메뉴 건너뛰기




Volumn 26, Issue 9-10, 2005, Pages 950-958

Single machine scheduling with multiple objectives in semiconductor manufacturing

Author keywords

Multiple objectives; Scheduling; Sequence dependent setup times; Single machine

Indexed keywords

COMPETITION; COMPUTER SIMULATION; LOGISTICS; MATHEMATICAL MODELS; OPERATIONS RESEARCH; SCHEDULING;

EID: 27544509423     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-004-2074-y     Document Type: Article
Times cited : (18)

References (16)
  • 2
    • 0031236201 scopus 로고    scopus 로고
    • A branch and bound algorithm for minimizing mean flow time on a single batch processing machine
    • DuPont L, Ghazvini FJ (1997) A branch and bound algorithm for minimizing mean flow time on a single batch processing machine. Int J Ind Eng 4(3):197-203
    • (1997) Int J Ind Eng , vol.4 , Issue.3 , pp. 197-203
    • Dupont, L.1    Ghazvini, F.J.2
  • 3
    • 0033331613 scopus 로고    scopus 로고
    • Optimization of cycle time & utilization in semiconductor test manufacturing using simulation-based, on-line near-real-time scheduling system
    • Farington PA, Nembhard HB, Sturrok DT, Evans GW (eds). IEEE, Piscataway, NJ
    • Sivakumar AI (1999) Optimization of cycle time & utilization in semiconductor test manufacturing using simulation-based, on-line near-real-time scheduling system. In: Farington PA, Nembhard HB, Sturrok DT, Evans GW (eds) Proceedings of the 1999 Winter Simulation Conference. IEEE, Piscataway, NJ, pp 727-735
    • (1999) Proceedings of the 1999 Winter Simulation Conference , pp. 727-735
    • Sivakumar, A.I.1
  • 4
    • 0012258315 scopus 로고    scopus 로고
    • Multi-objective dynamic scheduling using discrete event simulation
    • Sivakumar AI (2001) Multi-objective dynamic scheduling using discrete event simulation. Int J Comput Integr Manuf 14(2):154-167
    • (2001) Int J Comput Integr Manuf , vol.14 , Issue.2 , pp. 154-167
    • Sivakumar, A.I.1
  • 5
    • 0028481114 scopus 로고
    • Efficient scheduling policies to reduce mean and variance of cycle time in semiconductor manufacturing plants
    • Lu SCH, Ramaswamy D, Kumar PR (1994) Efficient scheduling policies to reduce mean and variance of cycle time in semiconductor manufacturing plants. IEEE Trans Semicond Manuf 7:374-388
    • (1994) IEEE Trans Semicond Manuf , vol.7 , pp. 374-388
    • Lu, S.C.H.1    Ramaswamy, D.2    Kumar, P.R.3
  • 7
    • 0026841915 scopus 로고
    • Scheduling semiconductor test operations: Minimizing maximum lateness and number of tardy jobs on a single machine
    • Uzsoy R, Lee C-Y, Martin-Vega LA (1992) Scheduling semiconductor test operations: minimizing maximum lateness and number of tardy jobs on a single machine. Naval Res Logist 39:369-388
    • (1992) Naval Res Logist , vol.39 , pp. 369-388
    • Uzsoy, R.1    Lee, C.-Y.2    Martin-Vega, L.A.3
  • 8
    • 0034248849 scopus 로고    scopus 로고
    • Scheduling flexible flow shops with sequence-dependent setup effects
    • Liu C-Y, Chang S (2000) Scheduling flexible flow shops with sequence-dependent setup effects. IEEE Trans Robot Automat 16(4):408-419
    • (2000) IEEE Trans Robot Automat , vol.16 , Issue.4 , pp. 408-419
    • Liu, C.-Y.1    Chang, S.2
  • 9
    • 0031374260 scopus 로고    scopus 로고
    • Efficient simulation/optimization of dispatching priority with fake processing time
    • Andradottir S, Healy KJ, Withers DH, Nelson BL (eds). IEEE, Piscataway, NJ
    • Morito S, Lee KH (1997) Efficient simulation/optimization of dispatching priority with fake processing time. In: Andradottir S, Healy KJ, Withers DH, Nelson BL (eds) Proceedings of the 1997 Winter Simulation Conference. IEEE, Piscataway, NJ, pp 872-879
    • (1997) Proceedings of the 1997 Winter Simulation Conference , pp. 872-879
    • Morito, S.1    Lee, K.H.2
  • 10
    • 0031371575 scopus 로고    scopus 로고
    • Creating a flexible, simulation-based finite scheduling tools
    • Andradottir S, Healy KJ, Withers DH, Nelson BL (eds). IEEE, Piscataway, NJ
    • Mazziotti BW, Home RE Jr (1997) Creating a flexible, simulation-based finite scheduling tools. In: Andradottir S, Healy KJ, Withers DH, Nelson BL (eds) Proceedings of the 1997 Winter Simulation Conference. IEEE, Piscataway, NJ, pp 853-858
    • (1997) Proceedings of the 1997 Winter Simulation Conference , pp. 853-858
    • Mazziotti, B.W.1    Home Jr., R.E.2
  • 11
    • 0002573145 scopus 로고    scopus 로고
    • Simulation and scheduling
    • Banks J (ed). Wiley, New York
    • Kiran AS (1998) Simulation and scheduling. In: Banks J (ed) Handbook of simulation. Wiley, New York, pp 677-717
    • (1998) Handbook of Simulation , pp. 677-717
    • Kiran, A.S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.