메뉴 건너뛰기




Volumn 11, Issue 1, 2004, Pages 55-64

Planning, estimation and productivity in the lean concrete pour

Author keywords

Concretes; Construction; Estimation; Lean production; Operations planning; Productivity rate

Indexed keywords

CIVIL ENGINEERING; CONCRETE CONSTRUCTION; CONCRETE INDUSTRY; ESTIMATION; PLANNING; PRODUCTIVITY; PROJECT MANAGEMENT;

EID: 2342620070     PISSN: 09699988     EISSN: None     Source Type: Journal    
DOI: 10.1108/09699980410512665     Document Type: Review
Times cited : (23)

References (13)
  • 1
    • 0031832477 scopus 로고    scopus 로고
    • Performance of concrete placing in Hong Kong buildings
    • Anson, M. and Wang, S.Q. (1998), "Performance of concrete placing in Hong Kong buildings", J. Constr. Eng. Mgmt, ASCE Vol. 124 No. 2, pp. 116-24.
    • (1998) J. Constr. Eng. Mgmt, ASCE , vol.124 , Issue.2 , pp. 116-124
    • Anson, M.1    Wang, S.Q.2
  • 3
    • 2342538052 scopus 로고    scopus 로고
    • A non-deterministic investigation of the concrete placing system
    • 17-19 July 2000, Brighton
    • Dunlop, P.G. and Smith, S.D. (2000), "A non-deterministic investigation of the concrete placing system", Proc. 8th Ann. Conf. Intl Group for Lean Constr., IGLC-8, 17-19 July 2000, Brighton.
    • (2000) Proc. 8th Ann. Conf. Intl Group for Lean Constr. , vol.IGLC-8
    • Dunlop, P.G.1    Smith, S.D.2
  • 5
    • 0002209085 scopus 로고
    • Research of factors influencing construction productivity
    • Herbsman, Z. and Ellis, R. (1990), "Research of factors influencing construction productivity", Constr. Mgmt Econs, Vol. 8 No. 1, pp. 49-61.
    • (1990) Constr. Mgmt Econs , vol.8 , Issue.1 , pp. 49-61
    • Herbsman, Z.1    Ellis, R.2
  • 6
    • 0001247217 scopus 로고    scopus 로고
    • What is lean construction - 1999
    • 26-28 July, University of California, Berkeley, CA
    • Howell, G.A. (1999), "What is lean construction - 1999", Proc. 7th Ann, Conf. Intl. Group for Lean Constr., IGLC-7, 26-28 July, University of California, Berkeley, CA.
    • (1999) Proc. 7th Ann, Conf. Intl. Group for Lean Constr. , vol.IGLC-7
    • Howell, G.A.1
  • 7
    • 0003656231 scopus 로고
    • Application of the new production philosophy to construction
    • CIFE, Stanford University, Stanford, CA
    • Koskela, L. (1992), "Application of the new production philosophy to construction". Technical Report 72, CIFE, Stanford University, Stanford, CA, p. 75.
    • (1992) Technical Report , vol.72 , pp. 75
    • Koskela, L.1
  • 9
    • 0343632190 scopus 로고
    • Time as a primary system metric
    • Heim, J.A. and Compton, W.D. (Eds), National Academy Press, Washington, DC
    • Krupka, D.C. (1992), "Time as a primary system metric", in Heim, J.A. and Compton, W.D. (Eds), Manufacturing Systems: Foundations of World-class Practice, National Academy Press, Washington, DC, pp. 166-72.
    • (1992) Manufacturing Systems: Foundations of World-class Practice , pp. 166-172
    • Krupka, D.C.1
  • 11
    • 0032640764 scopus 로고    scopus 로고
    • Earthmoving productivity estimation using linear regression techniques
    • Smith, S.D. (1999), "Earthmoving productivity estimation using linear regression techniques", J. Constr. Eng. Mgmt, ASCE, Vol. 125 No. 3, pp. 133-41.
    • (1999) J. Constr. Eng. Mgmt, ASCE , vol.125 , Issue.3 , pp. 133-141
    • Smith, S.D.1
  • 12
    • 0002372299 scopus 로고    scopus 로고
    • Just-in-time concrete delivery: Mapping alternatives for vertical supply chain integration
    • 26-28 July, University of California, Berkeley, CA
    • Tommelein, I.D. and Li, A.E.I. (1997), "Just-in-time concrete delivery: mapping alternatives for vertical supply chain integration", Proc. 7th Ann. Conf. Intl Group for Lean Constr., IGLC-7, 26-28 July, University of California, Berkeley, CA, pp. 97-108.
    • (1997) Proc. 7th Ann. Conf. Intl Group for Lean Constr. , vol.IGLC-7 , pp. 97-108
    • Tommelein, I.D.1    Li, A.E.I.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.