메뉴 건너뛰기




Volumn 127, Issue 1, 2000, Pages 120-125

Flow shop and open shop scheduling with a critical machine and two operations per job

Author keywords

Flow shop; Open shop; Scheduling

Indexed keywords


EID: 0345848529     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(99)00327-6     Document Type: Article
Times cited : (23)

References (6)
  • 2
    • 0017918132 scopus 로고
    • Flowshop and jobshop schedules: Complexity and approximation
    • Gonzalez, T., Sahni, S., 1978. Flowshop and jobshop schedules: Complexity and approximation. Operations Research 26, 36-52.
    • (1978) Operations Research , vol.26 , pp. 36-52
    • Gonzalez, T.1    Sahni, S.2
  • 3
    • 0003075019 scopus 로고
    • Optimal two- And three-stage production schedules with setup times included
    • Johnson, S.M., 1954. Optimal two- and three-stage production schedules with setup times included. Naval Research Logistics Quarterly 1, 61-68.
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-68
    • Johnson, S.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.