-
2
-
-
0022693736
-
A comparison of strategies to dampen nervousness in MRP systems
-
Blackburn, J.D., Kropp, D.H. and Millen, R.A., A comparison of strategies to dampen nervousness in MRP systems. Manage. Sci., 1986, 32(4), 413-429.
-
(1986)
Manage. Sci.
, vol.32
, Issue.4
, pp. 413-429
-
-
Blackburn, J.D.1
Kropp, D.H.2
Millen, R.A.3
-
3
-
-
0019913634
-
Improve heuristics for multi-stage requirements planning system
-
Blackburn, J.D. and Millen, R.A., Improve heuristics for multi-stage requirements planning system. Manage. Sci., 1982, 28(1), 44-56.
-
(1982)
Manage. Sci.
, vol.28
, Issue.1
, pp. 44-56
-
-
Blackburn, J.D.1
Millen, R.A.2
-
4
-
-
27844446869
-
Optimizing working capital via increased dynamism
-
Cahn, D., Optimizing working capital via increased dynamism. Manuf Syst., 1995, 13(7), 16-20.
-
(1995)
Manuf Syst.
, vol.13
, Issue.7
, pp. 16-20
-
-
Cahn, D.1
-
5
-
-
0005827249
-
Scheduling is not the problem
-
Campbell, K.L., Scheduling is not the problem. Prod. Invent. Manage., 1971, 12(3), 53-60.
-
(1971)
Prod. Invent. Manage.
, vol.12
, Issue.3
, pp. 53-60
-
-
Campbell, K.L.1
-
6
-
-
0018507737
-
Less nervous MRP systems: A dynamic economic lot sizing approach
-
Carlson, R.C., Jucker, J.V. and Kropp, D.H., Less nervous MRP systems: a dynamic economic lot sizing approach. Manage. Sci., 1979, 25(8), 754-761.
-
(1979)
Manage. Sci.
, vol.25
, Issue.8
, pp. 754-761
-
-
Carlson, R.C.1
Jucker, J.V.2
Kropp, D.H.3
-
7
-
-
0026954975
-
Simulation studies on JIT production
-
Chu, C.H. and Shih, W.L., Simulation studies on JIT production. Int. J. Prod. Res., 1992, 30(11), 2573-2586.
-
(1992)
Int. J. Prod. Res.
, vol.30
, Issue.11
, pp. 2573-2586
-
-
Chu, C.H.1
Shih, W.L.2
-
8
-
-
0032091994
-
The value of rescheduling functionality within standard MRP packages
-
Euwe, M.J., Jansen, P.A.L. and Veldkamp, C.T.H., The value of rescheduling functionality within standard MRP packages. Prod. Plan. Control, 1998, 9(4), 328-334.
-
(1998)
Prod. Plan. Control
, vol.9
, Issue.4
, pp. 328-334
-
-
Euwe, M.J.1
Jansen, P.A.L.2
Veldkamp, C.T.H.3
-
9
-
-
0021427334
-
A simulation based experimental investigation of supply/ timing uncertainty in MRP systems
-
Grasso, E.T. and Taylor, B.W., A simulation based experimental investigation of supply/ timing uncertainty in MRP systems. Int. J. Prod. Res., 1984, 22(3), 485-497.
-
(1984)
Int. J. Prod. Res.
, vol.22
, Issue.3
, pp. 485-497
-
-
Grasso, E.T.1
Taylor, B.W.2
-
10
-
-
0030385323
-
Safety production plans in MRP-system using transform methodology
-
Grubbström, R.W. and Molinder, A., Safety production plans in MRP-system using transform methodology. Int. J. Prod. Econ., 1996, 46-47, 297-309.
-
(1996)
Int. J. Prod. Econ.
, vol.46-47
, pp. 297-309
-
-
Grubbström, R.W.1
Molinder, A.2
-
11
-
-
0021407167
-
Implementation aspects of computer aided production control
-
Herman, J., Implementation aspects of computer aided production control. Eng. Costs Prod. Econ., 1985, 9(1-3), 219-224.
-
(1985)
Eng. Costs Prod. Econ.
, vol.9
, Issue.1-3
, pp. 219-224
-
-
Herman, J.1
-
13
-
-
3343026709
-
An examination of a distribution requirements planning problem: System nervousness
-
Ho, C., An examination of a distribution requirements planning problem: system nervousness. J. Bus. Logist., 1992, 13(2), 257-269.
-
(1992)
J. Bus. Logist.
, vol.13
, Issue.2
, pp. 257-269
-
-
Ho, C.1
-
14
-
-
0028396781
-
Evaluating the impact of frequent engineering changes on MRP system performance
-
Ho, C., Evaluating the impact of frequent engineering changes on MRP system performance. Int. J. Prod. Res., 1994, 32(1), 619-641.
-
(1994)
Int. J. Prod. Res.
, vol.32
, Issue.1
, pp. 619-641
-
-
Ho, C.1
-
15
-
-
0029734543
-
An investigation of alternative dampening procedures to cope with MRP system nervousness: A simulation study
-
Ho, C. and Carter, P.L., An investigation of alternative dampening procedures to cope with MRP system nervousness: a simulation study. Int. J. Prod. Res., 1996, 34(1), 137-156.
-
(1996)
Int. J. Prod. Res.
, vol.34
, Issue.1
, pp. 137-156
-
-
Ho, C.1
Carter, P.L.2
-
16
-
-
0037143048
-
Evaluating dampening effect of alternative lot-sizing rules to reduce MRP system nervousness
-
Ho, C., Evaluating dampening effect of alternative lot-sizing rules to reduce MRP system nervousness. Int. J. Prod. Res., 2002, 40(11), 2633-2652.
-
(2002)
Int. J. Prod. Res.
, vol.40
, Issue.11
, pp. 2633-2652
-
-
Ho, C.1
-
17
-
-
3343002422
-
Can you trust the computer to reschedule?
-
Jackson, J.S., Can you trust the computer to reschedule? In 1974 APICS Conference Proceedings, 1974, pp. 216-224.
-
(1974)
1974 APICS Conference Proceedings
, pp. 216-224
-
-
Jackson, J.S.1
-
18
-
-
0015681904
-
An economic evaluation of job shop dispatching rules
-
Jones, C.H., An economic evaluation of job shop dispatching rules. Manage. Sci., 1973, 20(3), 293-307.
-
(1973)
Manage. Sci.
, vol.20
, Issue.3
, pp. 293-307
-
-
Jones, C.H.1
-
19
-
-
0017417271
-
Reschedule the reschedules you just rescheduled: Way of life for MRP?
-
Mather, H., Reschedule the reschedules you just rescheduled: way of life for MRP? Prod. Invent. Manage., 1977, 18(1), 60-79.
-
(1977)
Prod. Invent. Manage.
, vol.18
, Issue.1
, pp. 60-79
-
-
Mather, H.1
-
21
-
-
0011782944
-
Survey of MRP nervousness issues
-
Minifie, J.R. and Davis, R.A., Survey of MRP nervousness issues. Prod. Invent. Manage., 1986, 27(3), 111-120.
-
(1986)
Prod. Invent. Manage.
, vol.27
, Issue.3
, pp. 111-120
-
-
Minifie, J.R.1
Davis, R.A.2
-
24
-
-
0040055579
-
Information: A viable substitute for inventory
-
O'Neil, B.F., Information: a viable substitute for inventory. Logist. Transport. Rev., 1986, 22(1), 83-89.
-
(1986)
Logist. Transport. Rev.
, vol.22
, Issue.1
, pp. 83-89
-
-
O'Neil, B.F.1
-
26
-
-
0017296976
-
Rescheduling with tomorrow's MRP system
-
Orlicky, J.A., Rescheduling with tomorrow's MRP system. Prod. Invent. Manage., 1976, 17(2), 38-48.
-
(1976)
Prod. Invent. Manage.
, vol.17
, Issue.2
, pp. 38-48
-
-
Orlicky, J.A.1
-
27
-
-
0001983780
-
Open order due date maintenance in MRP systems
-
Penlesky, R.J., Berry, W.L. and Wemmerlov, U., Open order due date maintenance in MRP systems. Manage. Sci., 1989, 35(5), 571-584.
-
(1989)
Manage. Sci.
, vol.35
, Issue.5
, pp. 571-584
-
-
Penlesky, R.J.1
Berry, W.L.2
Wemmerlov, U.3
-
28
-
-
0016842326
-
Design considerations for improving the effectiveness of MRP
-
Peterson, L.D., Design considerations for improving the effectiveness of MRP. Prod. Invent. Manage., 1975, 16(3), 48-68.
-
(1975)
Prod. Invent. Manage.
, vol.16
, Issue.3
, pp. 48-68
-
-
Peterson, L.D.1
-
31
-
-
0000354915
-
Resolving uncertainty in manufacturing systems
-
Schmitt, T.G., Resolving uncertainty in manufacturing systems. J. Operat. Manage., 1984, 4(4), 311-345.
-
(1984)
J. Operat. Manage.
, vol.4
, Issue.4
, pp. 311-345
-
-
Schmitt, T.G.1
-
32
-
-
0030395620
-
Formulas of MRP
-
Segerstedt, A., Formulas of MRP. Int. J. Prod. Econ., 1996, 46-47, 127-136.
-
(1996)
Int. J. Prod. Econ.
, vol.46-47
, pp. 127-136
-
-
Segerstedt, A.1
-
33
-
-
0025399203
-
Master production scheduling make-to-stock products: A framework for analysis
-
Sridharan, V. and Berry, W.L., Master production scheduling make-to-stock products: a framework for analysis. Int. J. Prod. Res., 1990, 28(3), 541-558.
-
(1990)
Int. J. Prod. Res.
, vol.28
, Issue.3
, pp. 541-558
-
-
Sridharan, V.1
Berry, W.L.2
-
34
-
-
0022077111
-
MRP and inventories
-
Wijngaard, J. and Worthmann, J.C., MRP and inventories. Eur. J. Oper. Res., 1985, 20(3), 281-293.
-
(1985)
Eur. J. Oper. Res.
, vol.20
, Issue.3
, pp. 281-293
-
-
Wijngaard, J.1
Worthmann, J.C.2
-
35
-
-
84989412809
-
Material requirements planning under certainty
-
Whybark, D.C. and Williams, J.G., Material requirements planning under certainty. Decis. Sci., 1976, 7(4), 595-606.
-
(1976)
Decis. Sci.
, vol.7
, Issue.4
, pp. 595-606
-
-
Whybark, D.C.1
Williams, J.G.2
-
36
-
-
0027224847
-
One-machine rescheduling heuristics with efficiency and stability as criteria
-
Wu, S.D., Storer, R.H. and Chang, P., One-machine rescheduling heuristics with efficiency and stability as criteria. Comput. Oper. Res., 1993, 20(1), 1-14.
-
(1993)
Comput. Oper. Res.
, vol.20
, Issue.1
, pp. 1-14
-
-
Wu, S.D.1
Storer, R.H.2
Chang, P.3
-
37
-
-
4444312779
-
Development of finite capacity material requirement planning system for assembly operations
-
Wuttipornpun, T. and Yenradee, P., Development of finite capacity material requirement planning system for assembly operations. Prod. Plan. Control, 2004, 15(5), 534-549.
-
(2004)
Prod. Plan. Control
, vol.15
, Issue.5
, pp. 534-549
-
-
Wuttipornpun, T.1
Yenradee, P.2
-
38
-
-
0022236783
-
An analysis of scheduling policies in multi-echelon production systems
-
Yano, C. and Carlson, R.C., An analysis of scheduling policies in multi-echelon production systems. IIE Trans., 1985, 17(4), 370-377.
-
(1985)
IIE Trans.
, vol.17
, Issue.4
, pp. 370-377
-
-
Yano, C.1
Carlson, R.C.2
|