메뉴 건너뛰기




Volumn 12, Issue 4, 2005, Pages 373-390

Consideration of break in modeling of construction processes

Author keywords

Construction systems; Modelling; Simulation; Time study

Indexed keywords

ALGORITHMS; COMPUTER SIMULATION; MATHEMATICAL MODELS; PROJECT MANAGEMENT; TIME AND MOTION STUDY;

EID: 23444444143     PISSN: 09699988     EISSN: None     Source Type: Journal    
DOI: 10.1108/09699980510608820     Document Type: Article
Times cited : (3)

References (23)
  • 1
    • 0020809840 scopus 로고
    • An exact algorithm for the time-constrained traveling salesmen problem
    • Baker, E. (1983), "An exact algorithm for the time-constrained traveling salesmen problem", Operations Research, Vol. 31, pp. 938-45.
    • (1983) Operations Research , vol.31 , pp. 938-945
    • Baker, E.1
  • 4
    • 0012234280 scopus 로고    scopus 로고
    • Production scheduling for precast plants using a flow shop sequencing model
    • Chan, W.T. and Hu, H. (2002), "Production scheduling for precast plants using a flow shop sequencing model", Journal of Construction Engineering and Management, ASCE, Vol. 16 No. 3, pp. 165-74.
    • (2002) Journal of Construction Engineering and Management , vol.16 , Issue.3 , pp. 165-174
    • Chan, W.T.1    Hu, H.2
  • 5
    • 0019572341 scopus 로고
    • State space relaxation procedures for the computation of bounds to routing problems
    • Christofides, N., Mingozzi, A. and Toth, P. (1981), "State space relaxation procedures for the computation of bounds to routing problems", Networks, Vol. 11, pp. 145-64.
    • (1981) Networks , vol.11 , pp. 145-164
    • Christofides, N.1    Mingozzi, A.2    Toth, P.3
  • 7
    • 0019574134 scopus 로고
    • A generalized assignment heuristic for vehicle routing
    • Fisher, M. and Jaikumar, R. (1981), "A generalized assignment heuristic for vehicle routing", Networks, Vol. 11, pp. 109-24.
    • (1981) Networks , vol.11 , pp. 109-124
    • Fisher, M.1    Jaikumar, R.2
  • 8
    • 0035708335 scopus 로고    scopus 로고
    • Comparison of simulation modeling techniques that use preemption to capture design uncertainty
    • IEEE New York, NY
    • Gil, N. and Tommelein, I.D. (2001), "Comparison of simulation modeling techniques that use preemption to capture design uncertainty", Proceedings of the 2001 Winter Simulation Conference, IEEE, New York, NY, pp. 1504-11.
    • (2001) Proceedings of the 2001 Winter Simulation Conference , pp. 1504-1511
    • Gil, N.1    Tommelein, I.D.2
  • 9
    • 0017539255 scopus 로고
    • CYCLONE - A method for modeling job site processes
    • Halpin, D.W. (1976), "CYCLONE - a method for modeling job site processes", Journal of the Construction Division, Vol. 103 No. 3, ASCE, pp. 489-99.
    • (1976) Journal of the Construction Division , vol.103 , Issue.3 , pp. 489-499
    • Halpin, D.W.1
  • 11
    • 0032599550 scopus 로고    scopus 로고
    • Java iconic visual environment or simulation (JIVESim)
    • Hamad, I.O., Paul, J.R. and Macredie, R. (1999), "Java iconic visual environment or simulation (JIVESim)", Computer & Industrial Engineering, Vol. 37, No. 1-2, pp. 243-6.
    • (1999) Computer & Industrial Engineering , vol.37 , Issue.1-2 , pp. 243-246
    • Hamad, I.O.1    Paul, J.R.2    MacRedie, R.3
  • 12
    • 0022699580 scopus 로고
    • Strategy-related characteristics of discrete-event languages and models
    • Hopper, J.W. (1986), "Strategy-related characteristics of discrete-event languages and models", Simulation, Vol. 46 No. 4, pp. 153-9.
    • (1986) Simulation , vol.46 , Issue.4 , pp. 153-159
    • Hopper, J.W.1
  • 13
  • 14
    • 0029509259 scopus 로고
    • Advantages of the activity-scanning approach in the modeling of complex construction processes
    • IEEE New York, NY
    • Martinez, J.C. and Ioannou, P.G. (1995), "Advantages of the activity-scanning approach in the modeling of complex construction processes", Proceedings of the 1995 Winter Simulation Conference, IEEE, New York, NY, pp. 1024-31.
    • (1995) Proceedings of the 1995 Winter Simulation Conference , pp. 1024-1031
    • Martinez, J.C.1    Ioannou, P.G.2
  • 15
  • 19
    • 0032684768 scopus 로고    scopus 로고
    • Activity-based construction (ABC) modeling and simulation method
    • Shi, J. (1999), "Activity-based construction (ABC) modeling and simulation method", Journal of Construction Engineering and Management, Vol. 125 No. 9, ASCE, pp. 354-60.
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.9 , pp. 354-360
    • Shi, J.1
  • 20
    • 0023313252 scopus 로고
    • Algorithms for the vehicle-routing and scheduling problems with time window constraints
    • Soloman, M.M. (1987), "Algorithms for the vehicle-routing and scheduling problems with time window constraints", Operations Research, Vol. 35, pp. 254-65.
    • (1987) Operations Research , vol.35 , pp. 254-265
    • Soloman, M.M.1
  • 21
    • 0028740224 scopus 로고
    • Knowledge-based assembly of simulation networks using construction designs, plans, and methods
    • IEEE New York, NY
    • Tommelein, I.D. and Odeh, A.M. (1994), "Knowledge-based assembly of simulation networks using construction designs, plans, and methods", Proceedings of the 1994 Winter Simulation Conference, IEEE, New York, NY, pp. 1145-58.
    • (1994) Proceedings of the 1994 Winter Simulation Conference , pp. 1145-1158
    • Tommelein, I.D.1    Odeh, A.M.2
  • 22
    • 1642432959 scopus 로고    scopus 로고
    • Simulation-based methodology for project scheduling
    • Zhang, H., Tam, C.M. and Shi, J. (2002), "Simulation-based methodology for project scheduling", Construction Management and Economics, Vol. 20 No. 8, pp. 667-78.
    • (2002) Construction Management and Economics , vol.20 , Issue.8 , pp. 667-678
    • Zhang, H.1    Tam, C.M.2    Shi, J.3
  • 23
    • 1642598653 scopus 로고    scopus 로고
    • Application of fuzzy logic to construction simulation
    • Zhang, H., Tam, C.M. and Shi, J. (2003), "Application of fuzzy logic to construction simulation", Journal of Computing in Civil Engineering, Vol. 17 No. 1, ASCE, pp. 38-45.
    • (2003) Journal of Computing in Civil Engineering , vol.17 , Issue.1 , pp. 38-45
    • Zhang, H.1    Tam, C.M.2    Shi, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.