-
1
-
-
0032443062
-
Future disassembly and recycling technology. Results of a Delphi study
-
Boks, C. and Templemon, E. (1998), "Future disassembly and recycling technology. Results of a Delphi study", Futures, Vol. 30 No. 5, pp. 425-42.
-
(1998)
Futures
, vol.30
, Issue.5
, pp. 425-442
-
-
Boks, C.1
Templemon, E.2
-
2
-
-
21844513640
-
Operations planning issues in an assembly/disassembly environment
-
Brennan, L., Gupta, S.M. and Taleb, K.N. (1994), "Operations planning issues in an assembly/disassembly environment", International Journal of Operations & Production Management, Vol. 14 No. 9, pp. 57-67.
-
(1994)
International Journal of Operations & Production Management
, vol.14
, Issue.9
, pp. 57-67
-
-
Brennan, L.1
Gupta, S.M.2
Taleb, K.N.3
-
3
-
-
21344494294
-
The recovery problem in production design
-
Chandra, N-D. (1994), "The recovery problem in production design", Journal of Engineering Design, Vol. 5 No. 1, pp. 65-86.
-
(1994)
Journal of Engineering Design
, vol.5
, Issue.1
, pp. 65-86
-
-
Chandra, N.-D.1
-
4
-
-
0029356018
-
Disassembly and recycling of electronic consumer products: An overview
-
de Ron, A. and Penev, K. (1995), "Disassembly and recycling of electronic consumer products: an overview", Technovation, Vol. 15 No. 6, pp. 363-74.
-
(1995)
Technovation
, vol.15
, Issue.6
, pp. 363-374
-
-
De Ron, A.1
Penev, K.2
-
5
-
-
0032651825
-
Innovative disassembly strategies based on flexible partial destructive tools
-
Feldmann, K., Traunter, S. and Meedt, O. (1999), "Innovative disassembly strategies based on flexible partial destructive tools", Annual Reviews in Control, Vol. 23, pp. 159-64.
-
(1999)
Annual Reviews in Control
, vol.23
, pp. 159-164
-
-
Feldmann, K.1
Traunter, S.2
Meedt, O.3
-
6
-
-
0001237039
-
Product modularization for life cycle engineering
-
Gu, P. and Sosale, S. (1999), "Product modularization for life cycle engineering", Robotics and Computer Integrated Manufacturing, Vol. 15, pp. 387-401.
-
(1999)
Robotics and Computer Integrated Manufacturing
, vol.15
, pp. 387-401
-
-
Gu, P.1
Sosale, S.2
-
7
-
-
0031247813
-
An evaluation methodology for disassembly process
-
Gungor, A. and Gupta, S. (1997), "An evaluation methodology for disassembly process", Computers and Industrial Engineering, Vol. 33 Nos 1/2, pp. 329-32.
-
(1997)
Computers and Industrial Engineering
, vol.33
, Issue.12
, pp. 329-332
-
-
Gungor, A.1
Gupta, S.2
-
8
-
-
0033358107
-
Issues in environmentally conscious manufacturing and product recovery: A survey
-
Gungor, A. and Gupta, S. (1999), "Issues in environmentally conscious manufacturing and product recovery: a survey", Computers and Industrial Engineering, Vol. 36, pp. 811-53.
-
(1999)
Computers and Industrial Engineering
, vol.36
, pp. 811-853
-
-
Gungor, A.1
Gupta, S.2
-
9
-
-
0031651509
-
On a medium term recovery and disposal strategy for durable assembly products
-
Krikke, H.R., Harten, A. and Schuur, P.C. (1998), "On a medium term recovery and disposal strategy for durable assembly products", International Journal of Production Research, Vol. 36 No. 1, pp. 1-139.
-
(1998)
International Journal of Production Research
, vol.36
, Issue.1
, pp. 1-139
-
-
Krikke, H.R.1
Harten, A.2
Schuur, P.C.3
-
10
-
-
0002840613
-
Systematic integration of design-for-recycling into product design
-
Kriwet, A., Zussman, E. and Seliger, G. (1995), "Systematic integration of design-for-recycling into product design", International Journal of Production Economics, Vol. 38, pp. 15-22.
-
(1995)
International Journal of Production Economics
, vol.38
, pp. 15-22
-
-
Kriwet, A.1
Zussman, E.2
Seliger, G.3
-
11
-
-
0032643684
-
Disassembly analysis through time estimation and other metrics
-
Kroll, E. and Carver, B. (1999), "Disassembly analysis through time estimation and other metrics", Robotics and Computer Integrated Manufacturing, Vol. 15, pp. 191-200.
-
(1999)
Robotics and Computer Integrated Manufacturing
, vol.15
, pp. 191-200
-
-
Kroll, E.1
Carver, B.2
-
12
-
-
0035545584
-
Design for manufacture and design for 'X': Concepts, applications and perspectives
-
Kuo, T.C., Huang, S.H. and Zhang, H-C. (2001), "Design for manufacture and design for 'X': concepts, applications and perspectives", Computers and Industrial Engineering, Vol. 41, pp. 241-60.
-
(2001)
Computers and Industrial Engineering
, vol.41
, pp. 241-260
-
-
Kuo, T.C.1
Huang, S.H.2
Zhang, H.-C.3
-
13
-
-
0033358055
-
Linear programming in disassembly/clustering sequence generation
-
Lambert, A.J.D. (1999), "Linear programming in disassembly/ clustering sequence generation", Computers and Industrial Engineering, Vol. 36, pp. 723-38.
-
(1999)
Computers and Industrial Engineering
, vol.36
, pp. 723-738
-
-
Lambert, A.J.D.1
-
14
-
-
0034802440
-
A multi-objective methodology for evaluating product end-of-life options and disassembly
-
Lee, S.G., Lye, S.W. and Khoo, M.K. (2001), "A multi-objective methodology for evaluating product end-of-life options and disassembly", The International Journal of Advanced Manufacturing Technology, Vol. 18, pp. 148-56.
-
(2001)
The International Journal of Advanced Manufacturing Technology
, vol.18
, pp. 148-156
-
-
Lee, S.G.1
Lye, S.W.2
Khoo, M.K.3
-
15
-
-
0004115640
-
-
McGraw-Hill New York, NY
-
Maynard, H.B., Stegmerten, G.J. and Schwab, J.L. (1948), Methods - Time Measurement, McGraw-Hill, New York, NY.
-
(1948)
Methods - Time Measurement
-
-
Maynard, H.B.1
Stegmerten, G.J.2
Schwab, J.L.3
-
16
-
-
0031386398
-
Disassemblability of mechanical parts in automobiles for recycling
-
Mok, H.S., Kim, H.J. and Moon, K.S. (1997), "Disassemblability of mechanical parts in automobiles for recycling", Computers and Industrial Engineering, Vol. 33 Nos 3/4, pp. 621-4.
-
(1997)
Computers and Industrial Engineering
, vol.33
, Issue.34
, pp. 621-624
-
-
Mok, H.S.1
Kim, H.J.2
Moon, K.S.3
-
17
-
-
0032633128
-
Automatic subassembly detection from a product model for disassembly sequence generation
-
Ong, N.S. and Wong, Y.C. (1999), "Automatic subassembly detection from a product model for disassembly sequence generation", The International Journal of Advanced Manufacturing Technology, Vol. 15, pp. 425-31.
-
(1999)
The International Journal of Advanced Manufacturing Technology
, vol.15
, pp. 425-431
-
-
Ong, N.S.1
Wong, Y.C.2
-
18
-
-
0030085256
-
Determination of a disassembly strategy
-
Penev, K.D. and De Ron, A.J. (1994), "Determination of a disassembly strategy", International Journal of Production Research, Vol. 34 No. 2, pp. 495-506.
-
(1994)
International Journal of Production Research
, vol.34
, Issue.2
, pp. 495-506
-
-
Penev, K.D.1
De Ron, A.J.2
-
19
-
-
0032668519
-
Application of a design-for-remanufacture framework to the selection of product life-cycle fastening and joining methods
-
Shu, L.H. and Flowers, W. (1999), "Application of a design-for-remanufacture framework to the selection of product life-cycle fastening and joining methods", Robotics and Computer Integrated Manufacturing, Vol. 15, pp. 179-90.
-
(1999)
Robotics and Computer Integrated Manufacturing
, vol.15
, pp. 179-190
-
-
Shu, L.H.1
Flowers, W.2
-
20
-
-
0033309431
-
-
Shyamsundar, N. and Gadh, R. (1999), "Geometric abstractions to support disassembly analysis", Vol. 31 No. 10, pp. 935-46.
-
(1999)
Geometric Abstractions to Support Disassembly Analysis
, vol.31
, Issue.10
, pp. 935-946
-
-
Shyamsundar, N.1
Gadh, R.2
-
21
-
-
0000098669
-
A geometric algorithm for single selective disassembly using the wave propagation abstraction
-
Srinivasan, H. and Gadh, R. (1998), "A geometric algorithm for single selective disassembly using the wave propagation abstraction", Computer-Aided Design, Vol. 30 No. 8, pp. 603-13.
-
(1998)
Computer-Aided Design
, vol.30
, Issue.8
, pp. 603-613
-
-
Srinivasan, H.1
Gadh, R.2
-
22
-
-
0036532846
-
A non-interfering selective disassembly sequence for components with geometric constraints
-
Srinivasan, H. and Gadh, R. (2002), "A non-interfering selective disassembly sequence for components with geometric constraints", IIE Transactions, Vol. 34 No. 4, pp. 349-61.
-
(2002)
IIE Transactions
, vol.34
, Issue.4
, pp. 349-361
-
-
Srinivasan, H.1
Gadh, R.2
-
23
-
-
0032642458
-
Selective disassembly for virtual prototyping as applied to de-manufacturing
-
Srinivasan, H., Figueroa, R. and Gadh, R. (1999), "Selective disassembly for virtual prototyping as applied to de-manufacturing", Robotics and Computer-Integrated Manufacturing, Vol. 15 No. 3, pp. 231-45.
-
(1999)
Robotics and Computer-Integrated Manufacturing
, vol.15
, Issue.3
, pp. 231-245
-
-
Srinivasan, H.1
Figueroa, R.2
Gadh, R.3
-
24
-
-
84968082184
-
Strategic issues in product recovery management
-
Thierry, M., Salomon, M., Van Nunen, J. and Van Wassenhowe, L. (1995), "Strategic issues in product recovery management", California Management Review, Vol. 37 No. 2, pp. 114-35.
-
(1995)
California Management Review
, vol.37
, Issue.2
, pp. 114-135
-
-
Thierry, M.1
Salomon, M.2
Van Nunen, J.3
Van Wassenhowe, L.4
-
25
-
-
0001378506
-
Environmentally conscious design and manufacturing: A state-of-the-art survey
-
Zhang, H.C., Kuo, T.C., Lu, H. and Huang, S. (1997), " Environmentally conscious design and manufacturing: a state-of-the-art survey", Journal of Manufacturing Systems, Vol. 16 No. 5, pp. 352-71.
-
(1997)
Journal of Manufacturing Systems
, vol.16
, Issue.5
, pp. 352-371
-
-
Zhang, H.C.1
Kuo, T.C.2
Lu, H.3
Huang, S.4
-
26
-
-
0028058444
-
Disassembly-oriented assessment methodology to support design for recycling
-
Zussman, E., Kriwet, A. and Seliger, G. (1994), "Disassembly- oriented assessment methodology to support design for recycling", Annals of the CIRP, Vol. 43 No. 1, pp. 9-14.
-
(1994)
Annals of the CIRP
, vol.43
, Issue.1
, pp. 9-14
-
-
Zussman, E.1
Kriwet, A.2
Seliger, G.3
|