-
2
-
-
0034244822
-
Developing Performance Metrics for a Design Engineering Department
-
Componation
-
Buchheim, Robert, "Developing Performance Metrics for a Design Engineering Department," (2000) IEEE Transactions on Engineering Management, 473, pp. 309-320. Componation
-
(2000)
IEEE Transactions on Engineering Management
, vol.473
, pp. 309-320
-
-
Buchheim, R.1
-
3
-
-
0041553149
-
Using Risk Reduction to Measure Team Performance
-
Paul J., Dawn R. Utley, and J.J. Swain, "Using Risk Reduction to Measure Team Performance," (2001) Engineering Management Journal 13A, pp. 27-34.
-
(2001)
Engineering Management Journal
, vol.13A
, pp. 27-34
-
-
Paul, J.1
Utley, D.R.2
Swain, J.J.3
-
4
-
-
0033184885
-
Teams Alone Are Not Enough
-
Davis, K.A., and Garry D. Coleman, (1999) "Teams Alone Are Not Enough," Engineering Management Journal, 11(3), pp. 31-37.
-
(1999)
Engineering Management Journal
, vol.11
, Issue.3
, pp. 31-37
-
-
Davis, K.A.1
Coleman, G.D.2
-
5
-
-
85023848750
-
-
European Foundation for Quality Management
-
European Foundation for Quality Management, The EFQM Excellence Model, Brussels: EFQM. Available at: http://www.efqm.org/new_website/welcome.htm
-
The EFQM Excellence Model, Brussels: EFQM
-
-
-
6
-
-
0031210412
-
Concurrent Engineering and the Underlying Structure of the Design Problem
-
Funk, Jeffrey, "Concurrent Engineering and the Underlying Structure of the Design Problem," 44(3)(1997) IEEE Transactions on Engineering Management, pp. 305-315.
-
(1997)
IEEE Transactions on Engineering Management
, vol.44
, Issue.3
, pp. 305-315
-
-
Funk, J.1
-
7
-
-
33745776235
-
-
GPRA. U.S. Code. Government Performance and Results Act of, Available at
-
GPRA. U.S. Code. Government Performance and Results Act of 1993, Public Law 103-62. Available at: http://www.nsf.gov/sbe/srs/ostp/assess/nstcafsh.htm
-
(1993)
Public Law 103-62
-
-
-
8
-
-
84986166539
-
Formalizing Deployment Processes in the U.S. Government
-
Hacker, Marla, Timothy Kotnour, and Larry Mallak, "Formalizing Deployment Processes in the U.S. Government," 14(3)(2001) International Journal of Public Sector Management, pp. 221-240.
-
(2001)
International Journal of Public Sector Management
, vol.14
, Issue.3
, pp. 221-240
-
-
Hacker, M.1
Kotnour, T.2
Mallak, L.3
-
9
-
-
85023817207
-
-
Hammer, Michael, and D. Champy, (1993) The Reengineered Corporation.
-
(1993)
-
-
Hammer, M.1
Champy, D.2
-
12
-
-
0033185232
-
Establishing a Change Infrastructure Through Teams
-
Kotnour, Tim, Jean Matkovich, and Rob Ellison, "Establishing a Change Infrastructure Through Teams," 11(3)(1999) Engineering Management Journal, pp. 25-30.
-
(1999)
Engineering Management Journal
, vol.11
, Issue.3
, pp. 25-30
-
-
Kotnour, T.1
Matkovich, J.2
Ellison, R.3
-
13
-
-
0003621845
-
-
Harvard Business School Press
-
Kotter, John P., (1996) Leading Change, Harvard Business School Press.
-
(1996)
Leading Change
-
-
Kotter, J.P.1
-
14
-
-
0008899439
-
Trouble in Paradise: Disintegrated Strategic Change with a Government Agency
-
McHugh, Marie, (1997) "Trouble in Paradise: Disintegrated Strategic Change with a Government Agency," International Journal of Public Sector Management, Id.6, pp. 433-443.
-
(1997)
International Journal of Public Sector Management
, vol.6
, pp. 433-443
-
-
McHugh, M.1
-
15
-
-
0042555246
-
Performance Measurement and Management: Research and Action
-
oston, MA, Centre for Business Performance, Cranfield University, Cranfield, Bedfordshire, U.K
-
Neely, Andy, Angela Walters, and Robert Austin, "Performance Measurement and Management: Research and Action," (2002) Papers from the Third International Conference on Performance Measurement and Management, Boston, MA, Centre for Business Performance, Cranfield University, Cranfield, Bedfordshire, U.K.
-
(2002)
Papers from the Third International Conference on Performance Measurement and Management
-
-
Neely, A.1
Walters, A.2
Austin, R.3
-
17
-
-
0043056231
-
-
Engineering and Management Press: Institute of Industrial Engineers
-
Sink, D. Scott, and William T. Morris, (1995) By What Method? Engineering and Management Press: Institute of Industrial Engineers.
-
(1995)
By What Method
-
-
Sink, D.S.1
Morris, W.T.2
-
18
-
-
0042054493
-
Coleman, "Integrated Organizational Assessment Process and Tools: Application in an Engineer-to-Order Company,"
-
December
-
Van Aken, Eileen M., Richard L. Groesbeck, and Garry D. Coleman, "Integrated Organizational Assessment Process and Tools: Application in an Engineer-to-Order Company," Engineering Management Journal, 13(4)(December 2001), pp. 17-26.
-
Engineering Management Journal
, vol.13
, Issue.4
, pp. 17-26
-
-
Aken, V.1
Eileen, M.2
Groesbeck, R.L.3
Garry, D.4
-
19
-
-
0042555284
-
Building Better Measurement
-
July/August
-
Van Aken, Eileen M., and Garry D. Coleman, "Building Better Measurement," Industrial Management (July/August, 2002), pp. 28-33.
-
(2002)
Industrial Management
, pp. 28-33
-
-
Aken, V.1
Eileen, M.2
Coleman, G.D.3
-
20
-
-
85023829578
-
-
World Academy of Productivity Science, Hong Kong and Beijing, November 5-10
-
World Academy of Productivity Sciences, Proceedings of the Xllth World Productivity Congress, Hong Kong and Beijing, November 5-10, 2001.
-
(2001)
Proceedings of the Xllth World Productivity Congress
-
-
|