|
Volumn 37, Issue 4, 1999, Pages 769-791
|
A workload balancing model for determining set-up time and batch size reductions in GT flow line workcells
a b
a
IBM
(United States)
|
Author keywords
[No Author keywords available]
|
Indexed keywords
BENCHMARKING;
CELLULAR MANUFACTURING;
COMPUTER SIMULATION;
CONSTRAINT THEORY;
GROUP TECHNOLOGY;
HEURISTIC METHODS;
INVENTORY CONTROL;
MATHEMATICAL MODELS;
PROCESS CONTROL;
SCHEDULING;
STRATEGIC PLANNING;
SYSTEM STABILITY;
QUICK RESPONSE MANUFACTURING (QRM);
WORK-IN-PROCESS (WIP) INVENTORY LEVELS;
JUST IN TIME PRODUCTION;
|
EID: 0033101727
PISSN: 00207543
EISSN: 1366588X
Source Type: Journal
DOI: 10.1080/002075499191517 Document Type: Article |
Times cited : (9)
|
References (14)
|