메뉴 건너뛰기




Volumn 20, Issue 3, 2001, Pages 153-165

A study of the tandem loop with multiple vehicles configuration for automated guided vehicle systems

Author keywords

Automated Guided Vehicle Systems; Dwell Point; Dynamic Programming; Guide Path Layout; Material Handling

Indexed keywords


EID: 0042851798     PISSN: 02786125     EISSN: None     Source Type: Journal    
DOI: 10.1016/s0278-6125(01)80037-6     Document Type: Article
Times cited : (23)

References (18)
  • 2
    • 0026966782 scopus 로고
    • Tandem AGV systems: A partitioning algorithm and performance comparison with conventional AGV systems
    • Y.A. Bozer and M.M. Srinivasan, "Tandem AGV Systems: A Partitioning Algorithm and Performance Comparison with Conventional AGV Systems," European Journal of Operational Research (v63, n2, 1992), pp173-192.
    • (1992) European Journal of Operational Research , vol.63 , Issue.2 , pp. 173-192
    • Bozer, Y.A.1    Srinivasan, M.M.2
  • 3
    • 0029206206 scopus 로고
    • Network design models for discrete material flow systems: A literature review
    • D. Sinriech, "Network Design Models for Discrete Material Flow Systems: A Literature Review," Int'l Journal of Advanced Mfg. Technology (v10, 1995), pp277-291.
    • (1995) Int'l Journal of Advanced Mfg. Technology , vol.10 , pp. 277-291
    • Sinriech, D.1
  • 4
    • 0026938781 scopus 로고
    • Impact of empty vehicle flow on performance of single-loop AGV systems
    • D. Sinriech and J.M.A. Tanchoco, "Impact of Empty Vehicle Flow on Performance of Single-Loop AGV Systems," Int'l Journal of Production Research (v30, n10, 1992), pp2237-2252.
    • (1992) Int'l Journal of Production Research , vol.30 , Issue.10 , pp. 2237-2252
    • Sinriech, D.1    Tanchoco, J.M.A.2
  • 5
    • 0021423836 scopus 로고
    • Characterization of automatic guided vehicle dispatching rules
    • P.J. Egbelu and J.M.A. Tanchoco, "Characterization of Automatic Guided Vehicle Dispatching Rules," Int'l Journal of Production Research (v22, n3, 1984), pp359-374.
    • (1984) Int'l Journal of Production Research , vol.22 , Issue.3 , pp. 359-374
    • Egbelu, P.J.1    Tanchoco, J.M.A.2
  • 6
    • 0030533942 scopus 로고    scopus 로고
    • Tandem configuration in automated guided vehicle systems: A comparative study
    • E.A. Ross, F. Mahmoodi, and C.T. Mosier, "Tandem Configuration in Automated Guided Vehicle Systems: A Comparative Study," Decision Sciences (v27, n1, 1996), pp81-102.
    • (1996) Decision Sciences , vol.27 , Issue.1 , pp. 81-102
    • Ross, E.A.1    Mahmoodi, F.2    Mosier, C.T.3
  • 7
    • 0030169650 scopus 로고    scopus 로고
    • Dynamic relative positioning of AGVs in a loop layout to minimize mean response time
    • S.H. Chang and P.J. Egbelu, "Dynamic Relative Positioning of AGVs in a Loop Layout to Minimize Mean Response Time," Int'l Journal of Production Research (v34, n6, 1996), pp1655-1673.
    • (1996) Int'l Journal of Production Research , vol.34 , Issue.6 , pp. 1655-1673
    • Chang, S.H.1    Egbelu, P.J.2
  • 9
    • 0041908825 scopus 로고    scopus 로고
    • Optimal dwell point location of automated guided vehicles to minimize the mean weighted response time in a loop layout
    • to appear
    • C. Lee and J.A. Ventura, "Optimal Dwell Point Location of Automated Guided Vehicles to Minimize the Mean Weighted Response Time in a Loop Layout," Int'l Journal of Production Research (to appear).
    • Int'l Journal of Production Research
    • Lee, C.1    Ventura, J.A.2
  • 10
    • 0027702306 scopus 로고
    • Positioning of automated guided vehicles in a loop layout to improve response time
    • P.J. Egbelu, "Positioning of Automated Guided Vehicles in a Loop Layout to Improve Response Time," European Journal of Operational Research (v71, n1, 1993), pp32-44.
    • (1993) European Journal of Operational Research , vol.71 , Issue.1 , pp. 32-44
    • Egbelu, P.J.1
  • 12
    • 0031200370 scopus 로고    scopus 로고
    • Integrated facility layout and material handling system design in semiconductor fabrication facilities
    • B.A. Peters and T. Yang, "Integrated Facility Layout and Material Handling System Design in Semiconductor Fabrication Facilities," IEEE Trans. on Semiconductor Mfg. (v10, n3, 1997), pp360-369.
    • (1997) IEEE Trans. on Semiconductor Mfg. , vol.10 , Issue.3 , pp. 360-369
    • Peters, B.A.1    Yang, T.2
  • 15
    • 0026898533 scopus 로고
    • Experimental investigation of FMS machine and AGV scheduling rules against the mean flow-time criterion
    • I. Sabuncuoglu and D.L. Hommertzheim, "Experimental Investigation of FMS Machine and AGV Scheduling Rules Against the Mean Flow-Time Criterion," Int'l Journal of Production Research (v30, n7, 1992), pp1617-1635.
    • (1992) Int'l Journal of Production Research , vol.30 , Issue.7 , pp. 1617-1635
    • Sabuncuoglu, I.1    Hommertzheim, D.L.2
  • 16
    • 0041908824 scopus 로고    scopus 로고
    • Charlotte, NC: AGV Products
    • AGV Products, www.agvp.com/standardagvs.htm (Charlotte, NC: AGV Products, 2000).
    • (2000)


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.