-
1
-
-
29244486594
-
Earthworks scheduling and monitoring using GPS
-
presented at the Trimble Users Conference Jose Convention Center. 14-16 October
-
Ackroyd, N. (1998) Earthworks scheduling and monitoring using GPS, presented at the Trimble Users Conference. In San Jose Convention Center. 14-16 October
-
(1998)
-
-
Ackroyd, N.1
-
2
-
-
0343536396
-
Semantic validation of product and process models
-
Baugh, J. W. and Chadha, H. S. (1997) Semantic validation of product and process models. Journal of Computing in Civil Engineering, ASCE, 11((1)), pp. 26 - 36.
-
(1997)
Journal of Computing in Civil Engineering, ASCE
, vol.11
, Issue.1
, pp. 26-36
-
-
Baugh, J.W.1
Chadha, H.S.2
-
3
-
-
29244478115
-
Caterpillar
-
CAESultra - Computer Aided Earthmoving System. available from: (accessed 9 July 2003)
-
CAESultra - Computer Aided Earthmoving System. 2003. Caterpillar available from: http://www.cat.com/products/shared/technology_products/ 01_products/_products_caesultra.html (accessed 9 July 2003)
-
(2003)
-
-
-
4
-
-
29244491252
-
Earthworks scheduling and monitoring using GPS - Document
-
e-mail to Ronie Navon, 3 February
-
Harper, M.(2003) Earthworks scheduling and monitoring using GPS - document. In. e-mail to Ronie Navon, 3 February
-
(2003)
-
-
Harper, M.1
-
5
-
-
0035133939
-
Status of roller mountable microwave asphalt pavement density sensor
-
Jaselskis, E. J. and Han, H. C. and Grigas, J. and Tan, L. and Fahrion, D. (2001) Status of roller mountable microwave asphalt pavement density sensor. Journal of Construction Engineering and Management, ASCE, 127((1)), pp. 46 - 52.
-
(2001)
Journal of Construction Engineering and Management, ASCE
, vol.127
, Issue.1
, pp. 46-52
-
-
Jaselskis, E.J.1
Han, H.C.2
Grigas, J.3
Tan, L.4
Fahrion, D.5
-
6
-
-
0345813226
-
Development of an experience database for truck loading operations
-
Kannan, G. and Vorster, M. (2000) Development of an experience database for truck loading operations. Journal of Construction Engineering and Management, ASCE, 126((3)), pp. 201 - 09.
-
(2000)
Journal of Construction Engineering and Management, ASCE
, vol.126
, Issue.3
, pp. 201-209
-
-
Kannan, G.1
Vorster, M.2
-
7
-
-
0011423681
-
AutoPave: Towards an automated paving system for asphalt pavement compaction operations
-
Krishnamurthy, B. K. and Tserng, H. P. and Schmitt, R. L. and Russell, J. S. and Bahia, H. U. and Hanna, A. S. (1998) AutoPave: Towards an automated paving system for asphalt pavement compaction operations. Automation in Construction, 8((2)), pp. 165 - 80.
-
(1998)
Automation in Construction
, vol.8
, Issue.2
, pp. 165-180
-
-
Krishnamurthy, B.K.1
Tserng, H.P.2
Schmitt, R.L.3
Russell, J.S.4
Bahia, H.U.5
Hanna, A.S.6
-
9
-
-
0034225611
-
Probability distribution functions for construction simulation
-
Maio, C. and Schexnayder, C. and Knutson, K. and Weber, S. (2000) Probability distribution functions for construction simulation. Journal of Construction Engineering and Management, ASCE, 126((4)), pp. 285 - 92.
-
(2000)
Journal of Construction Engineering and Management, ASCE
, vol.126
, Issue.4
, pp. 285-292
-
-
Maio, C.1
Schexnayder, C.2
Knutson, K.3
Weber, S.4
-
10
-
-
13944261575
-
Validation of vibration-based onboard asphalt density measuring system
-
Minchin, R. E. and Thomas, H. R. (2003) Validation of vibration-based onboard asphalt density measuring system. Journal of Construction Engineering and Management, ASCE, 129((1)), pp. 1 - 7.
-
(2003)
Journal of Construction Engineering and Management, ASCE
, vol.129
, Issue.1
, pp. 1-7
-
-
Minchin, R.E.1
Thomas, H.R.2
-
11
-
-
0346639292
-
A concept proving prototype of automated earthmoving control
-
Navon, R. and Goldschmidt, E. and Shpatnitsky, Y. (2004) A concept proving prototype of automated earthmoving control. Automation in Construction, 13((2)), pp. 225 - 39.
-
(2004)
Automation in Construction
, vol.13
, Issue.2
, pp. 225-239
-
-
Navon, R.1
Goldschmidt, E.2
Shpatnitsky, Y.3
-
14
-
-
0033707986
-
The computer integrated road construction project
-
Peyret, F. and Jurasz, J. and Carrel, A. and Zekri, E. and Gorham, B. (2000) The computer integrated road construction project. Automation in Construction, 9((5-6)), pp. 447 - 61.
-
(2000)
Automation in Construction
, vol.9
, Issue.5-6
, pp. 447-461
-
-
Peyret, F.1
Jurasz, J.2
Carrel, A.3
Zekri, E.4
Gorham, B.5
-
15
-
-
29244467204
-
-
SiteVision - Revolutionary 3D GPS Grade Control System for Your Whole Fleet. Trimble available from (9 July 2003)
-
SiteVision - Revolutionary 3D GPS Grade Control System for Your Whole Fleet. 2003. Trimble available from: http://www.trimble.com/ sitevision.html (9 July 2003)
-
(2003)
-
-
-
18
-
-
0031337168
-
-
Instantaneous Motion Planning and Controlling Tool (IMPACT) for construction equipment
-
Tserng, H. P. and Russell, J. S.(1997) Instantaneous Motion Planning and Controlling Tool (IMPACT) for construction equipment. In Construction Congress Proceedings - ASCE. (pp. 1020 - 29).
-
(1997)
Construction Congress Proceedings - ASCE
, pp. 1020-1029
-
-
Tserng, H.P.1
Russell, J.S.2
|