메뉴 건너뛰기




Volumn 43, Issue 19, 2005, Pages 4009-4033

Examining dampening effects for alternative dampening procedures to cope with system nervousness

Author keywords

Dampening effects; Dampening procedures; System nervousness

Indexed keywords

PERFORMANCE; SCHEDULING;

EID: 27844567738     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540500147935     Document Type: Article
Times cited : (12)

References (38)
  • 2
    • 0022693736 scopus 로고
    • A comparison of strategies to dampen nervousness in MRP systems
    • Blackburn, J.D., Kropp, D.H. and Millen, R.A., A comparison of strategies to dampen nervousness in MRP systems. Manage. Sci., 1986, 32(4), 413-429.
    • (1986) Manage. Sci. , vol.32 , Issue.4 , pp. 413-429
    • Blackburn, J.D.1    Kropp, D.H.2    Millen, R.A.3
  • 3
    • 0019913634 scopus 로고
    • Improve heuristics for multi-stage requirements planning system
    • Blackburn, J.D. and Millen, R.A., Improve heuristics for multi-stage requirements planning system. Manage. Sci., 1982, 28(1), 44-56.
    • (1982) Manage. Sci. , vol.28 , Issue.1 , pp. 44-56
    • Blackburn, J.D.1    Millen, R.A.2
  • 4
    • 27844446869 scopus 로고
    • Optimizing working capital via increased dynamism
    • Cahn, D., Optimizing working capital via increased dynamism. Manuf Syst., 1995, 13(7), 16-20.
    • (1995) Manuf Syst. , vol.13 , Issue.7 , pp. 16-20
    • Cahn, D.1
  • 5
    • 0005827249 scopus 로고
    • Scheduling is not the problem
    • Campbell, K.L., Scheduling is not the problem. Prod. Invent. Manage., 1971, 12(3), 53-60.
    • (1971) Prod. Invent. Manage. , vol.12 , Issue.3 , pp. 53-60
    • Campbell, K.L.1
  • 6
    • 0018507737 scopus 로고
    • Less nervous MRP systems: A dynamic economic lot sizing approach
    • Carlson, R.C., Jucker, J.V. and Kropp, D.H., Less nervous MRP systems: a dynamic economic lot sizing approach. Manage. Sci., 1979, 25(8), 754-761.
    • (1979) Manage. Sci. , vol.25 , Issue.8 , pp. 754-761
    • Carlson, R.C.1    Jucker, J.V.2    Kropp, D.H.3
  • 7
    • 0026954975 scopus 로고
    • Simulation studies on JIT production
    • Chu, C.H. and Shih, W.L., Simulation studies on JIT production. Int. J. Prod. Res., 1992, 30(11), 2573-2586.
    • (1992) Int. J. Prod. Res. , vol.30 , Issue.11 , pp. 2573-2586
    • Chu, C.H.1    Shih, W.L.2
  • 8
    • 0032091994 scopus 로고    scopus 로고
    • The value of rescheduling functionality within standard MRP packages
    • Euwe, M.J., Jansen, P.A.L. and Veldkamp, C.T.H., The value of rescheduling functionality within standard MRP packages. Prod. Plan. Control, 1998, 9(4), 328-334.
    • (1998) Prod. Plan. Control , vol.9 , Issue.4 , pp. 328-334
    • Euwe, M.J.1    Jansen, P.A.L.2    Veldkamp, C.T.H.3
  • 9
    • 0021427334 scopus 로고
    • A simulation based experimental investigation of supply/ timing uncertainty in MRP systems
    • Grasso, E.T. and Taylor, B.W., A simulation based experimental investigation of supply/ timing uncertainty in MRP systems. Int. J. Prod. Res., 1984, 22(3), 485-497.
    • (1984) Int. J. Prod. Res. , vol.22 , Issue.3 , pp. 485-497
    • Grasso, E.T.1    Taylor, B.W.2
  • 10
    • 0030385323 scopus 로고    scopus 로고
    • Safety production plans in MRP-system using transform methodology
    • Grubbström, R.W. and Molinder, A., Safety production plans in MRP-system using transform methodology. Int. J. Prod. Econ., 1996, 46-47, 297-309.
    • (1996) Int. J. Prod. Econ. , vol.46-47 , pp. 297-309
    • Grubbström, R.W.1    Molinder, A.2
  • 11
    • 0021407167 scopus 로고
    • Implementation aspects of computer aided production control
    • Herman, J., Implementation aspects of computer aided production control. Eng. Costs Prod. Econ., 1985, 9(1-3), 219-224.
    • (1985) Eng. Costs Prod. Econ. , vol.9 , Issue.1-3 , pp. 219-224
    • Herman, J.1
  • 13
    • 3343026709 scopus 로고
    • An examination of a distribution requirements planning problem: System nervousness
    • Ho, C., An examination of a distribution requirements planning problem: system nervousness. J. Bus. Logist., 1992, 13(2), 257-269.
    • (1992) J. Bus. Logist. , vol.13 , Issue.2 , pp. 257-269
    • Ho, C.1
  • 14
    • 0028396781 scopus 로고
    • Evaluating the impact of frequent engineering changes on MRP system performance
    • Ho, C., Evaluating the impact of frequent engineering changes on MRP system performance. Int. J. Prod. Res., 1994, 32(1), 619-641.
    • (1994) Int. J. Prod. Res. , vol.32 , Issue.1 , pp. 619-641
    • Ho, C.1
  • 15
    • 0029734543 scopus 로고    scopus 로고
    • An investigation of alternative dampening procedures to cope with MRP system nervousness: A simulation study
    • Ho, C. and Carter, P.L., An investigation of alternative dampening procedures to cope with MRP system nervousness: a simulation study. Int. J. Prod. Res., 1996, 34(1), 137-156.
    • (1996) Int. J. Prod. Res. , vol.34 , Issue.1 , pp. 137-156
    • Ho, C.1    Carter, P.L.2
  • 16
    • 0037143048 scopus 로고    scopus 로고
    • Evaluating dampening effect of alternative lot-sizing rules to reduce MRP system nervousness
    • Ho, C., Evaluating dampening effect of alternative lot-sizing rules to reduce MRP system nervousness. Int. J. Prod. Res., 2002, 40(11), 2633-2652.
    • (2002) Int. J. Prod. Res. , vol.40 , Issue.11 , pp. 2633-2652
    • Ho, C.1
  • 17
  • 18
    • 0015681904 scopus 로고
    • An economic evaluation of job shop dispatching rules
    • Jones, C.H., An economic evaluation of job shop dispatching rules. Manage. Sci., 1973, 20(3), 293-307.
    • (1973) Manage. Sci. , vol.20 , Issue.3 , pp. 293-307
    • Jones, C.H.1
  • 19
    • 0017417271 scopus 로고
    • Reschedule the reschedules you just rescheduled: Way of life for MRP?
    • Mather, H., Reschedule the reschedules you just rescheduled: way of life for MRP? Prod. Invent. Manage., 1977, 18(1), 60-79.
    • (1977) Prod. Invent. Manage. , vol.18 , Issue.1 , pp. 60-79
    • Mather, H.1
  • 21
    • 0011782944 scopus 로고
    • Survey of MRP nervousness issues
    • Minifie, J.R. and Davis, R.A., Survey of MRP nervousness issues. Prod. Invent. Manage., 1986, 27(3), 111-120.
    • (1986) Prod. Invent. Manage. , vol.27 , Issue.3 , pp. 111-120
    • Minifie, J.R.1    Davis, R.A.2
  • 24
    • 0040055579 scopus 로고
    • Information: A viable substitute for inventory
    • O'Neil, B.F., Information: a viable substitute for inventory. Logist. Transport. Rev., 1986, 22(1), 83-89.
    • (1986) Logist. Transport. Rev. , vol.22 , Issue.1 , pp. 83-89
    • O'Neil, B.F.1
  • 26
    • 0017296976 scopus 로고
    • Rescheduling with tomorrow's MRP system
    • Orlicky, J.A., Rescheduling with tomorrow's MRP system. Prod. Invent. Manage., 1976, 17(2), 38-48.
    • (1976) Prod. Invent. Manage. , vol.17 , Issue.2 , pp. 38-48
    • Orlicky, J.A.1
  • 27
    • 0001983780 scopus 로고
    • Open order due date maintenance in MRP systems
    • Penlesky, R.J., Berry, W.L. and Wemmerlov, U., Open order due date maintenance in MRP systems. Manage. Sci., 1989, 35(5), 571-584.
    • (1989) Manage. Sci. , vol.35 , Issue.5 , pp. 571-584
    • Penlesky, R.J.1    Berry, W.L.2    Wemmerlov, U.3
  • 28
    • 0016842326 scopus 로고
    • Design considerations for improving the effectiveness of MRP
    • Peterson, L.D., Design considerations for improving the effectiveness of MRP. Prod. Invent. Manage., 1975, 16(3), 48-68.
    • (1975) Prod. Invent. Manage. , vol.16 , Issue.3 , pp. 48-68
    • Peterson, L.D.1
  • 31
    • 0000354915 scopus 로고
    • Resolving uncertainty in manufacturing systems
    • Schmitt, T.G., Resolving uncertainty in manufacturing systems. J. Operat. Manage., 1984, 4(4), 311-345.
    • (1984) J. Operat. Manage. , vol.4 , Issue.4 , pp. 311-345
    • Schmitt, T.G.1
  • 32
  • 33
    • 0025399203 scopus 로고
    • Master production scheduling make-to-stock products: A framework for analysis
    • Sridharan, V. and Berry, W.L., Master production scheduling make-to-stock products: a framework for analysis. Int. J. Prod. Res., 1990, 28(3), 541-558.
    • (1990) Int. J. Prod. Res. , vol.28 , Issue.3 , pp. 541-558
    • Sridharan, V.1    Berry, W.L.2
  • 35
    • 84989412809 scopus 로고
    • Material requirements planning under certainty
    • Whybark, D.C. and Williams, J.G., Material requirements planning under certainty. Decis. Sci., 1976, 7(4), 595-606.
    • (1976) Decis. Sci. , vol.7 , Issue.4 , pp. 595-606
    • Whybark, D.C.1    Williams, J.G.2
  • 36
    • 0027224847 scopus 로고
    • One-machine rescheduling heuristics with efficiency and stability as criteria
    • Wu, S.D., Storer, R.H. and Chang, P., One-machine rescheduling heuristics with efficiency and stability as criteria. Comput. Oper. Res., 1993, 20(1), 1-14.
    • (1993) Comput. Oper. Res. , vol.20 , Issue.1 , pp. 1-14
    • Wu, S.D.1    Storer, R.H.2    Chang, P.3
  • 37
    • 4444312779 scopus 로고    scopus 로고
    • Development of finite capacity material requirement planning system for assembly operations
    • Wuttipornpun, T. and Yenradee, P., Development of finite capacity material requirement planning system for assembly operations. Prod. Plan. Control, 2004, 15(5), 534-549.
    • (2004) Prod. Plan. Control , vol.15 , Issue.5 , pp. 534-549
    • Wuttipornpun, T.1    Yenradee, P.2
  • 38
    • 0022236783 scopus 로고
    • An analysis of scheduling policies in multi-echelon production systems
    • Yano, C. and Carlson, R.C., An analysis of scheduling policies in multi-echelon production systems. IIE Trans., 1985, 17(4), 370-377.
    • (1985) IIE Trans. , vol.17 , Issue.4 , pp. 370-377
    • Yano, C.1    Carlson, R.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.