-
1
-
-
0004192446
-
-
Prentice Hall, Upper Saddle River, NJ
-
R. Anupindi, S. Chopra, S.D. Deshmukh, J.A. Van Mieghem, and E. Zemel, Managing business process flows, 1st edition, Prentice Hall, Upper Saddle River, NJ, 1999.
-
(1999)
Managing Business Process Flows, 1st Edition
-
-
Anupindi, R.1
Chopra, S.2
Deshmukh, S.D.3
Van Mieghem, J.A.4
Zemel, E.5
-
2
-
-
0018516784
-
An algorithm for a nonlinear discontinuous knapsack problem
-
R.D. Armstrong, W.D. Cook, and F.E. Palacios-Gomez, An algorithm for a nonlinear discontinuous knapsack problem. Management Sci 25(9) (1979), 884-894.
-
(1979)
Management Sci
, vol.25
, Issue.9
, pp. 884-894
-
-
Armstrong, R.D.1
Cook, W.D.2
Palacios-Gomez, F.E.3
-
3
-
-
84925931867
-
Disaggregation and resource allocation using convex knapsack problems with bounded variables
-
G.R. Bitran and A.C. Hax, Disaggregation and resource allocation using convex knapsack problems with bounded variables, Management Sci 27(4) (1981), 431-441.
-
(1981)
Management Sci
, vol.27
, Issue.4
, pp. 431-441
-
-
Bitran, G.R.1
Hax, A.C.2
-
4
-
-
0030836896
-
Nonlinear programming for multiperiod capacity planning in a manufacturing system
-
K.M. Bretthauer and M.J. Côté, Nonlinear programming for multiperiod capacity planning in a manufacturing system, European J Oper Res 96 (1996), 167-179.
-
(1996)
European J Oper Res
, vol.96
, pp. 167-179
-
-
Bretthauer, K.M.1
Côté, M.J.2
-
5
-
-
84986938620
-
The effect of learning on the operation of mixed-model assembly lines
-
A.K. Chakravarty and A. Shtuh, The effect of learning on the operation of mixed-model assembly lines, Proc. Oper Management 1(2) (1992), 198-211.
-
(1992)
Proc. Oper Management
, vol.1
, Issue.2
, pp. 198-211
-
-
Chakravarty, A.K.1
Shtuh, A.2
-
6
-
-
0003949311
-
-
Prentice Hall, Upper Saddle River, NJ
-
S. Chopra and P. Meindl, Supply chain management: Strategy, planning, and operation, Prentice Hall, Upper Saddle River, NJ, 2004.
-
(2004)
Supply Chain Management: Strategy, Planning, and Operation
-
-
Chopra, S.1
Meindl, P.2
-
7
-
-
0032115907
-
Optimal production and inventory policy for multiple products under resource constraints
-
G.A. DeCroix and A. Arreola-Risa, Optimal production and inventory policy for multiple products under resource constraints, Management Sci 44(7) (1998), 950-961.
-
(1998)
Management Sci
, vol.44
, Issue.7
, pp. 950-961
-
-
DeCroix, G.A.1
Arreola-Risa, A.2
-
8
-
-
0000086623
-
Inventory control of a multiproduct system with a limited production resource
-
R. Evans, Inventory control of a multiproduct system with a limited production resource, Naval Res Logist Quart 14 (1967), 173-184.
-
(1967)
Naval Res Logist Quart
, vol.14
, pp. 173-184
-
-
Evans, R.1
-
9
-
-
84989095992
-
Output flexibility - A competitive advantage for small firms
-
A. Fiegenbaum and A. Karnani, Output flexibility - a competitive advantage for small firms, Strategic Manageemnt J 12 (1991), 101-114.
-
(1991)
Strategic Manageemnt J
, vol.12
, pp. 101-114
-
-
Fiegenbaum, A.1
Karnani, A.2
-
10
-
-
1842455785
-
-
McGraw-Hill. Irwin, Boston
-
B.J. Finch, OperationsNow.com: Processes, value, and profitability, McGraw-Hill. Irwin, Boston, 2003.
-
(2003)
OperationsNow.com: Processes, Value, and Profitability
-
-
Finch, B.J.1
-
11
-
-
0027594688
-
Reduced production rates in the economic lot scheduling problem
-
G. Gallego, Reduced production rates in the economic lot scheduling problem. Int J Prod Res 31(5) (1993), 1035-1046.
-
(1993)
Int J Prod Res
, vol.31
, Issue.5
, pp. 1035-1046
-
-
Gallego, G.1
-
12
-
-
0030231648
-
Allocating production capacity among multiple products
-
P. Glasserman, Allocating production capacity among multiple products, Oper Res 44 (1996) 724-734.
-
(1996)
Oper Res
, vol.44
, pp. 724-734
-
-
Glasserman, P.1
-
13
-
-
0003398482
-
-
North River Press, Great Barrington, MA
-
E.M. Goldratt and J. Cox, The goal: A process of ongoing improvement, 2nd revised edition, North River Press, Great Barrington, MA, 1992.
-
(1992)
The Goal: A Process of Ongoing Improvement, 2nd Revised Edition
-
-
Goldratt, E.M.1
Cox, J.2
-
14
-
-
0024715832
-
Integrated inventory models: The buyer-vendor coordination
-
S.K. Goyal and Y.P. Gupta, Integrated inventory models: The buyer-vendor coordination, European J Oper Res 41(3) (1989), 261-269.
-
(1989)
European J Oper Res
, vol.41
, Issue.3
, pp. 261-269
-
-
Goyal, S.K.1
Gupta, Y.P.2
-
16
-
-
84987027690
-
Models for optimal lead time reduction
-
A.V. Hill and I.S. Khosla, Models for optimal lead time reduction, Prod Oper Management 1(2) (1992), 185-197.
-
(1992)
Prod Oper Management
, vol.1
, Issue.2
, pp. 185-197
-
-
Hill, A.V.1
Khosla, I.S.2
-
18
-
-
0000972493
-
Comments on A quantity discount pricing model to increase vendor profits
-
P.N. Joglekar, Comments on "A quantity discount pricing model to increase vendor profits," Management Sci 34 (1988), 1391-1398.
-
(1988)
Management Sci
, vol.34
, pp. 1391-1398
-
-
Joglekar, P.N.1
-
19
-
-
0346972253
-
Inventory investment, product cycles, and the imperfectly competitive firm
-
P.C. Jones, L.N. Moses, and J.L. Zydiak, Inventory investment, product cycles, and the imperfectly competitive firm, Int J Prod Econom 54(3) (1998), 267-276.
-
(1998)
Int J Prod Econom
, vol.54
, Issue.3
, pp. 267-276
-
-
Jones, P.C.1
Moses, L.N.2
Zydiak, J.L.3
-
20
-
-
0011688772
-
Resource allocation problems
-
D.-Z. Du and P.M. Pardolos (Editors), Kluwer Academic Publishers, Dordrecht, The Netherlands
-
N. Katoh and T. Ibaraki, "Resource allocation problems," Handbook of combinatorial optimization, D.-Z. Du and P.M. Pardolos (Editors), Kluwer Academic Publishers, Dordrecht, The Netherlands, 1998, Vol. 2, pp. 159-260.
-
(1998)
Handbook of Combinatorial Optimization
, vol.2
, pp. 159-260
-
-
Katoh, N.1
Ibaraki, T.2
-
21
-
-
1842455787
-
The economic lot and delivery scheduling problem: Common cycle, rework, and variable production rate
-
M. Khouja, The economic lot and delivery scheduling problem: Common cycle, rework, and variable production rate, IIE Trans 32 (2000), 715-725.
-
(2000)
IIE Trans
, vol.32
, pp. 715-725
-
-
Khouja, M.1
-
22
-
-
0033225735
-
Deliberately slowing down output in a family production context
-
M. Khouja, A note on "Deliberately slowing down output in a family production context," Int J Prod Res 37 (1999), 4067-4077.
-
(1999)
Int J Prod Res
, vol.37
, pp. 4067-4077
-
-
Khouja, M.1
-
23
-
-
0030734428
-
The scheduling of economic lot sizes on volume flexible production systems
-
M. Khouja, The scheduling of economic lot sizes on volume flexible production systems, Int J Prod Econom 48 (1997), 73-86.
-
(1997)
Int J Prod Econom
, vol.48
, pp. 73-86
-
-
Khouja, M.1
-
24
-
-
1842560385
-
A supply chain inventory model with rework cost and variable unit production times
-
M. Khouja, A supply chain inventory model with rework cost and variable unit production times, Management Sci Regional Dev 1(2) (1996), 3-21.
-
(1996)
Management Sci Regional Dev
, vol.1
, Issue.2
, pp. 3-21
-
-
Khouja, M.1
-
25
-
-
0029309062
-
The economic production lot size model under volume flexibility
-
M. Khouja, The economic production lot size model under volume flexibility, Comput Oper Res 22(5) (1995), 515-523.
-
(1995)
Comput Oper Res
, vol.22
, Issue.5
, pp. 515-523
-
-
Khouja, M.1
-
26
-
-
0028698197
-
An economic production lot size model with imperfect quality and variable production rate
-
M. Khouja and A. Mehrez, An economic production lot size model with imperfect quality and variable production rate, J Oper Res Soc 45(12) (1994), 1405-1417.
-
(1994)
J Oper Res Soc
, vol.45
, Issue.12
, pp. 1405-1417
-
-
Khouja, M.1
Mehrez, A.2
-
27
-
-
0001524920
-
A generalized quantity discount pricing model to increase supplier's profits
-
H.L. Lee and M.J. Rosenblatt, A generalized quantity discount pricing model to increase supplier's profits, Management Sci 32(9) (1986), 1177-1185.
-
(1986)
Management Sci
, vol.32
, Issue.9
, pp. 1177-1185
-
-
Lee, H.L.1
Rosenblatt, M.J.2
-
28
-
-
0346446112
-
Investment in setup cost, lead time, and demand predictability improvement in the EOQ model
-
C.-L. Li, S.J. Erlebacher, and D.H. Kropp, Investment in setup cost, lead time, and demand predictability improvement in the EOQ model, Proc. Oper Management 6(4) (1997), 341-352.
-
(1997)
Proc. Oper Management
, vol.6
, Issue.4
, pp. 341-352
-
-
Li, C.-L.1
Erlebacher, S.J.2
Kropp, D.H.3
-
29
-
-
0001008011
-
Allocation of effort resources among competiting activities
-
H. Luss and S.K. Gupta, Allocation of effort resources among competiting activities, Oper Res 23 (1975), 360-366.
-
(1975)
Oper Res
, vol.23
, pp. 360-366
-
-
Luss, H.1
Gupta, S.K.2
-
31
-
-
0021439741
-
A quantity discount pricing model to increase vendor profits
-
J.P. Monahan, A quantity discount pricing model to increase vendor profits, Management Sci 30(6) (1984), 720-726.
-
(1984)
Management Sci
, vol.30
, Issue.6
, pp. 720-726
-
-
Monahan, J.P.1
-
32
-
-
0026373729
-
Controllable production rates in family production context
-
I. Moon, G. Gallego, and D. Simchi-Levi, Controllable production rates in family production context, Int J Prod Res 29 (1991), 2459-2470.
-
(1991)
Int J Prod Res
, vol.29
, pp. 2459-2470
-
-
Moon, I.1
Gallego, G.2
Simchi-Levi, D.3
-
33
-
-
0035341128
-
Coordinating a three-level supply chain with quantity discounts
-
C.L. Munson and M.J. Rosenblatt, Coordinating a three-level supply chain with quantity discounts, IEEE Trans 33(5) (2001), 371-384.
-
(2001)
IEEE Trans
, vol.33
, Issue.5
, pp. 371-384
-
-
Munson, C.L.1
Rosenblatt, M.J.2
-
34
-
-
0001204626
-
Theories and realities of quantity discounts: An exploratory study
-
C.L. Munson and M.J. Rosenblatt, Theories and realities of quantity discounts: An exploratory study, Prod Oper Management 7(4) (1998), 352-369.
-
(1998)
Prod Oper Management
, vol.7
, Issue.4
, pp. 352-369
-
-
Munson, C.L.1
Rosenblatt, M.J.2
-
35
-
-
0000752798
-
Investing in reduced setups in the EOQ model
-
E.L. Porteus, Investing in reduced setups in the EOQ model, Management Sci 31(8) (1985), 998-1010.
-
(1985)
Management Sci
, vol.31
, Issue.8
, pp. 998-1010
-
-
Porteus, E.L.1
-
36
-
-
0026141756
-
Optimizing processing rates for flexible manufacturing systems
-
P.J. Schweitzer and A. Seidmann, Optimizing processing rates for flexible manufacturing systems, Management Sci 37(4) (1991), 454-466.
-
(1991)
Management Sci
, vol.37
, Issue.4
, pp. 454-466
-
-
Schweitzer, P.J.1
Seidmann, A.2
-
37
-
-
0025243881
-
Deliberately slowing down output in a family production context
-
E.A. Silver, Deliberately slowing down output in a family production context, Int J Prod Res 28(1) (1990), 17-27.
-
(1990)
Int J Prod Res
, vol.28
, Issue.1
, pp. 17-27
-
-
Silver, E.A.1
-
38
-
-
0030287501
-
Multi-item, multi-period production planning with uncertain demand
-
C.R. Sox and J.A. Muchstadt, Multi-item, multi-period production planning with uncertain demand, IIE Trans 28 (1996), 891-900.
-
(1996)
IIE Trans
, vol.28
, pp. 891-900
-
-
Sox, C.R.1
Muchstadt, J.A.2
-
39
-
-
0030514250
-
Capital budgeting for volume flexible equipment
-
G.F. Tannous, Capital budgeting for volume flexible equipment, Decis Sci 27(2) (1996), 157-184.
-
(1996)
Decis Sci
, vol.27
, Issue.2
, pp. 157-184
-
-
Tannous, G.F.1
-
40
-
-
0032670623
-
Impact of various flexibility types in a hybrid fabrication/assembly production system
-
H. Tsubone and M. Horikawa, Impact of various flexibility types in a hybrid fabrication/assembly production system, Int J Prod Econom 60-61 (1999), 117-123.
-
(1999)
Int J Prod Econom
, vol.60-61
, pp. 117-123
-
-
Tsubone, H.1
Horikawa, M.2
|