메뉴 건너뛰기




Volumn 41, Issue 4, 2003, Pages 301-319

One-operator, two-machine open shop and flow shop scheduling with setup times for machines and maximum lateness objective

Author keywords

One operator; Polynomial algorithm; Scheduling; Two machine

Indexed keywords

ALGORITHMS; FUNCTION EVALUATION; MANAGEMENT SCIENCE; OPTIMAL SYSTEMS; POLYNOMIALS; PROBLEM SOLVING; SET THEORY;

EID: 1842671669     PISSN: 03155986     EISSN: None     Source Type: Journal    
DOI: 10.1080/03155986.2003.11732683     Document Type: Article
Times cited : (7)

References (32)
  • 1
    • 0025489361 scopus 로고
    • Scheduling production of common components at a single facility
    • Aneja, Y.P. and N. Singh, 1990, "Scheduling production of common components at a single facility," IIE Transactions, 22, 3, 234-237.
    • (1990) IIE Transactions , vol.22 , Issue.3 , pp. 234-237
    • Aneja, Y.P.1    Singh, N.2
  • 2
    • 0002844386 scopus 로고
    • Scheduling the production of components at a common facility
    • Baker, K.R., 1988, "Scheduling the production of components at a common facility", IIE Transactions, 20, 32-36.
    • (1988) IIE Transactions , vol.20 , pp. 32-36
    • Baker, K.R.1
  • 3
    • 0041687905 scopus 로고
    • Scheduling groups of jobs to minimize maximum lateness
    • Detroit
    • Baker, K.R. and M.J. Magazine, 1994, "Scheduling groups of jobs to minimize maximum lateness", ORSA/TIMS meeting, Detroit.
    • (1994) ORSA/TIMS Meeting
    • Baker, K.R.1    Magazine, M.J.2
  • 5
    • 0000612586 scopus 로고
    • Complexity of task sequencing with deadlines, setup times and changeover costs
    • Bruno, J. and P. Downey, 1978, "Complexity of task sequencing with deadlines, setup times and changeover costs", SIAM Journal of Comput., 7, 393-404.
    • (1978) SIAM Journal of Comput. , vol.7 , pp. 393-404
    • Bruno, J.1    Downey, P.2
  • 6
    • 0032096682 scopus 로고    scopus 로고
    • A note on scheduling alternative operations in two-machine flow shops
    • Cheng, T.C.E. and G. Wang, 1998, "A note on scheduling alternative operations in two-machine flow shops", Journal of the Operational Research Society, 49, 670-673.
    • (1998) Journal of the Operational Research Society , vol.49 , pp. 670-673
    • Cheng, T.C.E.1    Wang, G.2
  • 7
    • 0024664606 scopus 로고
    • Optimal scheduling of products with two subassemblies on a single machine
    • Coffman, E.G., Jr., A. Nozari and M. Yannakakis, 1989, "Optimal scheduling of products with two subassemblies on a single machine," Operations Research, 37, 426-436.
    • (1989) Operations Research , vol.37 , pp. 426-436
    • Coffman Jr., E.G.1    Nozari, A.2    Yannakakis, M.3
  • 9
    • 0025646885 scopus 로고
    • A pairwise interchange solution procedure for a scheduling problem with production of components at a single facility
    • Ding, F.Y., 1990, "A pairwise interchange solution procedure for a scheduling problem with production of components at a single facility," Computers & Industrial Engineering, 18, 325-331.
    • (1990) Computers & Industrial Engineering , vol.18 , pp. 325-331
    • Ding, F.Y.1
  • 13
    • 0009628229 scopus 로고    scopus 로고
    • Batch scheduling to minimize maximum lateness
    • Ghosh, J.B. and J.N.D. Gupta, 1997, "Batch scheduling to minimize maximum lateness", Operations Research Letters, 21, 77-80.
    • (1997) Operations Research Letters , vol.21 , pp. 77-80
    • Ghosh, J.B.1    Gupta, J.N.D.2
  • 14
    • 0031484488 scopus 로고    scopus 로고
    • Single-machine hierarchical scheduling with customer orders and multiple job classes
    • Gupta, J.N.D., J.C. Ho and J.A.A. van der Veen, 1997, "Single-machine hierarchical scheduling with customer orders and multiple job classes", Annals of Operations Research, 70, 127-143.
    • (1997) Annals of Operations Research , vol.70 , pp. 127-143
    • Gupta, J.N.D.1    Ho, J.C.2    Van Der Veen, J.A.A.3
  • 15
    • 0031517374 scopus 로고    scopus 로고
    • Single-machine scheduling with batch setup times to minimize maximum lateness
    • Hariri, A.M.A. and C.N. Potts, 1997, "Single-machine scheduling with batch setup times to minimize maximum lateness," Annals of Operations Research, 70, 75-92.
    • (1997) Annals of Operations Research , vol.70 , pp. 75-92
    • Hariri, A.M.A.1    Potts, C.N.2
  • 16
    • 0002241669 scopus 로고
    • Scheduling with batching: Minimizing the weighted number of tardy jobs
    • Hochbaum, D. and D. Landy, 1994, "Scheduling with batching: minimizing the weighted number of tardy jobs, Operations Research Letters, 16, 79-86.
    • (1994) Operations Research Letters , vol.16 , pp. 79-86
    • Hochbaum, D.1    Landy, D.2
  • 17
    • 3242759741 scopus 로고
    • Ph.D. thesis, Department of Management Sciences, University of Waterloo
    • Julien, F.M., 1991, Scheduling Customer Orders, Ph.D. thesis, Department of Management Sciences, University of Waterloo.
    • (1991) Scheduling Customer Orders
    • Julien, F.M.1
  • 19
    • 0024031525 scopus 로고
    • Concurrent routing, sequencing, and setups for a two-machine flexible manufacturing cell
    • Lee, E.J. and P.B. Mirchandani, 1988, "Concurrent routing, sequencing, and setups for a two-machine flexible manufacturing cell", IEEE Journal of Robotics and Automation, 4, 256-264.
    • (1988) IEEE Journal of Robotics and Automation , vol.4 , pp. 256-264
    • Lee, E.J.1    Mirchandani, P.B.2
  • 20
    • 0024736520 scopus 로고
    • On the complexity of scheduling with batch setup times
    • Monma, C.L. and C.N. Potts, 1989, "On the complexity of scheduling with batch setup times", Operations Research, 37, 798-804.
    • (1989) Operations Research , vol.37 , pp. 798-804
    • Monma, C.L.1    Potts, C.N.2
  • 21
    • 0031144678 scopus 로고    scopus 로고
    • Scheduling alternative operations in two-machine flow shops
    • Pan, C.H. and J.S. Chen, 1998, "Scheduling alternative operations in two-machine flow shops", Journal of the Operational Research Society, 48, 533-540.
    • (1998) Journal of the Operational Research Society , vol.48 , pp. 533-540
    • Pan, C.H.1    Chen, J.S.2
  • 23
    • 84974861854 scopus 로고
    • Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity
    • Potts, C.N. and L.N. Van Wassenhove, 1992, "Integrating scheduling with batching and lot-sizing: a review of algorithms and complexity", Journal of the Operational Research Society, 43, 395-406.
    • (1992) Journal of the Operational Research Society , vol.43 , pp. 395-406
    • Potts, C.N.1    Van Wassenhove, L.N.2
  • 24
    • 0028542281 scopus 로고
    • Group scheduling jobs on a single machine: A multi-objective approach with preemptive priority structure
    • Rana, S.P. and N. Singh, 1994, "Group scheduling jobs on a single machine: a multi-objective approach with preemptive priority structure," European Journal of Operational Research, 79, 38-50.
    • (1994) European Journal of Operational Research , vol.79 , pp. 38-50
    • Rana, S.P.1    Singh, N.2
  • 25
    • 0022132659 scopus 로고
    • Batching in single-operation manufacturing systems
    • Santos, C. and M. Magazine, 1985, "Batching in single-operation manufacturing systems", Operations Research Letters, 4, 99-103.
    • (1985) Operations Research Letters , vol.4 , pp. 99-103
    • Santos, C.1    Magazine, M.2
  • 26
    • 0030215229 scopus 로고    scopus 로고
    • Single-machine scheduling with release dates, due dates and family setup times
    • Schutten, J.M.J, S.L. van de Velde and W.H.M. Zijm, 1996, "Single-machine scheduling with release dates, due dates and family setup times", Management Science, 42, 1165-1174.
    • (1996) Management Science , vol.42 , pp. 1165-1174
    • Schutten, J.M.J.1    Van De Velde, S.L.2    Zijm, W.H.M.3
  • 27
    • 0027641652 scopus 로고
    • Scheduling of products with common and product-dependent components manufactured at a single facility
    • Sung, C.S. and C.K. Park, 1993, "Scheduling of products with common and product-dependent components manufactured at a single facility", Journal of the Operational Research Society, 44, 773-784.
    • (1993) Journal of the Operational Research Society , vol.44 , pp. 773-784
    • Sung, C.S.1    Park, C.K.2
  • 29
    • 0027569358 scopus 로고
    • Batching and sequencing of components at a single facility
    • Vickson, R.G., M.J. Magazine and C.A. Santos, 1993, "Batching and Sequencing of Components at a single facility", IIE Transactions, 25, 65-70.
    • (1993) IIE Transactions , vol.25 , pp. 65-70
    • Vickson, R.G.1    Magazine, M.J.2    Santos, C.A.3
  • 30
    • 3142635323 scopus 로고    scopus 로고
    • A polynomial time approximation scheme for single-machine sequencing with delivery times and sequence independent batch setup times
    • Woeginger, G.J., 1998, "A polynomial time approximation scheme for single-machine sequencing with delivery times and sequence independent batch setup times," Journal of Scheduling, 1, 79-87.
    • (1998) Journal of Scheduling , vol.1 , pp. 79-87
    • Woeginger, G.J.1
  • 31
    • 0029338650 scopus 로고
    • Scheduling groups of jobs on a single machine
    • Webster, S. and K.R. Baker, 1995, "Scheduling groups of jobs on a single machine", Operations Research, 43, 692-703.
    • (1995) Operations Research , vol.43 , pp. 692-703
    • Webster, S.1    Baker, K.R.2
  • 32
    • 0029183195 scopus 로고
    • Analysis of approximation algorithms for single machine scheduling with delivery times and sequence independent batch setup times
    • Zdrzalka, S., 1995, "Analysis of approximation algorithms for single machine scheduling with delivery times and sequence independent batch setup times," European Journal of Operational Research, 80, 371-380.
    • (1995) European Journal of Operational Research , vol.80 , pp. 371-380
    • Zdrzalka, S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.