-
1
-
-
0003975005
-
-
New York: John Wiley and Sons
-
J.A. Tompkins, J.A. White, Y.A. Bozer, E.H. Frazelle, J.M.A. Tanchoco, and J. Trevino, Facilities Planning, 2nd ed. (New York: John Wiley and Sons, 1996).
-
(1996)
Facilities Planning, 2nd Ed.
-
-
Tompkins, J.A.1
White, J.A.2
Bozer, Y.A.3
Frazelle, E.H.4
Tanchoco, J.M.A.5
Trevino, J.6
-
2
-
-
0026966782
-
Tandem AGV systems: A partitioning algorithm and performance comparison with conventional AGV systems
-
Y.A. Bozer and M.M. Srinivasan, "Tandem AGV Systems: A Partitioning Algorithm and Performance Comparison with Conventional AGV Systems," European Journal of Operational Research (v63, n2, 1992), pp173-192.
-
(1992)
European Journal of Operational Research
, vol.63
, Issue.2
, pp. 173-192
-
-
Bozer, Y.A.1
Srinivasan, M.M.2
-
3
-
-
0029206206
-
Network design models for discrete material flow systems: A literature review
-
D. Sinriech, "Network Design Models for Discrete Material Flow Systems: A Literature Review," Int'l Journal of Advanced Mfg. Technology (v10, 1995), pp277-291.
-
(1995)
Int'l Journal of Advanced Mfg. Technology
, vol.10
, pp. 277-291
-
-
Sinriech, D.1
-
4
-
-
0026938781
-
Impact of empty vehicle flow on performance of single-loop AGV systems
-
D. Sinriech and J.M.A. Tanchoco, "Impact of Empty Vehicle Flow on Performance of Single-Loop AGV Systems," Int'l Journal of Production Research (v30, n10, 1992), pp2237-2252.
-
(1992)
Int'l Journal of Production Research
, vol.30
, Issue.10
, pp. 2237-2252
-
-
Sinriech, D.1
Tanchoco, J.M.A.2
-
5
-
-
0021423836
-
Characterization of automatic guided vehicle dispatching rules
-
P.J. Egbelu and J.M.A. Tanchoco, "Characterization of Automatic Guided Vehicle Dispatching Rules," Int'l Journal of Production Research (v22, n3, 1984), pp359-374.
-
(1984)
Int'l Journal of Production Research
, vol.22
, Issue.3
, pp. 359-374
-
-
Egbelu, P.J.1
Tanchoco, J.M.A.2
-
6
-
-
0030533942
-
Tandem configuration in automated guided vehicle systems: A comparative study
-
E.A. Ross, F. Mahmoodi, and C.T. Mosier, "Tandem Configuration in Automated Guided Vehicle Systems: A Comparative Study," Decision Sciences (v27, n1, 1996), pp81-102.
-
(1996)
Decision Sciences
, vol.27
, Issue.1
, pp. 81-102
-
-
Ross, E.A.1
Mahmoodi, F.2
Mosier, C.T.3
-
7
-
-
0030169650
-
Dynamic relative positioning of AGVs in a loop layout to minimize mean response time
-
S.H. Chang and P.J. Egbelu, "Dynamic Relative Positioning of AGVs in a Loop Layout to Minimize Mean Response Time," Int'l Journal of Production Research (v34, n6, 1996), pp1655-1673.
-
(1996)
Int'l Journal of Production Research
, vol.34
, Issue.6
, pp. 1655-1673
-
-
Chang, S.H.1
Egbelu, P.J.2
-
9
-
-
0041908825
-
Optimal dwell point location of automated guided vehicles to minimize the mean weighted response time in a loop layout
-
to appear
-
C. Lee and J.A. Ventura, "Optimal Dwell Point Location of Automated Guided Vehicles to Minimize the Mean Weighted Response Time in a Loop Layout," Int'l Journal of Production Research (to appear).
-
Int'l Journal of Production Research
-
-
Lee, C.1
Ventura, J.A.2
-
10
-
-
0027702306
-
Positioning of automated guided vehicles in a loop layout to improve response time
-
P.J. Egbelu, "Positioning of Automated Guided Vehicles in a Loop Layout to Improve Response Time," European Journal of Operational Research (v71, n1, 1993), pp32-44.
-
(1993)
European Journal of Operational Research
, vol.71
, Issue.1
, pp. 32-44
-
-
Egbelu, P.J.1
-
12
-
-
0031200370
-
Integrated facility layout and material handling system design in semiconductor fabrication facilities
-
B.A. Peters and T. Yang, "Integrated Facility Layout and Material Handling System Design in Semiconductor Fabrication Facilities," IEEE Trans. on Semiconductor Mfg. (v10, n3, 1997), pp360-369.
-
(1997)
IEEE Trans. on Semiconductor Mfg.
, vol.10
, Issue.3
, pp. 360-369
-
-
Peters, B.A.1
Yang, T.2
-
15
-
-
0026898533
-
Experimental investigation of FMS machine and AGV scheduling rules against the mean flow-time criterion
-
I. Sabuncuoglu and D.L. Hommertzheim, "Experimental Investigation of FMS Machine and AGV Scheduling Rules Against the Mean Flow-Time Criterion," Int'l Journal of Production Research (v30, n7, 1992), pp1617-1635.
-
(1992)
Int'l Journal of Production Research
, vol.30
, Issue.7
, pp. 1617-1635
-
-
Sabuncuoglu, I.1
Hommertzheim, D.L.2
-
16
-
-
0041908824
-
-
Charlotte, NC: AGV Products
-
AGV Products, www.agvp.com/standardagvs.htm (Charlotte, NC: AGV Products, 2000).
-
(2000)
-
-
|