메뉴 건너뛰기




Volumn 10, Issue 3, 2004, Pages 292-297

Agent-based hybrid control system for manufacturing cells

Author keywords

Agent; Architecture; Communication protocol; Control system; CORBA; Manufacturing cells

Indexed keywords

AGILE MANUFACTURING SYSTEMS; DECENTRALIZED CONTROL; FLEXIBLE MANUFACTURING SYSTEMS; HIERARCHICAL SYSTEMS; INTELLIGENT AGENTS; NETWORK PROTOCOLS;

EID: 2942676793     PISSN: 10065911     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (2)

References (15)
  • 3
    • 0000487015 scopus 로고
    • Principles of open-architecture manufacturing systems
    • WRIGHT P K. Principles of open-architecture manufacturing systems [J]. Journal of Manufacturing Systems, 1995, 14(2): 187-202.
    • (1995) Journal of Manufacturing Systems , vol.14 , Issue.2 , pp. 187-202
    • Wright, P.K.1
  • 4
    • 0242665905 scopus 로고
    • A proposed structure for distributed shop floor systems
    • CROWE T J, STAHLMAN E J. A proposed structure for distributed shop floor systems [J]. Int. Jour. of Production Research, 1995, 6(1): 31-36.
    • (1995) Int. Jour. of Production Research , vol.6 , Issue.1 , pp. 31-36
    • Crowe, T.J.1    Stahlman, E.J.2
  • 5
    • 0000759103 scopus 로고
    • Intelligence and cooperation in hierarchic manufacturing systems
    • HATVANY J. Intelligence and cooperation in hierarchic manufacturing systems [J]. Robotics and Computer-integrated Manufacturing, 1985, 2(2): 101-104.
    • (1985) Robotics and Computer-integrated Manufacturing , vol.2 , Issue.2 , pp. 101-104
    • Hatvany, J.1
  • 6
    • 0042779259 scopus 로고    scopus 로고
    • Research on CORBA-based object-oriented FMS control system
    • Shanghai: Shanghai Jiaotong Univ., Chinese source
    • ZHOU Binghai. Research on CORBA-based object-oriented FMS control system [D]. Shanghai: Shanghai Jiaotong Univ., 2001 (in Chinese).
    • (2001)
    • Zhou, B.1
  • 7
    • 0031069104 scopus 로고    scopus 로고
    • Using multi-agent architecture in FMS for dynamic scheduling
    • KOUISS K. Using multi-agent architecture in FMS for dynamic scheduling [J]. Journal of Intelligent Manufacturing, 1997, 8: 45-47.
    • (1997) Journal of Intelligent Manufacturing , vol.8 , pp. 45-47
    • Kouiss, K.1
  • 8
    • 2942651520 scopus 로고    scopus 로고
    • Agent-based distributed dynamic scheduling for job shop
    • Chinese source
    • QIAO Bing, SUN Zhijun, ZHU Jianying. Agent-based distributed dynamic scheduling for job shop [J]. Information and Control, 2001, 30(4): 292-296 (in Chinese).
    • (2001) Information and Control , vol.30 , Issue.4 , pp. 292-296
    • Qiao, B.1    Sun, Z.2    Zhu, J.3
  • 9
    • 0035392459 scopus 로고    scopus 로고
    • A multi-agent and contract-net based on scheduling approach for agile manufacturing cell
    • Chinese source
    • SHI Ke, LI Peigen. A multi-agent and contract-net based on scheduling approach for agile manufacturing cell [J]. Jour. Huazhong Univ. of Sci. and Tech., 2001, 29(7): 32-34 (in Chinese).
    • (2001) Jour. Huazhong Univ. of Sci. and Tech. , vol.29 , Issue.7 , pp. 32-34
    • Shi, K.1    Li, P.2
  • 10
    • 0034240282 scopus 로고    scopus 로고
    • Multi-agent and rule based dynamic scheduling system for agile manufacturing job shop
    • Chinese source
    • WANG Yanhong, YIN Chaowan, ZHANG Yu. Multi-agent and rule based dynamic scheduling system for agile manufacturing job shop [J]. Computer Integrated Manufacturing Systems - CIMS, 2000, 6(4): 45-49 (in Chinese).
    • (2000) Computer Integrated Manufacturing Systems - CIMS , vol.6 , Issue.4 , pp. 45-49
    • Wang, Y.1    Yin, C.2    Zhang, Y.3
  • 11
    • 2942680075 scopus 로고    scopus 로고
    • A multi-agent based on controls system for agile manufacturing cell
    • Chinese source
    • SHI Ke, et al. A multi-agent based on controls system for agile manufacturing cell [J]. Jour. Huazhong Univ. of Sci. and Tech., 1999, 27(8): 21-23. (in Chinese).
    • (1999) Jour. Huazhong Univ. of Sci. and Tech. , vol.27 , Issue.8 , pp. 21-23
    • Shi, K.1
  • 12
    • 25344433777 scopus 로고    scopus 로고
    • Research on cell management and control system in agile manufacturing
    • Shanghai: Shanghai Jiaotong University, Chinese source
    • WANG Dong. Research on cell management and control system in agile manufacturing [D]. Shanghai: Shanghai Jiaotong University, 2001 (in Chinese).
    • (2001)
    • Wang, D.1
  • 13
    • 0036721870 scopus 로고    scopus 로고
    • Evaluation of agent-based manufacturing systems based on a parallel simulator
    • HUANG C Y, NOF S Y. Evaluation of agent-based manufacturing systems based on a parallel simulator [J]. Computer and Industrial Engineering, 2002, 43(3): 529-552.
    • (2002) Computer and Industrial Engineering , vol.43 , Issue.3 , pp. 529-552
    • Huang, C.Y.1    Nof, S.Y.2
  • 14
    • 0020504370 scopus 로고
    • Negotiation as a metaphor for distributed problem solving
    • DA VIS R, et al. Negotiation as a metaphor for distributed problem solving [J]. Artificial Intelligence, 1983, 20(1): 63-109.
    • (1983) Artificial Intelligence , vol.20 , Issue.1 , pp. 63-109
    • da Vis, R.1
  • 15
    • 0031366277 scopus 로고    scopus 로고
    • A negotiation based scheduling for items with flexible process plans
    • KIM K H, SONG J Y, WANG K H. A negotiation based scheduling for items with flexible process plans [J]. Computers and Industrial Engineering, 1997, 33(3-4): 785-788.
    • (1997) Computers and Industrial Engineering , vol.33 , Issue.3-4 , pp. 785-788
    • Kim, K.H.1    Song, J.Y.2    Wang, K.H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.