Construction in the UK petrochemical industry - Aspects of concurrent engineering practice
-
ASCE, New York
-
Anumba, C. J., Kamara, J. M., and Evbuomwan, N. F. O. (1997). "Construction in the UK petrochemical industry - Aspects of concurrent engineering practice." Proc., Computing in Civ. Engrg., ASCE, New York, 114-121.
-
(1997)
Proc., Computing in Civ. Engrg.
, pp. 114-121
-
-
Anumba, C.J.1
Kamara, J.M.2
Evbuomwan, N.F.O.3
-
5
-
-
0028516982
-
RATAS project - Developing an infrastructure for computer-integrated construction
-
Björk, B.-C. (1994). "RATAS project - Developing an infrastructure for computer-integrated construction." J. Comp. in Civ. Engrg., ASCE, 8(4), 400-419.
-
(1994)
J. Comp. in Civ. Engrg., ASCE
, vol.8
, Issue.4
, pp. 400-419
-
-
Björk, B.-C.1
-
6
-
-
0006411075
-
-
Strathclyde University
-
CAD Centre. (1999). "CAD Centre." Strathclyde University, http:// www.cad.strath.ac.uk/.
-
(1999)
CAD Centre
-
-
-
8
-
-
0002630983
-
Integrated design management within a life cycle project management paradigm
-
Chaaya, M., and Jaafari, A. (1999). "Integrated design management within a life cycle project management paradigm." Proc., Constr. Process Re-Engrg., 279-289.
-
(1999)
Proc., Constr. Process Re-Engrg.
, pp. 279-289
-
-
Chaaya, M.1
Jaafari, A.2
-
10
-
-
0026062850
-
Integrating CAD with construction-schedule generation
-
Chemeff, J., Logcher, R., and Sriram, D. (1991). "Integrating CAD with construction-schedule generation." J. Comp. in Civ. Engrg., ASCE, 5(1), 64-84.
-
(1991)
J. Comp. in Civ. Engrg., ASCE
, vol.5
, Issue.1
, pp. 64-84
-
-
Chemeff, J.1
Logcher, R.2
Sriram, D.3
-
12
-
-
84974449619
-
OARPLAN: Generating project plans by reasoning about objects, actions and resources
-
Darwiche, A., Levitt, R. E., and Hayes Roth, B. (1988). "OARPLAN: Generating project plans by reasoning about objects, actions and resources." J. AI in Engrg. Des. and Manufacturing, 2(3).
-
(1988)
J. AI in Engrg. Des. and Manufacturing
, vol.2
, Issue.3
-
-
Darwiche, A.1
Levitt, R.E.2
Hayes Roth, B.3
-
13
-
-
84988168725
-
OPIS: An object model-based project information system
-
Froese, T. M., and Paulson, B. C., Jr. (1994). "OPIS: An object model-based project information system." Microcomp. in Civ. Engrg., 9(1994), 13-28.
-
(1994)
Microcomp. in Civ. Engrg.
, vol.9
, Issue.1994
, pp. 13-28
-
-
Froese, T.M.1
Paulson B.C., Jr.2
-
14
-
-
84959948615
-
Intelligent construction and cost analysis
-
Gray, C. (1986). "Intelligent construction and cost analysis." Constr. Mgmt. and Economics J., 4.
-
(1986)
Constr. Mgmt. and Economics J.
, pp. 4
-
-
Gray, C.1
-
15
-
-
0029189787
-
Partnering and alliances: Theory and practice
-
Green, R. L. (1995). "Partnering and alliances: Theory and practice." Offshore Europe Conf.
-
(1995)
Offshore Europe Conf.
-
-
Green, R.L.1
-
16
-
-
0006412974
-
From symbol to form: A framework for conceptual design
-
Gorti, S., Sriram, D., and Ram, D. (1996). "From symbol to form: A framework for conceptual design." J. CAD, 28(11), 1996.
-
(1996)
J. CAD
, vol.28
, Issue.11
, pp. 1996
-
-
Gorti, S.1
Sriram, D.2
Ram, D.3
-
17
-
-
0006450940
-
Managing major projects, a new approach to reduce cost and time
-
Haugstad, T. (1996). "Managing major projects, a new approach to reduce cost and time." Proc., 13th World Congr. on Proj. Mgmt., Vol. 2, 555-562.
-
(1996)
Proc., 13th World Congr. on Proj. Mgmt.
, vol.2
, pp. 555-562
-
-
Haugstad, T.1
-
18
-
-
0006409794
-
The contract engine a superior mechanism for the alignment of project goals with corporate objectives
-
Hetland, P. W. (1996). "The contract engine a superior mechanism for the alignment of project goals with corporate objectives." Proc., IPMA World Congr. on Proj. Mgmt., Vol. 2, 737-746.
-
(1996)
Proc., IPMA World Congr. on Proj. Mgmt.
, vol.2
, pp. 737-746
-
-
Hetland, P.W.1
-
19
-
-
0006444305
-
The international research programme on the management of engineering and construction projects
-
Hobbs, B., and Miller, R. (1998). "The international research programme on the management of engineering and construction projects." Proc., 14th World Congr. on Proj. Mgmt., Vol. 1, 302-310.
-
(1998)
Proc., 14th World Congr. on Proj. Mgmt.
, vol.1
, pp. 302-310
-
-
Hobbs, B.1
Miller, R.2
-
21
-
-
0006456802
-
-
Interactive Visualizer. (1999). "Georgia Tech." http://www.gatech. edu/.
-
(1999)
-
-
-
22
-
-
0006412975
-
-
Intergraph. (1999). "Intergraph's schedule review." http://www. intergraph.com/visualization/schedrev.asp.
-
(1999)
Intergraph's Schedule Review
-
-
-
24
-
-
0028134454
-
Integrated system environment using an object-oriented project model with multiple-views
-
ASCE, New York
-
Ito, K. (1994). "Integrated system environment using an object-oriented project model with multiple-views." Proc., Computing in Civ. Engrg., Vol. 2, ASCE, New York, 1204-1211.
-
(1994)
Proc., Computing in Civ. Engrg.
, vol.2
, pp. 1204-1211
-
-
Ito, K.1
-
25
-
-
0006505275
-
Linking knowledge-based systems to CAD design data with an object oriented building product model
-
Stanford University, Stanford, Calif.
-
Ito, K., Ueno, Y., Levitt, R., and Darwiche, A. (1989). "Linking knowledge-based systems to CAD design data with an object oriented building product model." CIFE Tech. Rep. No. 17, Stanford University, Stanford, Calif.
-
(1989)
CIFE Tech. Rep. No. 17
-
-
Ito, K.1
Ueno, Y.2
Levitt, R.3
Darwiche, A.4
-
26
-
-
0030270521
-
Time and priority allocation scheduling technique for projects
-
Jaafari, A. (1996). "Time and priority allocation scheduling technique for projects." Int. J. Proj. Mgmt., 14(5), 289-299.
-
(1996)
Int. J. Proj. Mgmt.
, vol.14
, Issue.5
, pp. 289-299
-
-
Jaafari, A.1
-
27
-
-
0001215891
-
Concurrent construction and life cycle project management
-
Jaafari, A. (1997). "Concurrent construction and life cycle project management." J. Constr. Engrg. and Mgmt., ASCE, 123(4), 427-436.
-
(1997)
J. Constr. Engrg. and Mgmt., ASCE
, vol.123
, Issue.4
, pp. 427-436
-
-
Jaafari, A.1
-
28
-
-
0032143750
-
Towards smart project management information systems
-
Jaafari, A., and Manivong, K. (1998). "Towards smart project management information systems." Int. J. Proj. Mgmt., 16(4), 249-265.
-
(1998)
Int. J. Proj. Mgmt.
, vol.16
, Issue.4
, pp. 249-265
-
-
Jaafari, A.1
Manivong, K.2
-
29
-
-
0001936222
-
Integration of soft issues into a life cycle project management system
-
Jaafari, A., and Vlasic, A. (1999). "Integration of soft issues into a life cycle project management system." Proc., Constr. Process Re-Engrg., 211-223.
-
(1999)
Proc., Constr. Process Re-Engrg.
, pp. 211-223
-
-
Jaafari, A.1
Vlasic, A.2
-
30
-
-
0000169431
-
Value-oriented management of project uncertainties
-
Jordanger, I. (1998). "Value-oriented management of project uncertainties." Proc., 14th World Congr. on Proj. Mgmt., Vol. 2, 813-821.
-
(1998)
Proc., 14th World Congr. on Proj. Mgmt.
, vol.2
, pp. 813-821
-
-
Jordanger, I.1
-
31
-
-
0006444306
-
ISICAD: Interactive system for integrating CAD and computer-based construction systems
-
Kartam, N. (1994). "ISICAD: Interactive system for integrating CAD and computer-based construction systems." Microcomp. in Civ. Engrg., 9, 41-51.
-
(1994)
Microcomp. in Civ. Engrg.
, vol.9
, pp. 41-51
-
-
Kartam, N.1
-
32
-
-
0003457608
-
-
Van Nostrand Reinhold, New York
-
Kerzner, H. (1992). Project management, a systems approach to planning, scheduling, and controlling, 4th Ed., Van Nostrand Reinhold, New York.
-
(1992)
Project Management, a Systems Approach to Planning, Scheduling, and Controlling, 4th Ed.
-
-
Kerzner, H.1
-
34
-
-
0030211891
-
Simultaneous management: The key to excellence in capital projects
-
Laufer, A., Denker, G. R., and Shenhar, A. J. (1996). "Simultaneous management: The key to excellence in capital projects." Int. J. Proj. Mgmt., 14(4), 189-199.
-
(1996)
Int. J. Proj. Mgmt.
, vol.14
, Issue.4
, pp. 189-199
-
-
Laufer, A.1
Denker, G.R.2
Shenhar, A.J.3
-
35
-
-
0028255498
-
Geometric-based reasoning system for project planning
-
Morad, A. A., and Beliveau, Y. J. (1994). "Geometric-based reasoning system for project planning." J. Comp. in Civ. Engrg., ASCE, 8(1), 52-71.
-
(1994)
J. Comp. in Civ. Engrg., ASCE
, vol.8
, Issue.1
, pp. 52-71
-
-
Morad, A.A.1
Beliveau, Y.J.2
-
36
-
-
0006451990
-
-
OSCON. (1999). Salford University, http://www.salford.ac.uk/.
-
(1999)
-
-
-
37
-
-
0029182525
-
Design rationale for computer-supported confict mitigation
-
Peña-Mora, F. Sriram, D., and Logcher, R. (1995). "Design rationale for computer-supported confict mitigation." J. Comp. in Civ. Engrg., ASCE, 9(1), 57-72.
-
(1995)
J. Comp. in Civ. Engrg., ASCE
, vol.9
, Issue.1
, pp. 57-72
-
-
Peña-Mora, F.1
Sriram, D.2
Logcher, R.3
-
38
-
-
0006475751
-
-
PlantSpace. (1997). "PlantSpace schedule simulator." http://www. bentley.com/products/peproducts/pdfs/schsim.pdf.
-
(1997)
-
-
-
40
-
-
84945715931
-
The MIT DICE project
-
January
-
Sriram, D., and Logcher, R. (1993). "The MIT DICE project." IEEE Comp., January, 64-65.
-
(1993)
IEEE Comp.
, pp. 64-65
-
-
Sriram, D.1
Logcher, R.2
-
41
-
-
4043112974
-
GNOMES: An object-oriented non-manifold geometric engine
-
November
-
Sriram, D., Ram, D., Wong, A., and Li, H. (1995). "GNOMES: An object-oriented non-manifold geometric engine." J. CAD, November.
-
(1995)
J. CAD
-
-
Sriram, D.1
Ram, D.2
Wong, A.3
Li, H.4
-
43
-
-
0029192304
-
Re-engineering the alliances and partnerships
-
Straughen, M. (1995). "Re-engineering the alliances and partnerships." Proc., Offshore Europe Conf., 191-195.
-
(1995)
Proc., Offshore Europe Conf.
, pp. 191-195
-
-
Straughen, M.1
-
44
-
-
0006451795
-
-
Timberline Software Corp.
-
Timberline. (1990). "Precision estimating." Timberline Software Corp.
-
(1990)
Precision Estimating
-
-
-
45
-
-
0006451991
-
Knowledge-based planning for construction projects
-
Dept. of Civ. Engrg., Carnegie Mellon University, Pittsburgh
-
Zozaya, G. C., and Hendrickson, C. (1988). "Knowledge-based planning for construction projects." Tech. Rep. No. R-88-170, Dept. of Civ. Engrg., Carnegie Mellon University, Pittsburgh.
-
(1988)
Tech. Rep. No. R-88-170
-
-
Zozaya, G.C.1
Hendrickson, C.2
|