메뉴 건너뛰기




Volumn 31, Issue 10, 2000, Pages 803-814

Scheduling of linear projects with single loop structures

Author keywords

[No Author keywords available]

Indexed keywords

DYNAMIC PROGRAMMING; LINEAR PROGRAMMING; PRODUCTION ENGINEERING;

EID: 0343878238     PISSN: 09659978     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0965-9978(99)00062-9     Document Type: Article
Times cited : (5)

References (11)
  • 1
    • 84930116614 scopus 로고
    • Al Sarraj Z.M. Discussion of formal development of line-of-balance technique
    • Vorster M.C., Bafna T. Al Sarraj Z.M. Discussion of formal development of line-of-balance technique. J Constr Engng Mgmt, ASCE. 118:(1):1992;210-211.
    • (1992) J Constr Engng Mgmt, ASCE , vol.118 , Issue.1 , pp. 210-211
    • Vorster, M.C.1    Bafna, T.2
  • 2
    • 0027866760 scopus 로고
    • Scheduling of repetitive projects with cost optimization
    • Moselhi O.S., El-Rayes Y.M. Scheduling of repetitive projects with cost optimization. J Constr Engng Mgmt, ASCE. 119:(4):1993;681-697.
    • (1993) J Constr Engng Mgmt, ASCE , vol.119 , Issue.4 , pp. 681-697
    • Moselhi, O.S.1    El-Rayes, Y.M.2
  • 3
    • 0025447970 scopus 로고
    • RPM: Repetitive project modeling
    • Reda R.M. RPM: Repetitive project modeling. J Constr Div, ASCE. 116:(2):1990;316-330.
    • (1990) J Constr Div, ASCE , vol.116 , Issue.2 , pp. 316-330
    • Reda, R.M.1
  • 4
    • 0000981977 scopus 로고
    • Planning construction of repetitive building units
    • Carr R.I., Meyer W.L. Planning construction of repetitive building units. J Constr Div, ASCE. 100:(3):1974;403-412.
    • (1974) J Constr Div, ASCE , vol.100 , Issue.3 , pp. 403-412
    • Carr, R.I.1    Meyer, W.L.2
  • 5
    • 0022778511 scopus 로고
    • Line-of-balance scheduling in pavement construction
    • Arditi D., Albulak Z.M. Line-of-balance scheduling in pavement construction. J Constr Div, ASCE. 112:(3):1986;411-424.
    • (1986) J Constr Div, ASCE , vol.112 , Issue.3 , pp. 411-424
    • Arditi, D.1    Albulak, Z.M.2
  • 6
    • 0016643558 scopus 로고
    • VPM scheduling for high-rise buildings
    • O'Brien J.I. VPM scheduling for high-rise buildings. J Constr Div, ASCE. 101:(4):1975;895-905.
    • (1975) J Constr Div, ASCE , vol.101 , Issue.4 , pp. 895-905
    • O'Brien, J.I.1
  • 7
    • 0019030431 scopus 로고
    • Construction planning for linear projects
    • Selinger S. Construction planning for linear projects. J Constr Div, ASCE. 106:(2):1980;195-205.
    • (1980) J Constr Div, ASCE , vol.106 , Issue.2 , pp. 195-205
    • Selinger, S.1
  • 8
    • 0023984188 scopus 로고
    • Extensions to linear scheduling optimization
    • Russell A.D., Caselton W.F. Extensions to linear scheduling optimization. J Constr Div, ASCE. 114:(1):1988;36-52.
    • (1988) J Constr Div, ASCE , vol.114 , Issue.1 , pp. 36-52
    • Russell, A.D.1    Caselton, W.F.2
  • 9
    • 0028409229 scopus 로고
    • Scheduling and control of linear projects
    • Eldin N.N., Senouci A. Scheduling and control of linear projects. Can J Civil Engng. 21:(2):1994;219-230.
    • (1994) Can J Civil Engng , vol.21 , Issue.2 , pp. 219-230
    • Eldin, N.N.1    Senouci, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.