메뉴 건너뛰기




Volumn 54, Issue 5-6, 2005, Pages 400-418

Assessing maturity and effectiveness of enterprise performance measurement systems

Author keywords

Belgium; Organizational change; Performance measures; Public sector organizations

Indexed keywords


EID: 23444451280     PISSN: 17410401     EISSN: None     Source Type: Journal    
DOI: 10.1108/17410400510604557     Document Type: Article
Times cited : (58)

References (29)
  • 1
    • 23444442932 scopus 로고    scopus 로고
    • Neely, A. Kennerley, M. Walters, A. Fourth International Conference on Performance Measurement and Management, 28-30 July Performance Measurement Association Edinburgh
    • Andersen, B. and Hendriksen, B. (2004), "Performance measurement system success depends on design alignment with the core purpose of its implementation", in Neely, A., Kennerley, M. and Walters, A. (Eds), Fourth International Conference on Performance Measurement and Management, 28-30 July, Performance Measurement Association, Edinburgh, pp. 27-34.
    • (2004) Performance Measurement System Success Depends on Design Alignment with the Core Purpose of its Implementation , pp. 27-34
    • Andersen, B.1    Hendriksen, B.2
  • 2
    • 23444443547 scopus 로고    scopus 로고
    • BSC online member survey 2003, executive summary
    • available at: www.bscol.com
    • Balanced Scorecard Collaborative (2003), "BSC online member survey 2003, executive summary", Balanced Scorecard Collaborative, available at: www.bscol.com.
    • (2003) Balanced Scorecard Collaborative
  • 3
    • 0003957502 scopus 로고    scopus 로고
    • Author Gaithersburg, MD
    • Baldrige National Quality Program (BNQP) (2002), Criteria for Performance Excellence, Author, Gaithersburg, MD.
    • (2002) Criteria for Performance Excellence
  • 4
    • 29144477388 scopus 로고    scopus 로고
    • Neely, A. Kennerley, M. Walters, A. Fourth International Conference on Performance Measurement and Management, 28-30 July Performance Measurement Association Edinburgh
    • Bauer, J., Tanner, S.J. and Neely, A. (2004), "Benchmarking performance measurement: a consortium benchmarking study", in Neely, A., Kennerley, M. and Walters, A. (Eds), Fourth International Conference on Performance Measurement and Management, 28-30 July, Performance Measurement Association, Edinburgh, pp. 1021-8.
    • (2004) Benchmarking Performance Measurement: A Consortium Benchmarking Study , pp. 1021-8
    • Bauer, J.1    Tanner, S.J.2    Neely, A.3
  • 8
    • 23444453585 scopus 로고    scopus 로고
    • Proceedings of the Annual Institute of Industrial Engineers' Conference [CD-ROM], 19-22 May Institute of Industrial Engineers Orlando, FL
    • Creed, D. and Coleman, G. (2002), "Balanced scorecard software - what, why, when, how, and how not to do it", Proceedings of the Annual Institute of Industrial Engineers' Conference [CD-ROM], 19-22 May, Institute of Industrial Engineers, Orlando, FL.
    • (2002) Balanced Scorecard Software - What, Why, When, How, and How Not to Do It
    • Creed, D.1    Coleman, G.2
  • 9
    • 23444452603 scopus 로고    scopus 로고
    • Estimating interrater reliability for a state quality award
    • Coleman, G.D., Van Aken, E.M. and Shen, J. (2002), "Estimating interrater reliability for a state quality award", Quality Management Journal, Vol. 9 No. 4, pp. 39-58.
    • (2002) Quality Management Journal , vol.9 , Issue.4 , pp. 39-58
    • Coleman, G.D.1    Van Aken, E.M.2    Shen, J.3
  • 11
    • 0004003238 scopus 로고    scopus 로고
    • EFQM, Brussels
    • European Foundation for Quality Management (EFQM) (1999), "The EFQM excellence model", EFQM, Brussels.
    • (1999) The EFQM Excellence Model
  • 12
    • 0002328783 scopus 로고    scopus 로고
    • Innovation action research: Creating new management theory and practice
    • Kaplan, R. (1998), "Innovation action research: creating new management theory and practice", Journal of Management Accounting Research, Vol. 10, pp. 89-118.
    • (1998) Journal of Management Accounting Research , vol.10 , pp. 89-118
    • Kaplan, R.1
  • 13
    • 23444438564 scopus 로고    scopus 로고
    • paper presented at the Third International Conference on the Theory and Practice of Performance Measurement and Management Performance Measurement Association Boston, MA
    • Kaplan, R. (2002), "Keynote address", paper presented at the Third International Conference on the Theory and Practice of Performance Measurement and Management, Performance Measurement Association, Boston, MA, 19-21 July.
    • (2002) Keynote Address
    • Kaplan, R.1
  • 14
    • 0002091684 scopus 로고    scopus 로고
    • Using the balanced scorecard as a strategic management system
    • Kaplan, R. and Norton, D.P. (1996), "Using the balanced scorecard as a strategic management system", Harvard Business Review, Vol. 74 No. 1, pp. 75-85.
    • (1996) Harvard Business Review , vol.74 , Issue.1 , pp. 75-85
    • Kaplan, R.1    Norton, D.P.2
  • 15
    • 0036455946 scopus 로고    scopus 로고
    • A framework of the factors affecting the evolution of performance measurement systems
    • Kennerley, M. and Neely, A. (2002), "A framework of the factors affecting the evolution of performance measurement systems", International Journal of Operations & Production Management, Vol. 22 No. 11, pp. 1222-45.
    • (2002) International Journal of Operations & Production Management , vol.22 , Issue.11 , pp. 1222-45
    • Kennerley, M.1    Neely, A.2
  • 18
  • 20
    • 23444446243 scopus 로고    scopus 로고
    • The Balanced Scorecard Software Report, Gartner, Stamford, CT, and Cranfield School of Management, Cranfield
    • Marr, B. and Neely, A. (2001), The Balanced Scorecard Software Report, Gartner, Stamford, CT, and Cranfield School of Management, Cranfield.
    • (2001)
    • Marr, B.1    Neely, A.2
  • 21
    • 84986131152 scopus 로고    scopus 로고
    • Business performance measurement: Past, present, and future
    • Marr, B. and Schiuma, G. (2003), "Business performance measurement: past, present, and future", Management Decision, Vol. 41 No. 8, pp. 680-7.
    • (2003) Management Decision , vol.41 , Issue.8 , pp. 680-7
    • Marr, B.1    Schiuma, G.2
  • 23
    • 0033478138 scopus 로고    scopus 로고
    • The performance measurement revolution: Why now and what next?
    • Neely, A. (1999), "The performance measurement revolution: why now and what next?", International Journal of Operations & Production Management, Vol. 19 No. 2, pp. 205-28.
    • (1999) International Journal of Operations & Production Management , vol.19 , Issue.2 , pp. 205-28
    • Neely, A.1
  • 24
    • 0008663899 scopus 로고    scopus 로고
    • Perspectives on performance: The performance prism
    • Bourne, M. Gee Publishing London
    • Neely, A. and Adams, C. (2000), "Perspectives on performance: the performance prism", in Bourne, M. (Ed.), Handbook of Performance Measurement, Gee Publishing, London.
    • (2000) Handbook of Performance Measurement
    • Neely, A.1    Adams, C.2
  • 26
    • 0038269850 scopus 로고    scopus 로고
    • The balanced scorecard: What is the score? A rhetorical analysis of the balanced scorecard
    • Nørreklit, H. (2003), "The balanced scorecard: what is the score? A rhetorical analysis of the balanced scorecard", Accounting, Organizations, and Society, Vol. 28, pp. 591-619.
    • (2003) Accounting, Organizations, and Society , vol.28 , pp. 591-619
    • Nørreklit, H.1
  • 28
    • 0043056231 scopus 로고
    • (with Johnston, C.J.) Industrial Engineering & Management Press Norcross, GA
    • Sink, D. and Morris, W.T. (1995), By What Method?, (with Johnston, C.J.), Industrial Engineering & Management Press, Norcross, GA.
    • (1995) By What Method?
    • Sink, D.1    Morris, W.T.2
  • 29
    • 0042265670 scopus 로고    scopus 로고
    • Integrated enterprise transformation: Case application in engineering project work in the Belgian Armed Forces
    • Van Aken, E.M., Van Goubergen, D. and Letens, G. (2003), "Integrated enterprise transformation: case application in engineering project work in the Belgian Armed Forces", Engineering Management Journal, Vol. 15 No. 2, pp. 3-16.
    • (2003) Engineering Management Journal , vol.15 , Issue.2 , pp. 3-16
    • Van Aken, E.M.1    Van Goubergen, D.2    Letens, G.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.