메뉴 건너뛰기




Volumn , Issue , 2003, Pages 1083-1093

Tablet and Wearable Computers for Integrated Design and Construction

Author keywords

[No Author keywords available]

Indexed keywords

BUILDING INDUSTRY; CONSTRUCTION ORGANIZATIONS; INTEGRATED DESIGN; PROJECT COMMUNICATIONS;

EID: 2342417873     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (7)

References (20)
  • 1
    • 0030784312 scopus 로고    scopus 로고
    • Communications Issues in Concurrent Life-Cycle Design and Construction
    • Anumba, C.J., Baron, G. and Evbuomwan, N.F.O. (1997). "Communications Issues in Concurrent Life-Cycle Design and Construction," BT Technology Journal, 15 (1), 209-216.
    • (1997) BT Technology Journal , vol.15 , Issue.1 , pp. 209-216
    • Anumba, C.J.1    Baron, G.2    Evbuomwan, N.F.O.3
  • 2
    • 0025460238 scopus 로고
    • Looking Back at Design, Looking Forward to Construction
    • Brown, C., and Beaton, H. (1990). "Looking Back at Design, Looking Forward to Construction," Journal of Management in Engineering, 6 (3), 342-349.
    • (1990) Journal of Management in Engineering , vol.6 , Issue.3 , pp. 342-349
    • Brown, C.1    Beaton, H.2
  • 3
    • 0035151782 scopus 로고    scopus 로고
    • Cognizance of Visual Design Management in Life-Cycle Project Management
    • January 2001
    • Chaaya, M. and Jaafari, A. (2001). "Cognizance of Visual Design Management in Life-Cycle Project Management," Journal of Management in Engineering, January 2001, 49-57.
    • (2001) Journal of Management in Engineering , pp. 49-57
    • Chaaya, M.1    Jaafari, A.2
  • 4
    • 84993030326 scopus 로고    scopus 로고
    • The Maquette, the Model and the Computer: Organizational Futures for Design and Construction
    • Day, A. (1996). "The Maquette, the Model and the Computer: Organizational Futures for Design and Construction," Engineering, Construction and Architecture Management, 3(1).
    • (1996) Engineering, Construction and Architecture Management , vol.3 , Issue.1
    • Day, A.1
  • 5
    • 0028430683 scopus 로고
    • Value of Concurrent Engineering for A/E/C Industry
    • (May/June 1994)
    • de la Garza, J., et. al. (1994). "Value of Concurrent Engineering for A/E/C Industry," Journal of Management in Engineering, (May/June 1994), 46-55.
    • (1994) Journal of Management in Engineering , pp. 46-55
    • De la Garza, J.1
  • 8
    • 0001215891 scopus 로고    scopus 로고
    • Concurrent Construction and Life Cycle Project Management
    • December 1997
    • Jaafari, A. (1997). "Concurrent Construction and Life Cycle Project Management," Journal of Construction Engineering and Management, December 1997, 427-436.
    • (1997) Journal of Construction Engineering and Management , pp. 427-436
    • Jaafari, A.1
  • 11
    • 0029239246 scopus 로고
    • Digital Data-Collection Device for Construction Site Documentation
    • ASCE, New York, NY
    • Liu, L.Y. (1995) "Digital Data-Collection Device for Construction Site Documentation," Computing in Civil Engineering, ASCE, New York, NY (2), 1287-1293.
    • (1995) Computing in Civil Engineering , Issue.2 , pp. 1287-1293
    • Liu, L.Y.1
  • 12
    • 2342422199 scopus 로고    scopus 로고
    • Hand-held Multimedia Documentation for Tunnel Inspections
    • American Society of Civil Engineers, Stanford, California, August 2000
    • Liu, L.Y. (2000). "Hand-held Multimedia Documentation for Tunnel Inspections," Proceedings of Computing in Civil Engineering, American Society of Civil Engineers, Stanford, California, August 2000, 1125-1131,
    • (2000) Proceedings of Computing in Civil Engineering , pp. 1125-1131
    • Liu, L.Y.1
  • 14
    • 0032205169 scopus 로고    scopus 로고
    • Humanistic Intelligence/Humanistic Computing
    • Mann, S. (1998). "Humanistic Intelligence/Humanistic Computing," Proceedings of the IEEE, 86(11) 2123-2151.
    • (1998) Proceedings of the IEEE , vol.86 , Issue.11 , pp. 2123-2151
    • Mann, S.1
  • 15
    • 17244362051 scopus 로고    scopus 로고
    • Dynamic Planning and Control Methodology for Design/Build Fast-track Construction Projects
    • January/February 20001
    • Peña-Mora, F. and Li, M. (2001). "Dynamic Planning and Control Methodology for Design/Build Fast-track Construction Projects," Journal of Construction Engineering and Management, January/February 20001, 1-17.
    • (2001) Journal of Construction Engineering and Management , pp. 1-17
    • Peña-Mora, F.1    Li, M.2
  • 16
    • 0001849920 scopus 로고    scopus 로고
    • Communication and Governance in the Building Process
    • Pietroforte, R. (1997). "Communication and Governance in the Building Process," Construction Management and Economics (15), 71-82.
    • (1997) Construction Management and Economics , Issue.15 , pp. 71-82
    • Pietroforte, R.1
  • 18
    • 0029190176 scopus 로고
    • Empirical Study of Collaborative Wearable Computer Systems
    • CHI - Conference Proceedings ACM, New York
    • Siegel, J.,et.al. (1995). "Empirical Study of Collaborative Wearable Computer Systems." Human Factors in Computing Systems, CHI - Conference Proceedings (2), ACM, New York, 312-313.
    • (1995) Human Factors in Computing Systems , Issue.2 , pp. 312-313
    • Siegel, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.