-
1
-
-
0023438349
-
Evidential support logic programming
-
Baldwin, J. F. (1986). Evidential support logic programming. Fuzzy Sets and Systems, 24(1), 1-26.
-
(1986)
Fuzzy Sets and Systems
, vol.24
, Issue.1
, pp. 1-26
-
-
Baldwin, J.F.1
-
3
-
-
0012297432
-
Mapping the process of problem reformulation, implications for understanding strategic thought
-
Huff, A. S. (Ed.), Wiley, Chichester
-
Boland, R. Greenberg, R., Park, S. and Han, I. (1990). Mapping the process of problem reformulation, implications for understanding strategic thought. In: Huff, A. S. (Ed.), Mapping Strategic Thought. Wiley, Chichester.
-
(1990)
Mapping Strategic Thought
-
-
Boland, R.1
Greenberg, R.2
Park, S.3
Han, I.4
-
4
-
-
0023314767
-
Uncertainty analysis in expert systems
-
Blockley, D. I. (1987). Uncertainty analysis in expert systems. Civil Engineering Systems, 4, 3-6.
-
(1987)
Civil Engineering Systems
, vol.4
, pp. 3-6
-
-
Blockley, D.I.1
-
5
-
-
0023330690
-
Uncertain inference in knowledge-based systems
-
ASCE
-
Blockley, D. I. and Baldwin, J. F. (1987). Uncertain inference in knowledge-based systems. J. Engrg. Mech., ASCE,113(4), 467-481.
-
(1987)
J. Engrg. Mech.
, vol.113
, Issue.4
, pp. 467-481
-
-
Blockley, D.I.1
Baldwin, J.F.2
-
6
-
-
0033350970
-
Risk based structural safety methods in context
-
Blockley, D. I. (1999a). Risk based structural safety methods in context. Structural Safety, 21, 335-348.
-
(1999)
Structural Safety
, vol.21
, pp. 335-348
-
-
Blockley, D.I.1
-
7
-
-
0033389424
-
Process modelling from reflective practice for engineering quality
-
Blockley, D. I. (1999b). Process modelling from reflective practice for engineering quality. Civil Eng. and Env. Syst., 16, 287-313.
-
(1999)
Civil Eng. and Env. Syst.
, vol.16
, pp. 287-313
-
-
Blockley, D.I.1
-
10
-
-
0034536312
-
Multiobjective methodology for highway safety resource allocation
-
Chowdhury, M. A., Garber, N. J. and Li, D. (2000). Multiobjective methodology for highway safety resource allocation. J. Infrastructure Syst., ASCE, 6(4), 138-144.
-
(2000)
J. Infrastructure Syst., ASCE
, vol.6
, Issue.4
, pp. 138-144
-
-
Chowdhury, M.A.1
Garber, N.J.2
Li, D.3
-
11
-
-
84954952688
-
A state of the art review of IDEF-0
-
Colquhoun, G. J., Baines, R. W. and Crossley, R. A. (1993). A state of the art review of IDEF-0. Int. J. Computer Integrated Manufacturing, 6(4 ), 252.
-
(1993)
Int. J. Computer Integrated Manufacturing
, vol.6
, Issue.4
, pp. 252
-
-
Colquhoun, G.J.1
Baines, R.W.2
Crossley, R.A.3
-
12
-
-
4644250673
-
-
NIST Special Publication SP963, Gaithersburg, MD
-
Crandall, J. H. and Freeborne, W. (2001). Performance-based damage assessment and design verification of U.S. housing in extreme earthquake and hurricane events. NIST Special Publication SP963, Gaithersburg, MD, 343-362.
-
(2001)
Performance-Based Damage Assessment and Design Verification of U.S. Housing in Extreme Earthquake and Hurricane Events
, pp. 343-362
-
-
Crandall, J.H.1
Freeborne, W.2
-
13
-
-
0025445632
-
Interval probability theory for evidential support
-
Cui, W. C. and Blockley, D. I. (1990). Interval probability theory for evidential support. Int. J. Intelligent Systems, 5, 183-192.
-
(1990)
Int. J. Intelligent Systems
, vol.5
, pp. 183-192
-
-
Cui, W.C.1
Blockley, D.I.2
-
14
-
-
4644245668
-
Assembling uncertain evidence for decision-making
-
Balkema, Rotterdam
-
Davis, J. P. and Hall, J. W. (1998). Assembling uncertain evidence for decision-making. Proc. 3rd Int. Conf. on Hydroinformatics, Balkema, Rotterdam, 1089-1094.
-
(1998)
Proc. 3rd Int. Conf. on Hydroinformatics
, pp. 1089-1094
-
-
Davis, J.P.1
Hall, J.W.2
-
15
-
-
0141967307
-
Improved condition characterisation of coastal defences
-
Thomas Telford, London
-
Dawson, R. J. and Hall, J. W. (2001). Improved condition characterisation of coastal defences. Proc., Coastlines, Structures and Breakwaters 2001. Thomas Telford, London.
-
(2001)
Proc., Coastlines, Structures and Breakwaters 2001
-
-
Dawson, R.J.1
Hall, J.W.2
-
17
-
-
0001906541
-
Random sets and fuzzy interval analysis
-
Dubois, D. and Prade, H. (1991). Random sets and fuzzy interval analysis. Fuzzy Sets and Systems, 42, 87-101.
-
(1991)
Fuzzy Sets and Systems
, vol.42
, pp. 87-101
-
-
Dubois, D.1
Prade, H.2
-
18
-
-
0034283049
-
Infrastructure risk analysis model
-
ASCE
-
Ezell, B. C., Farr, J. V. and Wiese, I. (2000a). Infrastructure risk analysis model. J. Infrastructure Syst., ASCE, 6(3), 114-117.
-
(2000)
J. Infrastructure Syst.
, vol.6
, Issue.3
, pp. 114-117
-
-
Ezell, B.C.1
Farr, J.V.2
Wiese, I.3
-
19
-
-
0034283429
-
Infrastructure risk analysis of municipal water distribution system
-
Ezell, B. C., Farr, J. V. and Wiese, I. (2000b). Infrastructure risk analysis of municipal water distribution system. J. Infrastructure Syst., ASCE, 6(3), 118-122.
-
(2000)
J. Infrastructure Syst., ASCE
, vol.6
, Issue.3
, pp. 118-122
-
-
Ezell, B.C.1
Farr, J.V.2
Wiese, I.3
-
21
-
-
0141932618
-
-
PR 033/1/ST, Environment Agency, Bristol
-
Glennier, E. B., Timbrell, P. and Cole, J. A. (1991). Manual of condition assessment for flood defences. PR 033/1/ST, Environment Agency, Bristol.
-
(1991)
Manual of Condition Assessment for Flood Defences
-
-
Glennier, E.B.1
Timbrell, P.2
Cole, J.A.3
-
23
-
-
0035281847
-
Leontief-based model of risk in complex interconnected infrastructures
-
ASCE
-
Haimes, Y. Y. and Jiang, P. (2001). Leontief-based model of risk in complex interconnected infrastructures. J. Infrastructure Syst., ASCE, 7(1), 1-12.
-
(2001)
J. Infrastructure Syst.
, vol.7
, Issue.1
, pp. 1-12
-
-
Haimes, Y.Y.1
Jiang, P.2
-
24
-
-
0001395314
-
Uncertain inference using interval probability theory
-
Hall, J. W., Blockley, D. I. and Davis, J. P. (1998). Uncertain inference using interval probability theory. Int. J. Approximate Reasoning, 19(3-4), 247-264.
-
(1998)
Int. J. Approximate Reasoning
, vol.19
, Issue.3-4
, pp. 247-264
-
-
Hall, J.W.1
Blockley, D.I.2
Davis, J.P.3
-
25
-
-
0346406760
-
Sources and implications of uncertainty for coastal managers in the UK
-
Hall, J. W. and Davis, J. P. (2001). Sources and implications of uncertainty for coastal managers in the UK. Water and Env. Mgt. J., 15(2 ), 103-108.
-
(2001)
Water and Env. Mgt. J.
, vol.15
, Issue.2
, pp. 103-108
-
-
Hall, J.W.1
Davis, J.P.2
-
27
-
-
0035367525
-
MSRP: Model for station rehabilitation and planning
-
ASCE
-
Hastak, M. and Abu-Mallouh, M. M. (2001). MSRP: Model for station rehabilitation and planning. J. Infrastructure Syst., ASCE, 7(2), 58-66.
-
(2001)
J. Infrastructure Syst.
, vol.7
, Issue.2
, pp. 58-66
-
-
Hastak, M.1
Abu-Mallouh, M.M.2
-
28
-
-
0024078867
-
An analysis of four uncertainty calculi
-
IEEE
-
Henkind, S. J. and Harrison, M. C. (1988). An analysis of four uncertainty calculi. Transactions on Systems, Man and Cybernetics, IEEE, 18(5), 700-714.
-
(1988)
Transactions on Systems, Man and Cybernetics
, vol.18
, Issue.5
, pp. 700-714
-
-
Henkind, S.J.1
Harrison, M.C.2
-
29
-
-
4644247426
-
Framework for reforming building regulatory systems with "performance-based" approach - A comparative study of English, New Zealand, Australian and Canadian systems
-
Hirano, Y., Gojo, W. and Omi, T. (2000). Framework for reforming building regulatory systems with "performance-based" approach - A comparative study of English, New Zealand, Australian and Canadian systems. J. Architecture Planning and Environmental Engineering, 531, 221-228.
-
(2000)
J. Architecture Planning and Environmental Engineering
, vol.531
, pp. 221-228
-
-
Hirano, Y.1
Gojo, W.2
Omi, T.3
-
30
-
-
0031379783
-
Multistage heuristic approach for solving infrastructure investment decision problems
-
ASCE
-
Hsieh, T.-Y. and Liu, H.-L. (1997). Multistage heuristic approach for solving infrastructure investment decision problems. J. Infrastructure Syst., ASCE, 3(4), 134-142.
-
(1997)
J. Infrastructure Syst.
, vol.3
, Issue.4
, pp. 134-142
-
-
Hsieh, T.-Y.1
Liu, H.-L.2
-
31
-
-
0003563829
-
-
Construction Industry Research and Information Association, London
-
Hughes, A., Hewlett, H., Samuels, P. G., Morris, M. W., Sayers, P. B. Moffat, I., Harding, A. and Tedd, P. (2000). Risk Management for UK Reservoirs. Construction Industry Research and Information Association, London.
-
(2000)
Risk Management for UK Reservoirs
-
-
Hughes, A.1
Hewlett, H.2
Samuels, P.G.3
Morris, M.W.4
Sayers, P.B.5
Moffat, I.6
Harding, A.7
Tedd, P.8
-
32
-
-
0004155291
-
-
University of Chicago Press, Chicago
-
Jeffrey, R. C. (1983). The Logic of Decision. University of Chicago Press, Chicago.
-
(1983)
The Logic of Decision
-
-
Jeffrey, R.C.1
-
37
-
-
0035447060
-
Reliability-based condition assessment of welded mitre gate structures
-
ASCE
-
McAllister, T. P. and Ellingwood, B. R. (2001). Reliability-based condition assessment of welded mitre gate structures. J. Infrastructure Syst., ASCE, 7(3), 95-106.
-
(2001)
J. Infrastructure Syst.
, vol.7
, Issue.3
, pp. 95-106
-
-
McAllister, T.P.1
Ellingwood, B.R.2
-
38
-
-
0032809326
-
Condition index assessment for the U.S. Army corps of engineers civil works
-
ASCE
-
McKay, D. T., Rens, K. L., Griemann, L. F. and Stecker, J. H. (1999). Condition index assessment for the U.S. Army corps of engineers civil works. J. Infrastructure Syst., ASCE, 5(2), 52-60.
-
(1999)
J. Infrastructure Syst.
, vol.5
, Issue.2
, pp. 52-60
-
-
McKay, D.T.1
Rens, K.L.2
Griemann, L.F.3
Stecker, J.H.4
-
39
-
-
0000110262
-
The structure of "unstructured" decision processes
-
Mintzberg, H., Raisinghani, D. and Théorêt, A. (1976). The structure of "unstructured" decision processes. Administrative Sci. Quarterly, 21, 246-275.
-
(1976)
Administrative Sci. Quarterly
, vol.21
, pp. 246-275
-
-
Mintzberg, H.1
Raisinghani, D.2
Théorêt, A.3
-
40
-
-
4644262440
-
Asset management planning for flood defences
-
NRA National Rivers Authority and Binnie and Partners, Bristol
-
NRA (1993). Asset management planning for flood defences. R&D Note 199, National Rivers Authority and Binnie and Partners, Bristol.
-
(1993)
R and D Note 199
-
-
-
44
-
-
4644317015
-
A programme of risk assessments for flood gates on hydro electric reservoirs
-
Tedd, P. (Ed.), British Dam Society, London
-
Sandlilands, N. M. and Noble, M. (1999). A programme of risk assessments for flood gates on hydro electric reservoirs. In: Tedd, P. (Ed.), The Prospect for Reservoirs in the 21st Century. British Dam Society, London, pp. 27-38.
-
(1999)
The Prospect for Reservoirs in the 21st Century
, pp. 27-38
-
-
Sandlilands, N.M.1
Noble, M.2
-
45
-
-
4644372815
-
-
NIST Special Publication SP963, Gaithersburg, MD
-
Sato, H. and Ogi, K.-I. (2001). Study on performance-based design methods for wind effects on highway bridges. NIST Special Publication SP963, Gaithersburg, MD, 107-114.
-
(2001)
Study on Performance-Based Design Methods for Wind Effects on Highway Bridges
, pp. 107-114
-
-
Sato, H.1
Ogi, K.-I.2
-
47
-
-
4644304001
-
-
SEAOC. Structural Engineers Association of California, Vision 2000 Committee, Sacramento, California
-
SEAOC. 1995. Visioh 2000 - A Framework for Performance Based Design. Structural Engineers Association of California, Vision 2000 Committee, Sacramento, California.
-
(1995)
Visioh 2000 - A Framework for Performance Based Design
-
-
-
51
-
-
4644324325
-
A strategy for the refurbishment of a 1080 MW hydro generation portfolio
-
Institution of Mechanical Engineers, London
-
Smith, J. I. (2000). A strategy for the refurbishment of a 1080 MW hydro generation portfolio. Hydropower Developments: New Projects and Rehabilitation. Institution of Mechanical Engineers, London, pp. 83-90.
-
(2000)
Hydropower Developments: New Projects and Rehabilitation
, pp. 83-90
-
-
Smith, J.I.1
-
52
-
-
0012247192
-
An introduction to the IPSE 2.5 project
-
Long, F. (Ed.), Lecture Notes in Computer Science. Springer Verlag, Berlin
-
Snowdon, R. A. (1990). An introduction to the IPSE 2.5 project. In: Long, F. (Ed.), Software Engineering Environments, Lecture Notes in Computer Science. Springer Verlag, Berlin.
-
(1990)
Software Engineering Environments
-
-
Snowdon, R.A.1
-
53
-
-
0003255122
-
Complexity, calibration and causality in influence diagrams
-
Oliver, R. M. and Smith, J. Q. (Eds.), Wiley, Chichester
-
Speed, T. (1990). Complexity, calibration and causality in influence diagrams. In: Oliver, R. M. and Smith, J. Q. (Eds.), Influence Diagrams, Belief Nets and Decision Analysis. Wiley, Chichester.
-
(1990)
Influence Diagrams, Belief Nets and Decision Analysis
-
-
Speed, T.1
-
54
-
-
0012244846
-
An introduction to process-centred environments
-
Finklestein, A., Kramer, J. and Nuseibeh, B. (Eds.), Research Studies Press, Taunton
-
Warboys, B. C. and Snowdon, R. A. (1998). An introduction to process-centred environments. In: Finklestein, A., Kramer, J. and Nuseibeh, B. (Eds.), Software Process Modelling and Technology. Research Studies Press, Taunton.
-
(1998)
Software Process Modelling and Technology
-
-
Warboys, B.C.1
Snowdon, R.A.2
-
56
-
-
49349133217
-
Fuzzy sets as a basis for a theory of possibility
-
Zadeh, L. A. (1978). Fuzzy sets as a basis for a theory of possibility.
-
(1978)
Fuzzy Sets and Systems
, vol.1
, pp. 2-28
-
-
Zadeh, L.A.1
|