop-floor control
-
Uzsoy R., Lee C-.Y., Martin-Vega L.A. A review of production planning and scheduling models in the semiconductor industry part II. shop-floor control IIE Trans. 26(5):1994;44-55.
-
(1994)
IIE Trans
, vol.26
, Issue.5
, pp. 44-55
-
-
Uzsoy, R.1
Lee, C.-Y.2
Martin-Vega, L.A.3
-
12
-
-
0031120308
-
Component allocation to balance workload in printed circuit card assembly systems
-
Ammons J.C., Carlyle M., Cranmer L., Depuy G.W., Ellis K.P., McGinnis L.F., Tovey C.A., Xu H. Component allocation to balance workload in printed circuit card assembly systems. IIE Trans. 29(4):1997;265-276.
-
(1997)
IIE Trans
, vol.29
, Issue.4
, pp. 265-276
-
-
Ammons, J.C.1
Carlyle, M.2
Cranmer, L.3
Depuy, G.W.4
Ellis, K.P.5
McGinnis, L.F.6
Tovey, C.A.7
Xu, H.8
-
13
-
-
0023983796
-
Component allocation and partitioning for a dual delivery placement machine
-
Ahmadi J., Grotzinger S., Johnson D. Component allocation and partitioning for a dual delivery placement machine. Oper Res. 36:1988;176-191.
-
(1988)
Oper Res
, vol.36
, pp. 176-191
-
-
Ahmadi, J.1
Grotzinger, S.2
Johnson, D.3
-
14
-
-
0027927407
-
Staging problem of a dual delivery pick-and-place machine in printed circuit card assembly
-
Ahmadi R.H., Kouvelis P. Staging problem of a dual delivery pick-and-place machine in printed circuit card assembly. Oper Res. 42(1):1994;81-91.
-
(1994)
Oper Res
, vol.42
, Issue.1
, pp. 81-91
-
-
Ahmadi, R.H.1
Kouvelis, P.2
-
15
-
-
0025460538
-
1990, Part assignment to electronic insertion machines: Two machine case
-
Ben-Arieh D., Dror M. 1990, Part assignment to electronic insertion machines. two machine case Int J Prod Res. 28(7):1990;1317-1327.
-
(1990)
Int J Prod Res
, vol.28
, Issue.7
, pp. 1317-1327
-
-
Ben-Arieh, D.1
Dror, M.2
-
16
-
-
0003040783
-
Design of manufacturing cells: Operations assignment in oriented circuit board manufacturing
-
Brandeau M.L., Billington C.A. Design of manufacturing cells. operations assignment in oriented circuit board manufacturing J Intell Manuf. 2:1991;95-106.
-
(1991)
J Intell Manuf
, vol.2
, pp. 95-106
-
-
Brandeau, M.L.1
Billington, C.A.2
-
17
-
-
0032156048
-
Optimal component assignment and board grouping in printed circuit board manufacturing
-
Hillier M.S., Brandeau M.L. Optimal component assignment and board grouping in printed circuit board manufacturing. Oper Res. 46(5):1998;675-689.
-
(1998)
Oper Res
, vol.46
, Issue.5
, pp. 675-689
-
-
Hillier, M.S.1
Brandeau, M.L.2
-
18
-
-
0022890910
-
Dynamic scheduling for flexible printed circuit card assembly
-
Atlanta, Georgia
-
Lofgren CB, McGinnis LF. Dynamic scheduling for flexible printed circuit card assembly. Proceedings of the IEEE Conference on Systems, Man, and Cybernetics, 1986. Atlanta, Georgia. p. 1294-7.
-
(1986)
Proceedings of the IEEE Conference on Systems, Man, and Cybernetics
, pp. 1294-1297
-
-
Lofgren, C.B.1
McGinnis, L.F.2
-
19
-
-
0031627962
-
A comparison of setup strategies for printed circuit board assembly
-
Leon V.J., Peters B.A. A comparison of setup strategies for printed circuit board assembly. Comput Ind Eng. 34(1):1998;219-234.
-
(1998)
Comput Ind Eng
, vol.34
, Issue.1
, pp. 219-234
-
-
Leon, V.J.1
Peters, B.A.2
-
20
-
-
0024070715
-
Models arising from a flexible manufacturing machine, part I: Minimization of the number of tool switches
-
Tang C.S., Denardo E.V. Models arising from a flexible manufacturing machine, part I. minimization of the number of tool switches Oper Res. 36(5):1988;767-777.
-
(1988)
Oper Res
, vol.36
, Issue.5
, pp. 767-777
-
-
Tang, C.S.1
Denardo, E.V.2
-
21
-
-
0016952078
-
The complexity of flowshop and jobshop scheduling
-
Garey M.R., Johnson D.S., Sethi R.R. The complexity of flowshop and jobshop scheduling. Math Oper Res. 1:1976;117-129.
-
(1976)
Math Oper Res
, vol.1
, pp. 117-129
-
-
Garey, M.R.1
Johnson, D.S.2
Sethi, R.R.3
-
23
-
-
0002703574
-
Tabu-search: A tutorial
-
Glover F. Tabu-search. a tutorial Interfaces. 20:1990;79-94.
-
(1990)
Interfaces
, vol.20
, pp. 79-94
-
-
Glover, F.1
-
24
-
-
0031103522
-
Tabu search-based approach for scheduling job-shop type flexible manufacturing systems
-
Logendran R., Sonthinen A. Tabu search-based approach for scheduling job-shop type flexible manufacturing systems. J Oper Res Soc. 48:1997;264-277.
-
(1997)
J Oper Res Soc
, vol.48
, pp. 264-277
-
-
Logendran, R.1
Sonthinen, A.2
-
26
-
-
0003075019
-
Optimal two- and three-stage production schedules with set-up times included
-
Johnson S.M. Optimal two- and three-stage production schedules with set-up times included. Nav Res Logistics Q. 1:1954;61-68.
-
(1954)
Nav Res Logistics Q
, vol.1
, pp. 61-68
-
-
Johnson, S.M.1
-
28
-
-
0013419891
-
-
MathSoft Inc.S-Plus, Data Analysis Products Division, Seattle, Washington, USA, 1997.
-
MathSoft Inc.S-Plus, Data Analysis Products Division, Seattle, Washington, USA, 1997.
-
-
-
|