메뉴 건너뛰기




Volumn 126, Issue 1, 2000, Pages 10-14

One company's experience with design/build: labor cost risk and profit potential

Author keywords

[No Author keywords available]

Indexed keywords

COST EFFECTIVENESS; COSTS; HIGHWAY PLANNING; HIGHWAY SYSTEMS; PERSONNEL; ROAD CONSTRUCTION; STRUCTURAL DESIGN;

EID: 0033686989     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2000)126:1(10)     Document Type: Article
Times cited : (39)

References (7)
  • 1
    • 0342565645 scopus 로고    scopus 로고
    • Design-build continues to grow in U.S.
    • ASCE. (1996). "Design-build continues to grow in U.S." Civ. Engrg., 66(12), 18-19.
    • (1996) Civ. Engrg. , vol.66 , Issue.12 , pp. 18-19
  • 2
    • 0343435610 scopus 로고    scopus 로고
    • Design-build lops 10 off costs for new San Juan line
    • May
    • "Design-build lops 10 off costs for new San Juan line." (1996). ENR, (May), 21.
    • (1996) ENR , pp. 21
  • 6
    • 85040779900 scopus 로고    scopus 로고
    • Project delivery systems: CM at risk, design-build, design-bid-build
    • Construction Industry Institute, Austin, Tex.
    • "Project delivery systems: CM at risk, design-build, design-bid-build." (1997). Research summary 133-1. Construction Industry Institute, Austin, Tex.
    • (1997) Research Summary 133-1 , vol.133 , Issue.1 , pp. 133-141n
  • 7
    • 0343871370 scopus 로고
    • Delivering public works projects - Different approaches
    • March
    • Smith, D. G. (1994). "Delivering public works projects - Different approaches." Public Works, (March), 61-62.
    • (1994) Public Works , pp. 61-62
    • Smith, D.G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.