-
2
-
-
0029375614
-
An evaluation of the tandem configuration automated guided vehicle system
-
Bischak D.P., and Stevens K.B. An evaluation of the tandem configuration automated guided vehicle system Production Planning and Control v6 n5 1995 438 444
-
(1995)
Production Planning and Control
, vol.6
, Issue.5
, pp. 438-444
-
-
Bischak, D.P.1
Stevens, K.B.2
-
3
-
-
0002688837
-
Tandem configurations for AGV systems offer simplicity and flexibility
-
Bozer Y.A., and Srinivasan M.M. Tandem configurations for AGV systems offer simplicity and flexibility Industrial Engg. v21 n2 1989 23 27
-
(1989)
Industrial Engg.
, vol.21
, Issue.2
, pp. 23-27
-
-
Bozer, Y.A.1
Srinivasan, M.M.2
-
4
-
-
0026117415
-
Tandem configurations for automated guided vehicle systems and the analysis of single vehicle loops
-
Bozer Y.A., and Srinivasan M.M. Tandem configurations for automated guided vehicle systems and the analysis of single vehicle loops IIE Trans. v23 n1 1991 72 82
-
(1991)
IIE Trans.
, vol.23
, Issue.1
, pp. 72-82
-
-
Bozer, Y.A.1
Srinivasan, M.M.2
-
5
-
-
0026966782
-
Tandem AGV systems: A partitioning algorithm and performance comparison with conventional AGV systems
-
Bozer Y.A., and Srinivasan M.M. Tandem AGV systems: a partitioning algorithm and performance comparison with conventional AGV systems European Journal of Operational Research v63 n2 1992 173 191
-
(1992)
European Journal of Operational Research
, vol.63
, Issue.2
, pp. 173-191
-
-
Bozer, Y.A.1
Srinivasan, M.M.2
-
6
-
-
0040028622
-
Modeling and analysis of tandem AGV systems using generalized stochastic Petrinets
-
Castillo I., Reyes S.A., and Peters B.A. Modeling and analysis of tandem AGV systems using generalized stochastic Petrinets Journal of Manufacturing Systems v20 n4 2001 236 249
-
(2001)
Journal of Manufacturing Systems
, vol.20
, Issue.4
, pp. 236-249
-
-
Castillo, I.1
Reyes, S.A.2
Peters, B.A.3
-
7
-
-
0028490593
-
Traditional and tandem AGV system layouts - A simulation study
-
Choi H.G., Kwon H.J., and Lee J. Traditional and tandem AGV system layouts - a simulation study Simulation v63 n2 1994 85 93
-
(1994)
Simulation
, vol.63
, Issue.2
, pp. 85-93
-
-
Choi, H.G.1
Kwon, H.J.2
Lee, J.3
-
8
-
-
0035895120
-
Analysis of automated guided vehicle configurations in flexible manufacturing systems
-
Farling B.E., Mosier C.T., and Mahmoodi F. Analysis of automated guided vehicle configurations in flexible manufacturing systems Int'l Journal of Production Research v39 n18 2001 4239 4260
-
(2001)
Int'l Journal of Production Research
, vol.39
, Issue.18
, pp. 4239-4260
-
-
Farling, B.E.1
Mosier, C.T.2
Mahmoodi, F.3
-
9
-
-
0043142194
-
Operational decisions in AGV-served flowshop loops: Fleet sizing and decomposition
-
Hall N.G., Sriskandarajah C., and Ganesharajah T. Operational decisions in AGV-served flowshop loops: Fleet sizing and decomposition Annals of Operations Research v107 2001 189 209
-
(2001)
Annals of Operations Research
, vol.107
, pp. 189-209
-
-
Hall, N.G.1
Sriskandarajah, C.2
Ganesharajah, T.3
-
10
-
-
1342308547
-
A machine-to-loop assignment and layout design methodology for tandem AGV systems with multiple-load vehicles
-
Ho Y.C., and Hsieh P.F. A machine-to-loop assignment and layout design methodology for tandem AGV systems with multiple-load vehicles Int'l Journal of Production Research v42 n4 2004 801 832
-
(2004)
Int'l Journal of Production Research
, vol.42
, Issue.4
, pp. 801-832
-
-
Ho, Y.C.1
Hsieh, P.F.2
-
11
-
-
0031099520
-
Heuristic algorithm for the design of facilities layout and AGV routes in tandem AGV systems
-
Hsieh L.F., and Sha D.Y. Heuristic algorithm for the design of facilities layout and AGV routes in tandem AGV systems Int'l Journal of Industrial Engg.-Applications and Practice v4 n1 1997 52 61
-
(1997)
Int'l Journal of Industrial Engg.-Applications and Practice
, vol.4
, Issue.1
, pp. 52-61
-
-
Hsieh, L.F.1
Sha, D.Y.2
-
12
-
-
0031118606
-
Design of material transportation system for tandem automated guided vehicle systems
-
Huang C. Design of material transportation system for tandem automated guided vehicle systems Int'l Journal of Production Research v35 n4 1997 943 953
-
(1997)
Int'l Journal of Production Research
, vol.35
, Issue.4
, pp. 943-953
-
-
Huang, C.1
-
15
-
-
0344035520
-
An object-oriented simulation and extension for tandem AGV systems
-
Kim K.S., and Jae M. An object-oriented simulation and extension for tandem AGV systems Int'l Journal of Advanced Mfg. Technology v22 n5-6 2003 441 455
-
(2003)
Int'l Journal of Advanced Mfg. Technology
, vol.22
, Issue.56
, pp. 441-455
-
-
Kim, K.S.1
Jae, M.2
-
17
-
-
0028381246
-
A load-routeing problem in a tandem configuration automated guided-vehicle system
-
Lin J.T., Chang C.C.K., and Liu W.C. A load-routeing problem in a tandem configuration automated guided-vehicle system Int'l Journal of Production Research v32 n2 1994 411 427
-
(1994)
Int'l Journal of Production Research
, vol.32
, Issue.2
, pp. 411-427
-
-
Lin, J.T.1
Chang, C.C.K.2
Liu, W.C.3
-
18
-
-
0001130388
-
An algorithm for routeing control of a tandem automated guided vehicle system
-
Lin J.T., and Dgen P.K. An algorithm for routeing control of a tandem automated guided vehicle system Int'l Journal of Production Research v32 n12 1994 2735 2750
-
(1994)
Int'l Journal of Production Research
, vol.32
, Issue.12
, pp. 2735-2750
-
-
Lin, J.T.1
Dgen, P.K.2
-
19
-
-
0032648414
-
A heuristic approach to determine bidirectional flow-path for AGV systems
-
Liu F.H.F., and Chen J.T. A heuristic approach to determine bidirectional flow-path for AGV systems Int'l Journal of Industrial Engg. - Theory v6 n2 1999 171 181
-
(1999)
Int'l Journal of Industrial Engg. - Theory
, vol.6
, Issue.2
, pp. 171-181
-
-
Liu, F.H.F.1
Chen, J.T.2
-
20
-
-
0035837939
-
Real-time deadlock-free control strategy for single multi-load automated guided vehicle on a job shop manufacturing system
-
Liu F.H., and Hung P.C. Real-time deadlock-free control strategy for single multi-load automated guided vehicle on a job shop manufacturing system Int'l Journal of Production Research v39 n7 2001 1323 1342
-
(2001)
Int'l Journal of Production Research
, vol.39
, Issue.7
, pp. 1323-1342
-
-
Liu, F.H.1
Hung, P.C.2
-
21
-
-
0033320202
-
The effects of scheduling rules and routing flexibility on the performance of a random flexible manufacturing system
-
Mahmoodi F., Mosier C.T., and Morgan J.R. The effects of scheduling rules and routing flexibility on the performance of a random flexible manufacturing system Int'l Journal of Flexible Mfg. Systems v11 n3 1999 271 289
-
(1999)
Int'l Journal of Flexible Mfg. Systems
, vol.11
, Issue.3
, pp. 271-289
-
-
Mahmoodi, F.1
Mosier, C.T.2
Morgan, J.R.3
-
22
-
-
0032123167
-
An heuristic for configuring a mixed uni/bidirectional flow path for an AGV system
-
Rajotia S., Shanker K., and Batra J.L. An heuristic for configuring a mixed uni/bidirectional flow path for an AGV system Int'l Journal of Production Research v36 n7 1998 1779 1799
-
(1998)
Int'l Journal of Production Research
, vol.36
, Issue.7
, pp. 1779-1799
-
-
Rajotia, S.1
Shanker, K.2
Batra, J.L.3
-
24
-
-
0033741825
-
Conflict resolution in AGV systems
-
Reveliotis S.A. Conflict resolution in AGV systems IIE Trans. v32 n7 2000 647 659
-
(2000)
IIE Trans.
, vol.32
, Issue.7
, pp. 647-659
-
-
Reveliotis, S.A.1
-
25
-
-
0030533942
-
Tandem configuration automated guided vehicle systems: A comparative study
-
Ross E.A., Mahmoodi F., and Mosier C.T. Tandem configuration automated guided vehicle systems: a comparative study Decision Sciences v27 n1 1996 81 102
-
(1996)
Decision Sciences
, vol.27
, Issue.1
, pp. 81-102
-
-
Ross, E.A.1
Mahmoodi, F.2
Mosier, C.T.3
-
26
-
-
0346507697
-
Use of timed petri net and activity cycle diagram methodologies for modelling tandem AGVs in FMSs and their performance evaluation
-
Tiwari M.K., Chandrasekaran M., and Mohanty R.P. Use of timed petri net and activity cycle diagram methodologies for modelling tandem AGVs in FMSs and their performance evaluation Int'l Journal of Computer Integrated Mfg. v14 n4 2001 399 408
-
(2001)
Int'l Journal of Computer Integrated Mfg.
, vol.14
, Issue.4
, pp. 399-408
-
-
Tiwari, M.K.1
Chandrasekaran, M.2
Mohanty, R.P.3
-
27
-
-
0042851798
-
A study of the tandem loop with multiple vehicles configuration for automated guided vehicle systems
-
Ventura J.A., and Lee C.L. A study of the tandem loop with multiple vehicles configuration for automated guided vehicle systems Journal of Manufacturing Systems v20 n3 2001 153 165
-
(2001)
Journal of Manufacturing Systems
, vol.20
, Issue.3
, pp. 153-165
-
-
Ventura, J.A.1
Lee, C.L.2
-
28
-
-
0028407569
-
Performance evaluation of tandem and conventional AGV systems using generalized stochastic Petri nets
-
Wang H.P.B., and Hafeez S.A. Performance evaluation of tandem and conventional AGV systems using generalized stochastic Petri nets Int'l Journal of Production Research v32 n4 1994 917 932
-
(1994)
Int'l Journal of Production Research
, vol.32
, Issue.4
, pp. 917-932
-
-
Wang, H.P.B.1
Hafeez, S.A.2
-
29
-
-
0042872766
-
Design of a variable path tandem layout for automated guided vehicle systems
-
Yu W., and Egbelu P.J. Design of a variable path tandem layout for automated guided vehicle systems Journal of Manufacturing Systems v20 n5 2001 305 319
-
(2001)
Journal of Manufacturing Systems
, vol.20
, Issue.5
, pp. 305-319
-
-
Yu, W.1
Egbelu, P.J.2
|