메뉴 건너뛰기




Volumn 157, Issue 1, 2004, Pages 257-261

Comments on "Flow shop and open shop scheduling with a critical machine and two operations per job"

Author keywords

Flow shop; Minimum makespan; Polynomial time algorithm; Scheduling

Indexed keywords

ALGORITHMS; MACHINERY; POLYNOMIALS; PRODUCTION ENGINEERING; SCHEDULING;

EID: 1842478878     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(03)00236-4     Document Type: Conference Paper
Times cited : (19)

References (2)
  • 1
    • 0003075019 scopus 로고
    • Optimal two- and three-stage production schedules with setup times included
    • Johnson S.M. Optimal two- and three-stage production schedules with setup times included. Naval Research Logistics Quarterly. 1:1954;61-68.
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 2
    • 0345848529 scopus 로고    scopus 로고
    • Flow shop and open shop scheduling with a critical machine and two operations per job
    • Kyparisis G.J., Koulamas C. Flow shop and open shop scheduling with a critical machine and two operations per job. European Journal of Operational Research. 127:2000;120-125.
    • (2000) European Journal of Operational Research , vol.127 , pp. 120-125
    • Kyparisis, G.J.1    Koulamas, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.