메뉴 건너뛰기




Volumn 25, Issue 9-10, 2005, Pages 876-882

A beam-search-based algorithm for the tool switching problem on a flexible machine

Author keywords

Algorithm; Beam search; Heuristic; Tool management; Tool switches

Indexed keywords

ALGORITHMS; DATA ACQUISITION; HEURISTIC METHODS; NONLINEAR PROGRAMMING; PROBLEM SOLVING; RANDOM PROCESSES; TRAVELING SALESMAN PROBLEM;

EID: 18144398185     PISSN: 02683768     EISSN: None     Source Type: Journal    
DOI: 10.1007/s00170-003-1925-2     Document Type: Article
Times cited : (29)

References (14)
  • 1
    • 0027591340 scopus 로고
    • A synthesis of decision models for tool management in automated manufacturing
    • Gray AE, Siedmann A, Stecke EK (1993) A synthesis of decision models for tool management in automated manufacturing. Manage Sci 39:549-567
    • (1993) Manage Sci , vol.39 , pp. 549-567
    • Gray, A.E.1    Siedmann, A.2    Stecke, E.K.3
  • 3
    • 0024140442 scopus 로고
    • A heuristic for minimizing the number of tool switches on a flexible machine
    • Bard JF (1988) A heuristic for minimizing the number of tool switches on a flexible machine. IIE Trans 20:382-391
    • (1988) IIE Trans , vol.20 , pp. 382-391
    • Bard, J.F.1
  • 4
    • 0024070715 scopus 로고
    • Models arising from a flexible manufacturing machine. Part I: Minimization of the number of tool switches
    • Tang CS, Denardo EV (1988) Models arising from a flexible manufacturing machine. Part I: Minimization of the number of tool switches. Oper Res 36(5):767-777
    • (1988) Oper Res , vol.36 , Issue.5 , pp. 767-777
    • Tang, C.S.1    Denardo, E.V.2
  • 5
    • 0037051296 scopus 로고    scopus 로고
    • Optimal tooling policy for a tool switching problem of a flexible machine with automatic tool transporter
    • Song CY, Hwang H (2002) Optimal tooling policy for a tool switching problem of a flexible machine with automatic tool transporter. Int J Prod Res 40(4):873-883
    • (2002) Int J Prod Res , vol.40 , Issue.4 , pp. 873-883
    • Song, C.Y.1    Hwang, H.2
  • 6
    • 0032131897 scopus 로고    scopus 로고
    • Heuristics for minimizing tool switches when scheduling part types on a flexible machine
    • Hertz A, Laporte G, Mittaz M, Stecke K (1998) Heuristics for minimizing tool switches when scheduling part types on a flexible machine. IIE Trans 30:689-694
    • (1998) IIE Trans , vol.30 , pp. 689-694
    • Hertz, A.1    Laporte, G.2    Mittaz, M.3    Stecke, K.4
  • 7
    • 0033907566 scopus 로고    scopus 로고
    • A new heuristic based on a hypergraph representation for the tool switching problem
    • Djellab H, Djellab K, Gourgand M (2000) A new heuristic based on a hypergraph representation for the tool switching problem. Int J Prod Econ 64:165-176
    • (2000) Int J Prod Econ , vol.64 , pp. 165-176
    • Djellab, H.1    Djellab, K.2    Gourgand, M.3
  • 8
    • 0037209879 scopus 로고    scopus 로고
    • A tabu search based algorithm for minimizing the number of tool switches on a flexible machine
    • Al-Fawzan MA, Al-Sultan KS (2002) A tabu search based algorithm for minimizing the number of tool switches on a flexible machine. Comput Ind Eng 44:35-47
    • (2002) Comput Ind Eng , vol.44 , pp. 35-47
    • Al-Fawzan, M.A.1    Al-Sultan, K.S.2
  • 9
    • 0002007342 scopus 로고
    • Modeling a tool switching problem on a single NC machine
    • Privault C, Finke G (1995) Modeling a tool switching problem on a single NC machine. J Intell Manuf 6:87-94
    • (1995) J Intell Manuf , vol.6 , pp. 87-94
    • Privault, C.1    Finke, G.2
  • 10
    • 0033357382 scopus 로고    scopus 로고
    • Job shop scheduling with beam search
    • Sabuncuoglu I, Bayiz M (1999) Job shop scheduling with beam search. Eur J Oper Res 118:390-412
    • (1999) Eur J Oper Res , vol.118 , pp. 390-412
    • Sabuncuoglu, I.1    Bayiz, M.2
  • 11
    • 0032000573 scopus 로고    scopus 로고
    • A beam search-based algorithm and evaluation of scheduling approaches for flexible manufacturing systems
    • Sabuncuoglu I, Karabuk S (1998) A beam search-based algorithm and evaluation of scheduling approaches for flexible manufacturing systems. IIE Trans 30:179-191
    • (1998) IIE Trans , vol.30 , pp. 179-191
    • Sabuncuoglu, I.1    Karabuk, S.2
  • 12
    • 0036767274 scopus 로고    scopus 로고
    • A beam search based algorithm for flexible manufacturing system scheduling
    • Zhou BH, Zhou XJ, Cai JG (2002) A beam search based algorithm for flexible manufacturing system scheduling. J Donghua University 19(3):13-18
    • (2002) J Donghua University , vol.19 , Issue.3 , pp. 13-18
    • Zhou, B.H.1    Zhou, X.J.2    Cai, J.G.3
  • 13
    • 0026850995 scopus 로고
    • A comparison of tool management strategies and part selection rules for a flexible manufacturing system
    • Kwasi A-G, Jack RM, Amitabh R (1992) A comparison of tool management strategies and part selection rules for a flexible manufacturing system. Int J Prod Res 30(4):733-748
    • (1992) Int J Prod Res , vol.30 , Issue.4 , pp. 733-748
    • Kwasi, A.-G.1    Jack, R.M.2    Amitabh, R.3
  • 14
    • 0025595213 scopus 로고
    • A methodical approach to the flexible manufacturing system batching, loading and tool configuration problems
    • Henry CC, Jeanette SB, Chen SK (1990) A methodical approach to the flexible manufacturing system batching, loading and tool configuration problems. Int J Prod Res 28(12):2171-2186
    • (1990) Int J Prod Res , vol.28 , Issue.12 , pp. 2171-2186
    • Henry, C.C.1    Jeanette, S.B.2    Chen, S.K.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.