메뉴 건너뛰기




Volumn 105, Issue 9, 2005, Pages 1206-1224

Enhancing ERP system's functionality with discrete event simulation

Author keywords

Lead times; Production planning; Resource management; Simulation; Uncertainty management

Indexed keywords

COMPUTER SIMULATION; PRODUCTION;

EID: 28644450880     PISSN: 02635577     EISSN: None     Source Type: Journal    
DOI: 10.1108/02635570510633266     Document Type: Article
Times cited : (49)

References (25)
  • 1
    • 0032112063 scopus 로고    scopus 로고
    • Putting the enterprise into the enterprise system
    • Davenport, T. (1998), "Putting the enterprise into the enterprise system", Harvard Business Review, Vol. 76, pp. 121-31.
    • (1998) Harvard Business Review , vol.76 , pp. 121-131
    • Davenport, T.1
  • 5
    • 10444221736 scopus 로고    scopus 로고
    • Analyzing convergence alternatives across existing SAP solutions
    • Gulledge, T.R., Sommer, R.A. and Simon, G. (2004), "Analyzing convergence alternatives across existing SAP solutions", Industrial Management & Data Systems, Vol. 104, pp. 722-34.
    • (2004) Industrial Management & Data Systems , vol.104 , pp. 722-734
    • Gulledge, T.R.1    Sommer, R.A.2    Simon, G.3
  • 8
    • 0001178440 scopus 로고
    • The cost of inflated planning lead-times in MRP systems
    • John, R.S. (1985), "The cost of inflated planning lead-times in MRP systems", Journal of Operations Management, Vol. 5, pp. 119-28.
    • (1985) Journal of Operations Management , vol.5 , pp. 119-128
    • John, R.S.1
  • 9
    • 18844412952 scopus 로고    scopus 로고
    • Enterprise resource planning and organisational innovation: A management perspective
    • McAdam, R. and Galloway, A. (2005), "Enterprise resource planning and organisational innovation: a management perspective", Industrial Management & Data Systems, Vol. 105, pp. 280-90.
    • (2005) Industrial Management & Data Systems , vol.105 , pp. 280-290
    • McAdam, R.1    Galloway, A.2
  • 12
    • 0020895635 scopus 로고
    • A modeling framework for planning and control for production in discrete parts manufacturing and assembly systems
    • Maxwell, W., Muckstadt, J.A., Thomas, L.J. and Vadereecken, J. (1983), "A modeling framework for planning and control for production in discrete parts manufacturing and assembly systems", Interfaces, Vol. 13, pp. 92-104.
    • (1983) Interfaces , vol.13 , pp. 92-104
    • Maxwell, W.1    Muckstadt, J.A.2    Thomas, L.J.3    Vadereecken, J.4
  • 15
    • 0003338125 scopus 로고    scopus 로고
    • Advanced planning and scheduling for manufacturing
    • Salvendy, G. 3rd ed. Wiley New York, NY
    • Musselman, K.J. and Uzsoy, R. (2001), "Advanced planning and scheduling for manufacturing", in Salvendy, G. (Ed.), Handbook of Industrial Engineering, 3rd ed., Wiley, New York, NY.
    • (2001) Handbook of Industrial Engineering
    • Musselman, K.J.1    Uzsoy, R.2
  • 16
  • 17
    • 0037448856 scopus 로고    scopus 로고
    • Enterprise resource planning survey of Swedish manufacturing firms
    • Olhager, J. and Selldin, E. (2003), "Enterprise resource planning survey of Swedish manufacturing firms", European Journal of Operational Research, Vol. 146, pp. 365-73.
    • (2003) European Journal of Operational Research , vol.146 , pp. 365-373
    • Olhager, J.1    Selldin, E.2
  • 20
    • 0016842326 scopus 로고
    • Design considerations for improving the effectiveness of MRP
    • Peterson, L.D. (1975), "Design considerations for improving the effectiveness of MRP", Production and Inventory Management, Vol. 16, pp. 48-68.
    • (1975) Production and Inventory Management , vol.16 , pp. 48-68
    • Peterson, L.D.1
  • 22
    • 0025575163 scopus 로고
    • paper presented at the American Production and Inventory Control Conference APICS Atlanta, GA
    • Toye, C.A. (1990), "Let's update capacity requirements planning logic", paper presented at the American Production and Inventory Control Conference, APICS, Atlanta, GA.
    • (1990) Let's Update Capacity Requirements Planning Logic
    • Toye, C.A.1
  • 23
    • 0002274219 scopus 로고
    • Input/output control: A real handle on lead-time
    • Wright, O. (1970), "Input/output control: a real handle on lead-time", Production and Inventory Management, Vol. 11, pp. 9-31.
    • (1970) Production and Inventory Management , vol.11 , pp. 9-31
    • Wright, O.1
  • 24
    • 0024731596 scopus 로고
    • An application of discrete event simulation to on-line control and scheduling in flexible manufacturing
    • Wu, D.S. and Wysk, R.A. (1989), "An application of discrete event simulation to on-line control and scheduling in flexible manufacturing", International Journal of Production Research, Vol. 27, pp. 1603-24.
    • (1989) International Journal of Production Research , vol.27 , pp. 1603-1624
    • Wu, D.S.1    Wysk, R.A.2
  • 25
    • 18844370935 scopus 로고    scopus 로고
    • Causes influencing the effectiveness of the post-implementation ERP system
    • Yu, C-S. (2005), "Causes influencing the effectiveness of the post-implementation ERP system", Industrial Management & Data Systems, Vol. 105, pp. 115-32.
    • (2005) Industrial Management & Data Systems , vol.105 , pp. 115-132
    • Yu, C.-S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.