메뉴 건너뛰기




Volumn 51, Issue 3, 2004, Pages 363-385

Resource allocation with lumpy demand: To speed or not to speed?

Author keywords

Inventory; Knapsack problems; Production rate; Quantity discounts

Indexed keywords

COSTS; ECONOMICS; HEURISTIC PROGRAMMING; INTEGER PROGRAMMING; INVENTORY CONTROL; INVESTMENTS; JUST IN TIME PRODUCTION; NONLINEAR PROGRAMMING; PRODUCTION;

EID: 1842507038     PISSN: 0894069X     EISSN: None     Source Type: Journal    
DOI: 10.1002/nav.10121     Document Type: Article
Times cited : (3)

References (40)
  • 2
    • 0018516784 scopus 로고
    • An algorithm for a nonlinear discontinuous knapsack problem
    • R.D. Armstrong, W.D. Cook, and F.E. Palacios-Gomez, An algorithm for a nonlinear discontinuous knapsack problem. Management Sci 25(9) (1979), 884-894.
    • (1979) Management Sci , vol.25 , Issue.9 , pp. 884-894
    • Armstrong, R.D.1    Cook, W.D.2    Palacios-Gomez, F.E.3
  • 3
    • 84925931867 scopus 로고
    • Disaggregation and resource allocation using convex knapsack problems with bounded variables
    • G.R. Bitran and A.C. Hax, Disaggregation and resource allocation using convex knapsack problems with bounded variables, Management Sci 27(4) (1981), 431-441.
    • (1981) Management Sci , vol.27 , Issue.4 , pp. 431-441
    • Bitran, G.R.1    Hax, A.C.2
  • 4
    • 0030836896 scopus 로고    scopus 로고
    • Nonlinear programming for multiperiod capacity planning in a manufacturing system
    • K.M. Bretthauer and M.J. Côté, Nonlinear programming for multiperiod capacity planning in a manufacturing system, European J Oper Res 96 (1996), 167-179.
    • (1996) European J Oper Res , vol.96 , pp. 167-179
    • Bretthauer, K.M.1    Côté, M.J.2
  • 5
    • 84986938620 scopus 로고
    • The effect of learning on the operation of mixed-model assembly lines
    • A.K. Chakravarty and A. Shtuh, The effect of learning on the operation of mixed-model assembly lines, Proc. Oper Management 1(2) (1992), 198-211.
    • (1992) Proc. Oper Management , vol.1 , Issue.2 , pp. 198-211
    • Chakravarty, A.K.1    Shtuh, A.2
  • 7
    • 0032115907 scopus 로고    scopus 로고
    • Optimal production and inventory policy for multiple products under resource constraints
    • G.A. DeCroix and A. Arreola-Risa, Optimal production and inventory policy for multiple products under resource constraints, Management Sci 44(7) (1998), 950-961.
    • (1998) Management Sci , vol.44 , Issue.7 , pp. 950-961
    • DeCroix, G.A.1    Arreola-Risa, A.2
  • 8
    • 0000086623 scopus 로고
    • Inventory control of a multiproduct system with a limited production resource
    • R. Evans, Inventory control of a multiproduct system with a limited production resource, Naval Res Logist Quart 14 (1967), 173-184.
    • (1967) Naval Res Logist Quart , vol.14 , pp. 173-184
    • Evans, R.1
  • 9
    • 84989095992 scopus 로고
    • Output flexibility - A competitive advantage for small firms
    • A. Fiegenbaum and A. Karnani, Output flexibility - a competitive advantage for small firms, Strategic Manageemnt J 12 (1991), 101-114.
    • (1991) Strategic Manageemnt J , vol.12 , pp. 101-114
    • Fiegenbaum, A.1    Karnani, A.2
  • 11
    • 0027594688 scopus 로고
    • Reduced production rates in the economic lot scheduling problem
    • G. Gallego, Reduced production rates in the economic lot scheduling problem. Int J Prod Res 31(5) (1993), 1035-1046.
    • (1993) Int J Prod Res , vol.31 , Issue.5 , pp. 1035-1046
    • Gallego, G.1
  • 12
    • 0030231648 scopus 로고    scopus 로고
    • Allocating production capacity among multiple products
    • P. Glasserman, Allocating production capacity among multiple products, Oper Res 44 (1996) 724-734.
    • (1996) Oper Res , vol.44 , pp. 724-734
    • Glasserman, P.1
  • 14
    • 0024715832 scopus 로고
    • Integrated inventory models: The buyer-vendor coordination
    • S.K. Goyal and Y.P. Gupta, Integrated inventory models: The buyer-vendor coordination, European J Oper Res 41(3) (1989), 261-269.
    • (1989) European J Oper Res , vol.41 , Issue.3 , pp. 261-269
    • Goyal, S.K.1    Gupta, Y.P.2
  • 16
    • 84987027690 scopus 로고
    • Models for optimal lead time reduction
    • A.V. Hill and I.S. Khosla, Models for optimal lead time reduction, Prod Oper Management 1(2) (1992), 185-197.
    • (1992) Prod Oper Management , vol.1 , Issue.2 , pp. 185-197
    • Hill, A.V.1    Khosla, I.S.2
  • 18
    • 0000972493 scopus 로고
    • Comments on A quantity discount pricing model to increase vendor profits
    • P.N. Joglekar, Comments on "A quantity discount pricing model to increase vendor profits," Management Sci 34 (1988), 1391-1398.
    • (1988) Management Sci , vol.34 , pp. 1391-1398
    • Joglekar, P.N.1
  • 19
    • 0346972253 scopus 로고    scopus 로고
    • Inventory investment, product cycles, and the imperfectly competitive firm
    • P.C. Jones, L.N. Moses, and J.L. Zydiak, Inventory investment, product cycles, and the imperfectly competitive firm, Int J Prod Econom 54(3) (1998), 267-276.
    • (1998) Int J Prod Econom , vol.54 , Issue.3 , pp. 267-276
    • Jones, P.C.1    Moses, L.N.2    Zydiak, J.L.3
  • 20
    • 0011688772 scopus 로고    scopus 로고
    • Resource allocation problems
    • D.-Z. Du and P.M. Pardolos (Editors), Kluwer Academic Publishers, Dordrecht, The Netherlands
    • N. Katoh and T. Ibaraki, "Resource allocation problems," Handbook of combinatorial optimization, D.-Z. Du and P.M. Pardolos (Editors), Kluwer Academic Publishers, Dordrecht, The Netherlands, 1998, Vol. 2, pp. 159-260.
    • (1998) Handbook of Combinatorial Optimization , vol.2 , pp. 159-260
    • Katoh, N.1    Ibaraki, T.2
  • 21
    • 1842455787 scopus 로고    scopus 로고
    • The economic lot and delivery scheduling problem: Common cycle, rework, and variable production rate
    • M. Khouja, The economic lot and delivery scheduling problem: Common cycle, rework, and variable production rate, IIE Trans 32 (2000), 715-725.
    • (2000) IIE Trans , vol.32 , pp. 715-725
    • Khouja, M.1
  • 22
    • 0033225735 scopus 로고    scopus 로고
    • Deliberately slowing down output in a family production context
    • M. Khouja, A note on "Deliberately slowing down output in a family production context," Int J Prod Res 37 (1999), 4067-4077.
    • (1999) Int J Prod Res , vol.37 , pp. 4067-4077
    • Khouja, M.1
  • 23
    • 0030734428 scopus 로고    scopus 로고
    • The scheduling of economic lot sizes on volume flexible production systems
    • M. Khouja, The scheduling of economic lot sizes on volume flexible production systems, Int J Prod Econom 48 (1997), 73-86.
    • (1997) Int J Prod Econom , vol.48 , pp. 73-86
    • Khouja, M.1
  • 24
    • 1842560385 scopus 로고    scopus 로고
    • A supply chain inventory model with rework cost and variable unit production times
    • M. Khouja, A supply chain inventory model with rework cost and variable unit production times, Management Sci Regional Dev 1(2) (1996), 3-21.
    • (1996) Management Sci Regional Dev , vol.1 , Issue.2 , pp. 3-21
    • Khouja, M.1
  • 25
    • 0029309062 scopus 로고
    • The economic production lot size model under volume flexibility
    • M. Khouja, The economic production lot size model under volume flexibility, Comput Oper Res 22(5) (1995), 515-523.
    • (1995) Comput Oper Res , vol.22 , Issue.5 , pp. 515-523
    • Khouja, M.1
  • 26
    • 0028698197 scopus 로고
    • An economic production lot size model with imperfect quality and variable production rate
    • M. Khouja and A. Mehrez, An economic production lot size model with imperfect quality and variable production rate, J Oper Res Soc 45(12) (1994), 1405-1417.
    • (1994) J Oper Res Soc , vol.45 , Issue.12 , pp. 1405-1417
    • Khouja, M.1    Mehrez, A.2
  • 27
    • 0001524920 scopus 로고
    • A generalized quantity discount pricing model to increase supplier's profits
    • H.L. Lee and M.J. Rosenblatt, A generalized quantity discount pricing model to increase supplier's profits, Management Sci 32(9) (1986), 1177-1185.
    • (1986) Management Sci , vol.32 , Issue.9 , pp. 1177-1185
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 28
    • 0346446112 scopus 로고    scopus 로고
    • Investment in setup cost, lead time, and demand predictability improvement in the EOQ model
    • C.-L. Li, S.J. Erlebacher, and D.H. Kropp, Investment in setup cost, lead time, and demand predictability improvement in the EOQ model, Proc. Oper Management 6(4) (1997), 341-352.
    • (1997) Proc. Oper Management , vol.6 , Issue.4 , pp. 341-352
    • Li, C.-L.1    Erlebacher, S.J.2    Kropp, D.H.3
  • 29
    • 0001008011 scopus 로고
    • Allocation of effort resources among competiting activities
    • H. Luss and S.K. Gupta, Allocation of effort resources among competiting activities, Oper Res 23 (1975), 360-366.
    • (1975) Oper Res , vol.23 , pp. 360-366
    • Luss, H.1    Gupta, S.K.2
  • 31
    • 0021439741 scopus 로고
    • A quantity discount pricing model to increase vendor profits
    • J.P. Monahan, A quantity discount pricing model to increase vendor profits, Management Sci 30(6) (1984), 720-726.
    • (1984) Management Sci , vol.30 , Issue.6 , pp. 720-726
    • Monahan, J.P.1
  • 32
    • 0026373729 scopus 로고
    • Controllable production rates in family production context
    • I. Moon, G. Gallego, and D. Simchi-Levi, Controllable production rates in family production context, Int J Prod Res 29 (1991), 2459-2470.
    • (1991) Int J Prod Res , vol.29 , pp. 2459-2470
    • Moon, I.1    Gallego, G.2    Simchi-Levi, D.3
  • 33
    • 0035341128 scopus 로고    scopus 로고
    • Coordinating a three-level supply chain with quantity discounts
    • C.L. Munson and M.J. Rosenblatt, Coordinating a three-level supply chain with quantity discounts, IEEE Trans 33(5) (2001), 371-384.
    • (2001) IEEE Trans , vol.33 , Issue.5 , pp. 371-384
    • Munson, C.L.1    Rosenblatt, M.J.2
  • 34
    • 0001204626 scopus 로고    scopus 로고
    • Theories and realities of quantity discounts: An exploratory study
    • C.L. Munson and M.J. Rosenblatt, Theories and realities of quantity discounts: An exploratory study, Prod Oper Management 7(4) (1998), 352-369.
    • (1998) Prod Oper Management , vol.7 , Issue.4 , pp. 352-369
    • Munson, C.L.1    Rosenblatt, M.J.2
  • 35
    • 0000752798 scopus 로고
    • Investing in reduced setups in the EOQ model
    • E.L. Porteus, Investing in reduced setups in the EOQ model, Management Sci 31(8) (1985), 998-1010.
    • (1985) Management Sci , vol.31 , Issue.8 , pp. 998-1010
    • Porteus, E.L.1
  • 36
    • 0026141756 scopus 로고
    • Optimizing processing rates for flexible manufacturing systems
    • P.J. Schweitzer and A. Seidmann, Optimizing processing rates for flexible manufacturing systems, Management Sci 37(4) (1991), 454-466.
    • (1991) Management Sci , vol.37 , Issue.4 , pp. 454-466
    • Schweitzer, P.J.1    Seidmann, A.2
  • 37
    • 0025243881 scopus 로고
    • Deliberately slowing down output in a family production context
    • E.A. Silver, Deliberately slowing down output in a family production context, Int J Prod Res 28(1) (1990), 17-27.
    • (1990) Int J Prod Res , vol.28 , Issue.1 , pp. 17-27
    • Silver, E.A.1
  • 38
    • 0030287501 scopus 로고    scopus 로고
    • Multi-item, multi-period production planning with uncertain demand
    • C.R. Sox and J.A. Muchstadt, Multi-item, multi-period production planning with uncertain demand, IIE Trans 28 (1996), 891-900.
    • (1996) IIE Trans , vol.28 , pp. 891-900
    • Sox, C.R.1    Muchstadt, J.A.2
  • 39
    • 0030514250 scopus 로고    scopus 로고
    • Capital budgeting for volume flexible equipment
    • G.F. Tannous, Capital budgeting for volume flexible equipment, Decis Sci 27(2) (1996), 157-184.
    • (1996) Decis Sci , vol.27 , Issue.2 , pp. 157-184
    • Tannous, G.F.1
  • 40
    • 0032670623 scopus 로고    scopus 로고
    • Impact of various flexibility types in a hybrid fabrication/assembly production system
    • H. Tsubone and M. Horikawa, Impact of various flexibility types in a hybrid fabrication/assembly production system, Int J Prod Econom 60-61 (1999), 117-123.
    • (1999) Int J Prod Econom , vol.60-61 , pp. 117-123
    • Tsubone, H.1    Horikawa, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.