메뉴 건너뛰기




Volumn 5, Issue 2, 1999, Pages 52-60

Condition index assessment for U.S. Army Corps of Engineers civil works

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; CIVIL ENGINEERING; INSPECTION; MAINTENANCE; PROJECT MANAGEMENT; STRUCTURAL ANALYSIS;

EID: 0032809326     PISSN: 10760342     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)1076-0342(1999)5:2(52)     Document Type: Article
Times cited : (41)

References (8)
  • 1
    • 6544280040 scopus 로고
    • Engineering and design - Reliability assessment of navigation structures
    • U.S. Army Corps of Engineers, Washington, D.C.
    • Department of the Army, Corps of Engineers Civil Works Engineering Division. (1992). "Engineering and design - reliability assessment of navigation structures" Engrg. Tech, Letter ETL 1110-2-532, U.S. Army Corps of Engineers, Washington, D.C.
    • (1992) Engrg. Tech, Letter ETL 1110-2-532
  • 2
    • 0025475806 scopus 로고
    • Inspection and rating of steel sheet pile
    • ASCE
    • Greimann, L. F., Stecker, J. H., and Kao, A. M. (1990). "Inspection and rating of steel sheet pile." J. Perf Constr. Fac., ASCE, 4(3), 186-201.
    • (1990) J. Perf Constr. Fac. , vol.4 , Issue.3 , pp. 186-201
    • Greimann, L.F.1    Stecker, J.H.2    Kao, A.M.3
  • 4
    • 0022044579 scopus 로고
    • The condition of Corps of Engineers Civil Works concrete structures
    • U.S. Army Engineer Waterways Experiment Station, Vicksburg, Miss.
    • McDonald, J. E., and Campbell, R. L. Sr. (1985). "The condition of Corps of Engineers Civil Works concrete structures." Tech. Rep. REMR CS-2, U.S. Army Engineer Waterways Experiment Station, Vicksburg, Miss.
    • (1985) Tech. Rep. REMR CS-2
    • McDonald, J.E.1    Campbell Sr., R.L.2
  • 6
    • 6544264810 scopus 로고
    • QUADRANT: Incremental analysis methodology for prioritizing O&M projects (locks and dams) report (R3)
    • Planning and Management Consultants Ltd., Carbondale, Ill
    • Russell, C. S., et al. (1993). "QUADRANT: Incremental analysis methodology for prioritizing O&M projects (locks and dams) report (R3)." Letter Rep., Planning and Management Consultants Ltd., Carbondale, Ill.
    • (1993) Letter Rep.
    • Russell, C.S.1
  • 7
    • 0342315282 scopus 로고
    • Membrane and flashing condition indexes for built-up roofs. Vol. II, Inspection and distress manual
    • U.S. Army Construction Engineering Research Laboratories, Champaign, Ill.
    • Shahin, M. Y., Bailey, D. M., and Brotherson, D. E. (1987). "Membrane and flashing condition indexes for built-up roofs. Vol. II, Inspection and distress manual." Tech. Rep. M87/13, Vol II/ADA190368, U.S. Army Construction Engineering Research Laboratories, Champaign, Ill.
    • (1987) Tech. Rep. M87/13, Vol II/ADA190368 , vol.2
    • Shahin, M.Y.1    Bailey, D.M.2    Brotherson, D.E.3
  • 8
    • 0008467812 scopus 로고
    • Pavement maintenance management for roads and parking lots
    • U.S. Army Construction Engineering Research Laboratories, Champaign, Ill.
    • Shahin, M. Y., and Kohn, S. D. (1981). "Pavement maintenance management for roads and parking lots." Tech. Rep. M294/13, Vol II/ ADA1120296, U.S. Army Construction Engineering Research Laboratories, Champaign, Ill.
    • (1981) Tech. Rep. M294/13, Vol II/ ADA1120296
    • Shahin, M.Y.1    Kohn, S.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.