Volumn 46-47, Issue , 1996, Pages 127-136

Formulas of MRP

Author keywords

Inventory inefficiency; Materials requirement planning (MRP); Multilevel production control; Rescheduling

Indexed keywords

COMPUTER AIDED MANUFACTURING; INDUSTRIAL ECONOMICS; PRODUCTION CONTROL; SCHEDULING; STRATEGIC PLANNING;

EID: 0030395620     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/0925-5273(95)00163-8     Document Type: Article
Times cited : (25)

References (29)
  • 5
    • 0002893786 scopus 로고
    • The use of mathematics in production and inventory control
    • Vazsonyi, A., 1955. The use of mathematics in production and inventory control. Management Science, 1(1): 70-85.
    • (1955) Management Science , vol.1 , Issue.1 , pp. 70-85
    • Vazsonyi, A.1
  • 8
    • 0020832935 scopus 로고
    • Mathematical programming approaches to capacity-constrained MRP systems: Review, formulation and problem reduction
    • Billington, P.J., McClain, J.O. and Thomas, L.J., 1983. Mathematical programming approaches to capacity-constrained MRP systems: review, formulation and problem reduction. Mgmt. Sci., 29: 1126-1141.
    • (1983) Mgmt. Sci. , vol.29 , pp. 1126-1141
    • Billington, P.J.1    McClain, J.O.2    Thomas, L.J.3
  • 9
    • 0023146986 scopus 로고
    • The application of discrete linear control theory to the analysis and simulation of multi-product, multi-level production control systems
    • Bonney, M.C. and Popplewell, 1987. The application of discrete linear control theory to the analysis and simulation of multi-product, multi-level production control systems, Int. J. Prod. Res., 25: 45-56.
    • (1987) Int. J. Prod. Res. , vol.25 , pp. 45-56
    • Bonney, M.C.1
  • 10
    • 28144462443 scopus 로고
    • The application of discrete linear control theory to the analysis and simulation of multi-product, multi-level production control systems
    • Bonney, M.C. and Popplewell, 1988. The application of discrete linear control theory to the analysis and simulation of multi-product, multi-level production control systems. Eng. Costs Prod. Econom., 15: 169-173.
    • (1988) Eng. Costs Prod. Econom. , vol.15 , pp. 169-173
    • Bonney, M.C.1
  • 12
    • 0026819457 scopus 로고
    • Intertemporal generalization of the relationship between material requirements planning and input-output analysis
    • Grubbström, R.W. and Ovrin, P., 1992. Intertemporal generalization of the relationship between material requirements planning and input-output analysis. Int. J. Prod. Econom., 26: 311-318.
    • (1992) Int. J. Prod. Econom. , vol.26 , pp. 311-318
    • Grubbström, R.W.1    Ovrin, P.2
  • 13
    • 0028444293 scopus 로고
    • Further theoretical considerations on the dynamic relationship between MRP, input-output analysis and multi-echelon inventory systems
    • Grubbström, R.W. and Molinder, A., 1994a. Further theoretical considerations on the dynamic relationship between MRP, input-output analysis and multi-echelon inventory systems. Int. J. Prod. Res., 35: 299-231.
    • (1994) Int. J. Prod. Res. , vol.35 , pp. 299-1231
    • Grubbström, R.W.1    Molinder, A.2
  • 16
    • 30244447218 scopus 로고
    • Material and Capacity Requirements Planning
    • American Production and Inventory Control Society
    • St. John, R.E., 1993. Material and Capacity Requirements Planning. Certification Review Course, American Production and Inventory Control Society.
    • (1993) Certification Review Course
    • St John, R.E.1
  • 19
    • 0018517735 scopus 로고
    • Use of dynamic lot-sizing to avoid nervousness in material requirements planning systems
    • Carlson, R.C, Jucker, J. V. and Kropp, D.H., 1979. Use of dynamic lot-sizing to avoid nervousness in material requirements planning systems, Prod. Inv. Mgmt., 20(3): 49-58.
    • (1979) Prod. Inv. Mgmt. , vol.20 , Issue.3 , pp. 49-58
    • Carlson, R.C.1    Jucker, J.V.2    Kropp, D.H.3
  • 20
    • 0023404035 scopus 로고
    • Freezing the master production schedule under rolling planning horizons
    • Sridharan, V., Berry, W.L. and Udayabhanu, V., 1987. Freezing the master production schedule under rolling planning horizons. Management Science, 33(9): 1137-1149.
    • (1987) Management Science , vol.33 , Issue.9 , pp. 1137-1149
    • Sridharan, V.1    Berry, W.L.2    Udayabhanu, V.3
  • 21
    • 24744471045 scopus 로고    scopus 로고
    • Cover-time planning, a method for calculation of material requirements
    • Segerstedt, A., 1996, Cover-time planning, a method for calculation of material requirements. Int. J. Prod. Econom., 41: 355-368.
    • (1996) Int. J. Prod. Econom. , vol.41 , pp. 355-368
    • Segerstedt, A.1
  • 22
    • 0343377350 scopus 로고
    • Ph.D. Dissertation, Eindhoven University of Technology, The Netherlands
    • van Donselaar, Karel, 1989. Material coordination under uncertainty, Ph.D. Dissertation, Eindhoven University of Technology, The Netherlands.
    • (1989) Material Coordination under Uncertainty
    • Van Donselaar, K.1
  • 23
    • 0000227864 scopus 로고
    • A 98%-effective lot-sizing rule for a multi-product, multi-stage production/inventory system
    • Roundy, R.O., 1986. A 98%-effective lot-sizing rule for a multi-product, multi-stage production/inventory system. Math. Oper. Res., 11: 699-727.
    • (1986) Math. Oper. Res. , vol.11 , pp. 699-727
    • Roundy, R.O.1
  • 24
    • 0000293722 scopus 로고
    • Installation vs. echelon stock policies for multi-level inventory control
    • Axsäter, S. and Rosling, K., 1993. Installation vs. echelon stock policies for multi-level inventory control. Mgmt. Sci., 39: 1274-1280.
    • (1993) Mgmt. Sci. , vol.39 , pp. 1274-1280
    • Axsäter, S.1    Rosling, K.2
  • 25
    • 0021482112 scopus 로고
    • On the imbalance of inventories in multi-echelon systems
    • Zipkin, P., 1984. On the imbalance of inventories in multi-echelon systems. Math. Oper. Res., 9: 402-423.
    • (1984) Math. Oper. Res. , vol.9 , pp. 402-423
    • Zipkin, P.1
  • 26
    • 0002507193 scopus 로고
    • Centralized ordering policies in a multi-warehouse system with lead times and random demand
    • North-Holland, Amsterdam
    • Eppen, G. and Schrage, L., 1981, Centralized ordering policies in a multi-warehouse system with lead times and random demand, in: TIMS Studies in the Management Sciences, Vol. 16. North-Holland, Amsterdam.
    • (1981) TIMS Studies in the Management Sciences , vol.16
    • Eppen, G.1    Schrage, L.2
  • 27
    • 0347495175 scopus 로고
    • What is wrong with materials requirement planning?
    • October
    • Burbidge, J., 1980. What is wrong with materials requirement planning? Prod. Eng., October.
    • (1980) Prod. Eng.
    • Burbidge, J.1
  • 28
    • 0041470371 scopus 로고
    • Cover-time planning - An alternative to MRP
    • Production Economic Research in Linköping, Linköping
    • Segerstedt, A., 1991. Cover-Time Planning - An alternative to MRP. PROFIL 10, Production Economic Research in Linköping, Linköping.
    • (1991) PROFIL , vol.10
    • Segerstedt, A.1
  • 29
    • 0011586806 scopus 로고
    • Multi-level production and inventory control problems - Related to MRP and cover-time planning
    • Production Economic Research in Linköping, Linköping
    • Segerstedt, A., 1995a. Multi-level production and inventory control problems - related to MRP and cover-time planning. PROFIL 13, Production Economic Research in Linköping, Linköping.
    • (1995) PROFIL , vol.13
    • Segerstedt, A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.