-
2
-
-
0031236201
-
A branch and bound algorithm for minimizing mean flow time on a single batch processing machine
-
DuPont L, Ghazvini FJ (1997) A branch and bound algorithm for minimizing mean flow time on a single batch processing machine. Int J Ind Eng 4(3):197-203
-
(1997)
Int J Ind Eng
, vol.4
, Issue.3
, pp. 197-203
-
-
Dupont, L.1
Ghazvini, F.J.2
-
3
-
-
0033331613
-
Optimization of cycle time & utilization in semiconductor test manufacturing using simulation-based, on-line near-real-time scheduling system
-
Farington PA, Nembhard HB, Sturrok DT, Evans GW (eds). IEEE, Piscataway, NJ
-
Sivakumar AI (1999) Optimization of cycle time & utilization in semiconductor test manufacturing using simulation-based, on-line near-real-time scheduling system. In: Farington PA, Nembhard HB, Sturrok DT, Evans GW (eds) Proceedings of the 1999 Winter Simulation Conference. IEEE, Piscataway, NJ, pp 727-735
-
(1999)
Proceedings of the 1999 Winter Simulation Conference
, pp. 727-735
-
-
Sivakumar, A.I.1
-
4
-
-
0012258315
-
Multi-objective dynamic scheduling using discrete event simulation
-
Sivakumar AI (2001) Multi-objective dynamic scheduling using discrete event simulation. Int J Comput Integr Manuf 14(2):154-167
-
(2001)
Int J Comput Integr Manuf
, vol.14
, Issue.2
, pp. 154-167
-
-
Sivakumar, A.I.1
-
5
-
-
0028481114
-
Efficient scheduling policies to reduce mean and variance of cycle time in semiconductor manufacturing plants
-
Lu SCH, Ramaswamy D, Kumar PR (1994) Efficient scheduling policies to reduce mean and variance of cycle time in semiconductor manufacturing plants. IEEE Trans Semicond Manuf 7:374-388
-
(1994)
IEEE Trans Semicond Manuf
, vol.7
, pp. 374-388
-
-
Lu, S.C.H.1
Ramaswamy, D.2
Kumar, P.R.3
-
6
-
-
0026253908
-
Production scheduling algorithms for a semiconductor test facility
-
Uzsoy R, Martin-Vega LA, Lee S-Y, Leonard PA (1991) Production scheduling algorithms for a semiconductor test facility. IEEE Trans Semicond Manuf 4(4):270-280
-
(1991)
IEEE Trans Semicond Manuf
, vol.4
, Issue.4
, pp. 270-280
-
-
Uzsoy, R.1
Martin-Vega, L.A.2
Lee, S.-Y.3
Leonard, P.A.4
-
7
-
-
0026841915
-
Scheduling semiconductor test operations: Minimizing maximum lateness and number of tardy jobs on a single machine
-
Uzsoy R, Lee C-Y, Martin-Vega LA (1992) Scheduling semiconductor test operations: minimizing maximum lateness and number of tardy jobs on a single machine. Naval Res Logist 39:369-388
-
(1992)
Naval Res Logist
, vol.39
, pp. 369-388
-
-
Uzsoy, R.1
Lee, C.-Y.2
Martin-Vega, L.A.3
-
8
-
-
0034248849
-
Scheduling flexible flow shops with sequence-dependent setup effects
-
Liu C-Y, Chang S (2000) Scheduling flexible flow shops with sequence-dependent setup effects. IEEE Trans Robot Automat 16(4):408-419
-
(2000)
IEEE Trans Robot Automat
, vol.16
, Issue.4
, pp. 408-419
-
-
Liu, C.-Y.1
Chang, S.2
-
9
-
-
0031374260
-
Efficient simulation/optimization of dispatching priority with fake processing time
-
Andradottir S, Healy KJ, Withers DH, Nelson BL (eds). IEEE, Piscataway, NJ
-
Morito S, Lee KH (1997) Efficient simulation/optimization of dispatching priority with fake processing time. In: Andradottir S, Healy KJ, Withers DH, Nelson BL (eds) Proceedings of the 1997 Winter Simulation Conference. IEEE, Piscataway, NJ, pp 872-879
-
(1997)
Proceedings of the 1997 Winter Simulation Conference
, pp. 872-879
-
-
Morito, S.1
Lee, K.H.2
-
10
-
-
0031371575
-
Creating a flexible, simulation-based finite scheduling tools
-
Andradottir S, Healy KJ, Withers DH, Nelson BL (eds). IEEE, Piscataway, NJ
-
Mazziotti BW, Home RE Jr (1997) Creating a flexible, simulation-based finite scheduling tools. In: Andradottir S, Healy KJ, Withers DH, Nelson BL (eds) Proceedings of the 1997 Winter Simulation Conference. IEEE, Piscataway, NJ, pp 853-858
-
(1997)
Proceedings of the 1997 Winter Simulation Conference
, pp. 853-858
-
-
Mazziotti, B.W.1
Home Jr., R.E.2
-
11
-
-
0002573145
-
Simulation and scheduling
-
Banks J (ed). Wiley, New York
-
Kiran AS (1998) Simulation and scheduling. In: Banks J (ed) Handbook of simulation. Wiley, New York, pp 677-717
-
(1998)
Handbook of Simulation
, pp. 677-717
-
-
Kiran, A.S.1
-
16
-
-
0012257349
-
Approaches to multi-objective scheduling optimization in semiconductor back-end
-
Tempe, Arizona, 10-12 April 2002
-
Gupta AK, Sivakumar AI (2002) Approaches to multi-objective scheduling optimization in semiconductor back-end. In: Proceedings of International Conference on Modeling and Analysis of Semiconductor Manufacturing (MASM), Tempe, Arizona, 10-12 April 2002, pp 223-228
-
(2002)
Proceedings of International Conference on Modeling and Analysis of Semiconductor Manufacturing (MASM)
, pp. 223-228
-
-
Gupta, A.K.1
Sivakumar, A.I.2
|