메뉴 건너뛰기




Volumn 19, Issue 2, 2004, Pages 165-178

One-operator, two-machine open shop and flow shop problems with setup times for machines and weighted number of tardy jobs objective

Author keywords

Computational complexity; One operator; Pseudopolynomial algorithm; Scheduling; Two machine

Indexed keywords

ALGORITHMS; COMPUTATIONAL COMPLEXITY; INTEGER PROGRAMMING; MATHEMATICAL MODELS; MATHEMATICAL OPERATORS; POLYNOMIALS; PROBLEM SOLVING; SCHEDULING;

EID: 1842764955     PISSN: 10556788     EISSN: None     Source Type: Journal    
DOI: 10.1080/10556780410001657653     Document Type: Article
Times cited : (9)

References (18)
  • 2
    • 1842772403 scopus 로고    scopus 로고
    • PhD Thesis, Department of Management Sciences, University of Waterloo
    • M.F. Baki (1999). Some Problems in One-Operator Scheduling. PhD Thesis, Department of Management Sciences, University of Waterloo.
    • (1999) Some Problems in One-operator Scheduling
    • Baki, M.F.1
  • 3
    • 1842671669 scopus 로고    scopus 로고
    • One-operator, two-machine open shop and flow shop scheduling with setup times for machines and maximum lateness objective
    • to appear
    • M.F. Baki and R.G. Vickson (2003). One-operator, two-machine open shop and flow shop scheduling with setup times for machines and maximum lateness objective. INFOR (to appear).
    • (2003) INFOR
    • Baki, M.F.1    Vickson, R.G.2
  • 4
    • 0024031525 scopus 로고
    • Concurrent routing, sequencing, and setups for a two-machine flexible manufacturing cell
    • E.J. Lee and P.B. Mirchandini (1988). Concurrent routing, sequencing, and setups for a two-machine flexible manufacturing cell. IEEE Journal of Robotics and Automation, 4(3), 256-264.
    • (1988) IEEE Journal of Robotics and Automation , vol.4 , Issue.3 , pp. 256-264
    • Lee, E.J.1    Mirchandini, P.B.2
  • 8
    • 0002844386 scopus 로고
    • Scheduling the production of components at a common facility
    • K.R. Baker (1988). Scheduling the production of components at a common facility. IIE Transactions, 20, 32-35.
    • (1988) IIE Transactions , vol.20 , pp. 32-35
    • Baker, K.R.1
  • 10
    • 0022132659 scopus 로고
    • Batching in single operation manufacturing systems
    • C. Santos and M.J. Magazine (1985). Batching in single operation manufacturing systems. Operations Research Letters, 4, 99-103.
    • (1985) Operations Research Letters , vol.4 , pp. 99-103
    • Santos, C.1    Magazine, M.J.2
  • 11
    • 0027569358 scopus 로고
    • Batching and sequencing of components at a single facility
    • R.G. Vickson, M.J. Magazine and C.A. Santos (1993). Batching and sequencing of components at a single facility. IIE Transactions, 25, 65-70.
    • (1993) IIE Transactions , vol.25 , pp. 65-70
    • Vickson, R.G.1    Magazine, M.J.2    Santos, C.A.3
  • 12
    • 0027641652 scopus 로고
    • Scheduling of products with common and product-dependents components manufactured at a single facility
    • C.S. Sung and C.K. Park (1993). Scheduling of products with common and product-dependents components manufactured at a single facility. Journal of the Operational Research Society, 44(8), 773-784.
    • (1993) Journal of the Operational Research Society , vol.44 , Issue.8 , pp. 773-784
    • Sung, C.S.1    Park, C.K.2
  • 13
    • 0029338650 scopus 로고
    • Scheduling groups of jobs on a single machine
    • S.T. Webster and K.R. Baker (1995). Scheduling groups of jobs on a single machine. Operations Research, 43, 692-703.
    • (1995) Operations Research , vol.43 , pp. 692-703
    • Webster, S.T.1    Baker, K.R.2
  • 16
    • 0002241669 scopus 로고
    • Scheduling with batching: Minimizing the weighted number of tardy jobs
    • D.S. Hochbaum and D. Landy (1994). Scheduling with batching: minimizing the weighted number of tardy jobs. Operations Research Letters, 16, 79-86.
    • (1994) Operations Research Letters , vol.16 , pp. 79-86
    • Hochbaum, D.S.1    Landy, D.2
  • 17
    • 0029736136 scopus 로고    scopus 로고
    • Single machine batch scheduling to minimize the weighted number of late jobs
    • P. Brucker and M.Y. Kovalyov (1996). Single machine batch scheduling to minimize the weighted number of late jobs. Mathematical Methods of Operations Research, 43, 1-8.
    • (1996) Mathematical Methods of Operations Research , vol.43 , pp. 1-8
    • Brucker, P.1    Kovalyov, M.Y.2
  • 18
    • 0035521426 scopus 로고    scopus 로고
    • Generating experimental data for machine scheduling problems
    • N.G. Hall and M.E. Posner (2001). Generating experimental data for machine scheduling problems. Operations Research, 49, 854-865.
    • (2001) Operations Research , vol.49 , pp. 854-865
    • Hall, N.G.1    Posner, M.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.