-
1
-
-
2142783861
-
Procurement system evaluation for construction industry
-
Ambrose, M. D., and Tucker, S. N., 2000. Procurement system evaluation for construction industry. Journal of Construction Procurement, 6 (No. 2):121–133.
-
(2000)
Journal of Construction Procurement
, vol.6
, Issue.2
, pp. 121-133
-
-
Ambrose, M.D.1
Tucker, S.N.2
-
2
-
-
84993093666
-
Client briefing processes and procurement method selection: A South African study
-
-104
-
Bowen, P. A., PEARL, R. G, and Edwards, P. J., 1999. Client briefing processes and procurement method selection:a South African study. Engineering Construction and Architectural Management, 6 (No. 2):91 -104
-
(1999)
Engineering Construction and Architectural Management
, vol.6
, Issue.2
, pp. 91
-
-
Bowen, P.A.1
Pearl, R.G.2
Edwards, P.J.3
-
4
-
-
0028397624
-
Choosing appropriate construction contracting method
-
Gordon, C. M., 1994. Choosing appropriate construction contracting method. Journal of Construction Engineering, 120:196–210.
-
(1994)
Journal of Construction Engineering
, vol.120
, pp. 196-210
-
-
Gordon, C.M.1
-
5
-
-
0028500251
-
Portfolio approach to strategic management of A/E firms
-
Veshosky, D., 1994. Portfolio approach to strategic management of A/E firms. Journal of Management in Engineering, 10 (No. 5):41–47.
-
(1994)
Journal of Management in Engineering
, vol.10
, Issue.5
, pp. 41-47
-
-
Veshosky, D.1
-
6
-
-
0029411707
-
Use of design/build in E/C industry
-
Yates, J. K., 1995. Use of design/build in E/C industry. Journal of Management in Engineering, 11 (No. 6):33–38.
-
(1995)
Journal of Management in Engineering
, vol.11
, Issue.6
, pp. 33-38
-
-
Yates, J.K.1
-
8
-
-
84992979389
-
An introduction to the design/build method, in
-
Muir T., Rance B., (eds), London: E&FN Spon
-
Arnison, C., 1995. “ An introduction to the design/build method, in ”. In Collaborative Practice in the Built Environment Edited by:Muir, T., and Rance, B., 81–93. London:E&FN Spon.
-
(1995)
Collaborative Practice in the Built Environment
, pp. 81-93
-
-
Arnison, C.1
-
12
-
-
38849118687
-
The reasons why client prefer to procure more projects based on design-bid-build than design and build
-
Ling, Y. Y., KHEE, H. Y, and Lim, K. S.G. 2000. The reasons why client prefer to procure more projects based on design-bid-build than design and build. Journal of Construction Procurement, 6 (No. 2):135–146.
-
(2000)
Journal of Construction Procurement
, vol.6
, Issue.2
, pp. 135-146
-
-
Ling, Y.Y.1
Khee, H.Y.2
Lim, K.S.G.3
-
14
-
-
0004047083
-
-
Bennett, J., Pothecary, E., and Robinson, G., 1996. Designing and Building a World-Class Industry. Centre for Strategic Studies in Construction, Reading, UK
-
(1996)
Designing and Building a World-Class Industry. Centre for Strategic Studies in Construction, Reading, UK
-
-
Bennett, J.1
Pothecary, E.2
Robinson, G.3
-
15
-
-
0022937122
-
The contractor as designer, in
-
Rowlinson, S. M., and Langford, D., 1986. “ The contractor as designer, in ”. In Proceedings of IABSE Workshop. IABSE, Zurich 169–175.
-
(1986)
Proceedings of IABSE Workshop. IABSE, Zurich
, pp. 169-175
-
-
Rowlinson, S.M.1
Langford, D.2
-
18
-
-
0030110117
-
The construction manager as project integrator
-
Kluenker, C. H., 1996. The construction manager as project integrator. Journal of Management in Engineering, 12 (No. 2):17–20.
-
(1996)
Journal of Management in Engineering
, vol.12
, Issue.2
, pp. 17-20
-
-
Kluenker, C.H.1
-
19
-
-
2442547898
-
JCT with contractor's design form of contract: A case study
-
Pain, J., and Bennett, J., 1988. JCT with contractor's design form of contract:a case study. Construction Management and Economics, 6:307–337.
-
(1988)
Construction Management and Economics
, vol.6
, pp. 307-337
-
-
Pain, J.1
Bennett, J.2
-
20
-
-
13844283612
-
Design-build has got cost, time edge
-
Krizan, W. G., 1997. Design-build has got cost, time edge. Engineering News Record, 239 (No. 20):16
-
(1997)
Engineering News Record
, vol.239
, Issue.20
, pp. 16
-
-
Krizan, W.G.1
-
21
-
-
84861143214
-
Design and build: A survey of construction contractors' view
-
Atkintoye, A., 1994. Design and build:a survey of construction contractors' view. Construction Management and Economics, 12:155–163.
-
(1994)
Construction Management and Economics
, vol.12
, pp. 155-163
-
-
Atkintoye, A.1
-
23
-
-
0012235718
-
Design and build: A survey of architects' views
-
Atkintoye, A., and Fitzgerald, E., 1995. Design and build:a survey of architects' views. Engineering Construction and Architectural Management, 2 (No. 1):27–45.
-
(1995)
Engineering Construction and Architectural Management
, vol.2
, Issue.1
, pp. 27-45
-
-
Atkintoye, A.1
Fitzgerald, E.2
-
24
-
-
13844287267
-
Performance of design-build projects in terms of cost, quality and time: Views of clients, architects and contractors in Singapore
-
Ling, Y. Y., and Leong, E. F.K., 2002. Performance of design-build projects in terms of cost, quality and time:views of clients, architects and contractors in Singapore. The Australian Journal of Construction Economics and Building, 2 (No. 1):37–46.
-
(2002)
The Australian Journal of Construction Economics and Building
, vol.2
, Issue.1
, pp. 37-46
-
-
Ling, Y.Y.1
Leong, E.F.K.2
-
26
-
-
85024163490
-
Subjective quality decisions in multi-parameter bidding procurement systems, in
-
Taylor R.G., (ed), Durban, South Africa: University of Natal
-
Ormerod, M., 1996. “ Subjective quality decisions in multi-parameter bidding procurement systems, in ”. In Proceedings of the CIB W92- Procurement Systems North Meets South:Developing Ideas Edited by:Taylor, R. G., 492–500. Durban, South Africa:University of Natal.
-
(1996)
Proceedings of the CIB W92- Procurement Systems North Meets South: Developing Ideas
, pp. 492-500
-
-
Ormerod, M.1
-
28
-
-
0013229112
-
A review of contractor selection practice in the UK construction industry
-
Holt, G. D., OLOMOLAIYE, P. O, and Harris, F. C., 1995. A review of contractor selection practice in the UK construction industry. Building and Environment, 30 (No. 4):553–561.
-
(1995)
Building and Environment
, vol.30
, Issue.4
, pp. 553-561
-
-
Holt, G.D.1
Olomolaiye, P.O.2
Harris, F.C.3
-
29
-
-
85024218129
-
-
Singapore: BCA, Retrieved 1 July 2002 from
-
B.C.A. Building and Construction Authority home page. 2002. Singapore:BCA. Retrieved 1 July 2002 from www.bca.gov.sg
-
(2002)
-
-
-
30
-
-
85024153347
-
The economics of procurement methods-with special reference to public housing projects in Hong Kong, in
-
Taylor R.G., (ed), Durban, South Africa: University of Natal
-
Chau, K. W., LEUNG, H. F, and Ho, D. C.W., 1996. “ The economics of procurement methods-with special reference to public housing projects in Hong Kong, in ”. In Proceedings of CIB-W92—Procurement Systems:North Meets South:Developing Ideas Edited by:Taylor, R. G., 40–52. Durban, South Africa:University of Natal.
-
(1996)
Proceedings of CIB-W92—Procurement Systems: North Meets South: Developing Ideas
, pp. 40-52
-
-
Chau, K.W.1
Leung, H.F.2
Ho, D.C.W.3
-
31
-
-
85024174796
-
Rise and rise of design and build
-
March
-
Gosney, J., 1989. Rise and rise of design and build. Contract Journal, 2 March:18–20.
-
(1989)
Contract Journal
, vol.2
, pp. 18-20
-
-
Gosney, J.1
-
35
-
-
85024166655
-
Novation contract: An innovative variation to design-build, in
-
Singapore: School of Building and Estate Management, NUS
-
Chan, A. P.C, and Lam, P. T., 1995. “ Novation contract:an innovative variation to design-build, in ”. In Proceedings of the First International Congress on Construction:Design and Build Projects- International Experiences 197–203. Singapore:School of Building and Estate Management, NUS.
-
(1995)
Proceedings of the First International Congress on Construction: Design and Build Projects- International Experiences
, pp. 197-203
-
-
Chan, A.P.C.1
Lam, P.T.2
-
36
-
-
67651079207
-
Which procurement system? Towards a universal procurement selection technique
-
Skitmore, R. M., and Marsden, D. E., 1998. Which procurement system? Towards a universal procurement selection technique. Construction Management and Economics, 6:71–89.
-
(1998)
Construction Management and Economics
, vol.6
, pp. 71-89
-
-
Skitmore, R.M.1
Marsden, D.E.2
-
37
-
-
4143115568
-
-
Bresnen, M. J., HASLAM, C. D, Beardsworth, A. D., Bryman, A. E., and Hell, T. E., 1988. Performance on Site and the Building Client. Chartered Institute of Building Occasional Paper No. 42, Ascot, UK
-
(1988)
Performance on Site and the Building Client. Chartered Institute of Building Occasional Paper No. 42, Ascot, UK
-
-
Bresnen, M.J.1
Haslam, C.D.2
Beardsworth, A.D.3
Bryman, A.E.4
Hell, T.E.5
-
38
-
-
27744582527
-
-
Austin, TX: Construction Industry Institute
-
Thomas, S. R., MACKEN, C. L, Chung, T. H., and Kim, I., 2002. Measuring the impacts of the delivery system on project performance- design-build and design-bid-build Austin, TX:Construction Industry Institute.
-
(2002)
Measuring the impacts of the delivery system on project performance- design-build and design-bid-build
-
-
Thomas, S.R.1
Macken, C.L.2
Chung, T.H.3
Kim, I.4
|