-
1
-
-
0001669310
-
Automating planning and scheduling of shuttle payload operations, "
-
S. Chien, G. Rabideau, J. Willis, and T. Mann, "Automating Planning and Scheduling of Shuttle Payload Operations, " Artificial I ntelligence Journal, 114 (1999) 239-255.
-
(1999)
Artificial i Ntelligence Journal
, vol.114
, pp. 239-255
-
-
Chien, S.1
Rabideau, G.2
Willis, J.3
Mann, T.4
-
2
-
-
84937443085
-
-
NASA Ames & JPL Remote Agent Experiment Web Page
-
NASA Ames & JPL, Remote Agent Experiment Web Page, http://rax.arc.nasa.gov/, 1999.
-
(1999)
-
-
-
3
-
-
0030232147
-
Automatically configuring constraint satisfaction programs: A case study. "
-
S. Minton "Automatically Configuring Constraint Satisfaction Programs: A Case Study. " Constraints 1:1(7-43).1996.
-
(1996)
Constraints
, vol.1
, Issue.7-43
, pp. 1
-
-
Minton, S.1
-
4
-
-
0002292918
-
Scheduling andresc heduling with iterative repair
-
Morgan Kaufman, San Francisco
-
M. Zweben, B. Daun, E. Davis, andM. Deale, " Scheduling andResc heduling with Iterative Repair," in Intelligent Scheduling, Morgan Kaufman, San Francisco, 1994.
-
(1994)
Intelligent Scheduling
-
-
Zweben, M.1
Daun, B.2
Davis, E.3
Deale, M.4
-
5
-
-
0003240238
-
Aspen-Automating space mission operations using automatedplanning andsc heduling
-
Toulouse, France, June 2000
-
S. Chien, G. Rabideau, R. Knight, R. Sherwood, B. Engelhardt, D. Mutz, T. Estlin, B. Smith, F. Fisher, T. Barrett, G. Stebbins, D. Tran , " ASPEN-Automating Space Mission Operations using AutomatedPlanning andSc heduling," Space Operations 2000, Toulouse, France, June 2000.
-
(2000)
Space Operations
-
-
Chien, S.1
Rabideau, G.2
Knight, R.3
Sherwood, R.4
Engelhardt, B.5
Mutz, D.6
Estlin, T.7
Smith, B.8
Fisher, F.9
Barrett, T.10
Stebbins, G.11
Tran, D.12
-
6
-
-
0002753338
-
Opis: An architecture and methodology for reactive scheduling
-
S . Smith, " OPIS: An Architecture and Methodology for Reactive Scheduling," in Intelligent Scheduling, Morgan Kaufman, 1994.
-
(1994)
Intelligent Scheduling, Morgan Kaufman
-
-
Smith, S.1
-
7
-
-
85136959714
-
Using iterative repair to improve responsiveness of planning andsc heduling
-
Breckenridge, CO April
-
S. Chien, R. Knight, A. Stechert, R. Sherwood, and G. Rabideau, " Using Iterative Repair to Improve Responsiveness of Planning andSc heduling," Proc. 5th International Conference on Artificial Intelligence Planning and Scheduling, Breckenridge, CO, April 2000.
-
(2000)
Proc. 5th International Conference on Artificial Intelligence Planning and Scheduling
-
-
Chien, S.1
Knight, R.2
Stechert, A.3
Sherwood, R.4
Rabideau, G.5
-
8
-
-
0003305989
-
Iterative repair planning for spacecraft operations in the aspen system
-
Noordwijk, The Netherlands June
-
G. Rabideau, R. Knight, S. Chien, A. Fukunaga, A. Govindjee, " Iterative Repair Planning for Spacecraft Operations in the ASPEN System," Int Symp on Artificial Intelligence Robotics and Aut. in Space (ISAIRAS), Noordwijk, The Netherlands, June 1999.
-
(1999)
Int Symp on Artificial Intelligence Robotics and Aut. in Space (ISAIRAS
-
-
Rabideau, G.1
Knight, R.2
Chien, S.3
Fukunaga, A.4
Govindjee, A.5
-
9
-
-
84942944881
-
Planning in interplanetary space: Theory andpractice
-
Breckenridge, CO. April
-
Jonsson, P. Morris, N. Muscettola, K. Rajan andB. Smith, " Planning in Interplanetary Space: Theory andPractice," Proceedings of the Fifth International Conference on Artificial Intelligence Planning Systems. Breckenridge, CO. April, 2000.
-
(2000)
Proceedings of the Fifth International Conference on Artificial Intelligence Planning Systems
-
-
Jonsson Morris, P.1
Muscettola, N.2
Rajan, K.3
Smith, B.4
-
10
-
-
0031378529
-
Rocky 7: A next generation mars rover prototype
-
December
-
R. Volpe, J. Balaram, T. Ohm, andR. Ivlev, " Rocky 7: A Next Generation Mars Rover Prototype," Journal of Advanced Robotics, 11(4), December 1997.
-
(1997)
Journal of Advanced Robotics
, vol.11
, pp. 4
-
-
Volpe, R.1
Balaram, J.2
Ohm, T.3
Ivlev, R.4
-
11
-
-
0000775057
-
Long range science rover (rocky 7) mojave desert fieldt ests
-
Tokyo, Japan, July
-
S. Hayati, andR. Arvidson, " Long Range Science Rover (Rocky 7) Mojave Desert FieldT ests," Proceedings of the 1997 International Symposium on Artificial Intelligence, Robotics and Automation in Space, Tokyo, Japan, July 1997.
-
(1997)
Proceedings of the 1997 International Symposium on Artificial Intelligence, Robotics and Automation in Space
-
-
Hayati, S.1
Arvidson, R.2
-
13
-
-
0015604699
-
An effective heuristic for the traveling salesman problem, "
-
S. Lin andB. Kernighan, "An Effective Heuristic for the Traveling Salesman Problem, " Operations Research Vo l. 21, 1973.
-
(1973)
Operations Research
, vol.21
-
-
Lin, S.1
Kernighan, B.2
-
15
-
-
0003826255
-
Constructing simplifiedplans via truth criteria approximation, "
-
Chicago IL June
-
S. Chien andG. DeJong, "Constructing SimplifiedPlans via Truth Criteria Approximation, " Proceedings of the Second International Conference on Artificial Intelligence Planning Systems, Chicago, IL, June 1994, pp. 19-24.
-
(1994)
Proceedings of the Second International Conference on Artificial Intelligence Planning Systems
, pp. 19-24
-
-
Chien, S.1
Dejong, G.2
-
18
-
-
0001701566
-
Analyzing a heuristic strategy for constraint satisfaction andsc heduling
-
Morgan Kaufman, San Francisco
-
M. Johnston andS. Minton, " Analyzing a Heuristic Strategy for Constraint Satisfaction andSc heduling," in Intelligent Scheduling, Morgan Kaufman, San Francisco, 1994.
-
(1994)
Intelligent Scheduling
-
-
Johnston, M.1
Minton, S.2
-
19
-
-
0003831353
-
A planning model for agents in dynamic and unicertain real-time environments, "
-
AIPS98 Workshop, AAAI Technical Report WS-98092
-
Nareyek, "A Planning Model for Agents in Dynamic and Unicertain Real-Time Environments, " in Integrating Planning, Scheduling, and Execution in Dynamic andUncertain Environments, AIPS98 Workshop, AAAI Technical Report WS-98092.
-
Integrating Planning, Scheduling, and Execution in Dynamic AndUncertain Environments
-
-
Nareyek1
-
22
-
-
0003329810
-
Towards a framework for continuous planning and execution"
-
M. Veloso, M. Pollack, M. Cox, " Rationale-basedmonitoring for planning in dynamic environments," Proceedings Artificial Intelligence Planning Systems Conference, Pittsburgh, PA, 1998. 22. K. Myers, " Towards a Framework for Continuous Planning and Execution" , in Proceedings of the AAAI Fall Symposium on Distributed Continual Planning, 1998.
-
(1998)
Proceedings of the AAAI Fall Symposium on Distributed Continual Planning
-
-
Myers, K.1
|