-
1
-
-
0035898986
-
An adaptive approach to controlling kanban systems
-
Tardif V and Maaseidvaag L (2001). An adaptive approach to controlling kanban systems. Eur J Opl Res 132: 411-424.
-
(2001)
Eur J Opl Res
, vol.132
, pp. 411-424
-
-
Tardif, V.1
Maaseidvaag, L.2
-
2
-
-
0033904015
-
The kanban assignment problem - A nonintegral approach
-
Herer YT and Shaolom L (2000). The kanban assignment problem - a nonintegral approach. Eur J Opl Res 120: 260-276.
-
(2000)
Eur J Opl Res
, vol.120
, pp. 260-276
-
-
Herer, Y.T.1
Shaolom, L.2
-
3
-
-
0031103287
-
An algorithm to dynamically adjust the number of kanbans in stochastic processing times and variable demand environment
-
Gupta SM and Al-Turki YAY (1997). An algorithm to dynamically adjust the number of kanbans in stochastic processing times and variable demand environment. Prod Planning Control 8: 133-141.
-
(1997)
Prod Planning Control
, vol.8
, pp. 133-141
-
-
Gupta, S.M.1
Al-Turki, Y.A.Y.2
-
4
-
-
0030269796
-
Operations planning for kanbans between two adjacent workstations
-
Barker BR and Balan CV (1996). Operations planning for kanbans between two adjacent workstations. Comput Indust Eng 31: 221-224.
-
(1996)
Comput Indust Eng
, vol.31
, pp. 221-224
-
-
Barker, B.R.1
Balan, C.V.2
-
5
-
-
0031999406
-
Operations planning for a single-stage kanban system operating under linear demand
-
Sarker BR and Balan CV (1998). Operations planning for a single-stage kanban system operating under linear demand. Int J Prod Res 36: 357-375.
-
(1998)
Int J Prod Res
, vol.36
, pp. 357-375
-
-
Sarker, B.R.1
Balan, C.V.2
-
6
-
-
0032708083
-
Operations planning for a multi-stage kanban system
-
Sarker BR and Balan CV (1999). Operations planning for a multi-stage kanban system. Eur J Opl Res 112: 284-303.
-
(1999)
Eur J Opl Res
, vol.112
, pp. 284-303
-
-
Sarker, B.R.1
Balan, C.V.2
-
7
-
-
0030194294
-
Cyclic scheduling for a multi-product, single-facility production system operating under a just-in-time delivery policy
-
Nori VS and Sarker BR (1996). Cyclic scheduling for a multi-product, single-facility production system operating under a just-in-time delivery policy. J Opl Res Soc 47: 930-935.
-
(1996)
J Opl Res Soc
, vol.47
, pp. 930-935
-
-
Nori, V.S.1
Sarker, B.R.2
-
8
-
-
0031641970
-
Optimum number of kanbans between two adjacent stations
-
Nori VS and Sarker BR (1998). Optimum number of kanbans between two adjacent stations. Prod Planning Control 9: 60-65.
-
(1998)
Prod Planning Control
, vol.9
, pp. 60-65
-
-
Nori, V.S.1
Sarker, B.R.2
-
9
-
-
0033317962
-
Operations planning in a supply chain system with fixed-interval deliveries of finished goods to multiple customers
-
Parija GR and Sarker BR (1999). Operations planning in a supply chain system with fixed-interval deliveries of finished goods to multiple customers. IIE Trans 31(11): 1075-1082.
-
(1999)
IIE Trans
, vol.31
, Issue.11
, pp. 1075-1082
-
-
Parija, G.R.1
Sarker, B.R.2
-
10
-
-
0032632360
-
The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory problem
-
Hill RM (1999). The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory problem. Int J Prod Res 37: 2463-2475.
-
(1999)
Int J Prod Res
, vol.37
, pp. 2463-2475
-
-
Hill, R.M.1
-
11
-
-
0242333134
-
Comparative modeling of multi-stage production-inventory control policies with lot sizing
-
Liberopoulos G and Dallery Y (2003). Comparative modeling of multi-stage production-inventory control policies with lot sizing. Int J Prod Res 41: 1273-1298.
-
(2003)
Int J Prod Res
, vol.41
, pp. 1273-1298
-
-
Liberopoulos, G.1
Dallery, Y.2
-
12
-
-
0040914138
-
Ranking of generalized multistage KANBAN policies
-
Axsater S and Rosling K (1999). Ranking of generalized multistage KANBAN policies. Eur J Opl Res 113: 560-567.
-
(1999)
Eur J Opl Res
, vol.113
, pp. 560-567
-
-
Axsater, S.1
Rosling, K.2
-
13
-
-
0036643308
-
A decomposition method for multi-product kanban systems with setup times and lost sales
-
Krieg G and Kuhn H (2002). A decomposition method for multi-product kanban systems with setup times and lost sales. IIE Trans 34:613-626.
-
(2002)
IIE Trans
, vol.34
, pp. 613-626
-
-
Krieg, G.1
Kuhn, H.2
-
14
-
-
0036589570
-
Allocating kanbans for a production system in a general configuration with a new control strategy
-
Zhao X, Nakashima K and Zhang ZG (2002). Allocating kanbans for a production system in a general configuration with a new control strategy. IEEE Trans Systems, Man Cybernet 32: 446-453.
-
(2002)
IEEE Trans Systems, Man Cybernet
, vol.32
, pp. 446-453
-
-
Zhao, X.1
Nakashima, K.2
Zhang, Z.G.3
-
15
-
-
0027353436
-
Determining the number of kanbans in multiitem just-in-time systems
-
Askin RG, Mitwasi MG and Goldberg JB (1993). Determining the number of kanbans in multiitem just-in-time systems. IIE Trans 25: 89-98.
-
(1993)
IIE Trans
, vol.25
, pp. 89-98
-
-
Askin, R.G.1
Mitwasi, M.G.2
Goldberg, J.B.3
-
16
-
-
0030784108
-
Control policies for multi-product, multi-stage manufacturing systems: An experimental approach
-
Amin M and Altiok T (1997). Control policies for multi-product, multi-stage manufacturing systems: an experimental approach. Int J Prod Res 35: 201-223.
-
(1997)
Int J Prod Res
, vol.35
, pp. 201-223
-
-
Amin, M.1
Altiok, T.2
-
17
-
-
2442483425
-
Simulation analysis of order and kanban sequencing rules in a kanban-controlled flow shop
-
Aytug H and Dogan CA (1999). Simulation analysis of order and kanban sequencing rules in a kanban-controlled flow shop. Simulation 72: 212-220.
-
(1999)
Simulation
, vol.72
, pp. 212-220
-
-
Aytug, H.1
Dogan, C.A.2
-
19
-
-
0035247219
-
Project surface regions: A decision support methodology for multitasking workers assignment in JIT systems
-
Horng HC and Cochran JK (2001). Project surface regions: a decision support methodology for multitasking workers assignment in JIT systems. Comput Indust Eng 39: 159-171.
-
(2001)
Comput Indust Eng
, vol.39
, pp. 159-171
-
-
Horng, H.C.1
Cochran, J.K.2
-
20
-
-
0023167521
-
Kanban MRP, and shaping the manufacturing environment
-
Krajewski LJ, King BE, Ritzman LP and Wong DS (1987). Kanban MRP, and shaping the manufacturing environment. Mngt Sci 33: 39-57.
-
(1987)
Mngt Sci
, vol.33
, pp. 39-57
-
-
Krajewski, L.J.1
King, B.E.2
Ritzman, L.P.3
Wong, D.S.4
-
21
-
-
0022902024
-
An outer-approximation algorithm for a class of mixed-integer nonlinear programs
-
Duran MA and Grossmann NE (1986). An outer-approximation algorithm for a class of mixed-integer nonlinear programs. Math Programming 36: 307-339.
-
(1986)
Math Programming
, vol.36
, pp. 307-339
-
-
Duran, M.A.1
Grossmann, N.E.2
-
22
-
-
0026374299
-
Optimum number of kanbans between two adjacent workstations in a JIT system
-
Wang H and Wang HP (1991). Optimum number of kanbans between two adjacent workstations in a JIT system, Int J Prod Econ 22: 179-188.
-
(1991)
Int J Prod Econ
, vol.22
, pp. 179-188
-
-
Wang, H.1
Wang, H.P.2
|