메뉴 건너뛰기




Volumn 16, Issue 2, 2002, Pages 63-74

Life-cycle cost analysis using deterministic and stochastic methods: Conflicting results

Author keywords

Bridges, steel; Cost analysis; Life cycle cost; Painting; Stochastic models

Indexed keywords

COST ANALYSIS; LIFE CYCLE COSTS; STOCHASTIC MODELS;

EID: 1942427721     PISSN: 08873828     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0887-3828(2002)16:2(63)     Document Type: Article
Times cited : (35)

References (8)
  • 2
    • 0032207418 scopus 로고    scopus 로고
    • Comparative life-cycle cost analysis of underground heat distribution systems
    • Carnahan, J. V., and Marsh, C. (1998). "Comparative life-cycle cost analysis of underground heat distribution systems." J. Transp. Eng. 124(6), 594-605.
    • (1998) J. Transp. Eng. , vol.124 , Issue.6 , pp. 594-605
    • Carnahan, J.V.1    Marsh, C.2
  • 5
  • 6
    • 0030132811 scopus 로고    scopus 로고
    • Development of bridge corrosion cost model for coating maintenance
    • Tam, C. K., and Stiemer, S. F. (1996). "Development of bridge corrosion cost model for coating maintenance." J. Perform. Constr. Facil. 10(2), 47-56.
    • (1996) J. Perform. Constr. Facil. , vol.10 , Issue.2 , pp. 47-56
    • Tam, C.K.1    Stiemer, S.F.2
  • 8
    • 4544364986 scopus 로고    scopus 로고
    • Life-cycle cost analysis and maintenance plan
    • Construction Division, School of Civil Engineering, Purdue Univ., West Lafayette, Ind.
    • Zayed, T. M., and Fricker, J. D. (1999). "Life-cycle cost analysis and maintenance plan." Rep. Prepared for INDOT, Construction Division, School of Civil Engineering, Purdue Univ., West Lafayette, Ind.
    • (1999) Rep. Prepared for INDOT
    • Zayed, T.M.1    Fricker, J.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.