-
1
-
-
17144390908
-
Short-term load forecasting based on neural network and moving average
-
Iowa State University Report, 2002-05-08
-
Bao, J., 2002. Short-term load forecasting based on neural network and moving average, Iowa State University Report, 2002-05-08.
-
(2002)
-
-
Bao, J.1
-
2
-
-
0022215834
-
Comparative Models for Electrical Load Forecasting
-
New York: John Wiley
-
D. Bunn E.D. Farmer Comparative Models for Electrical Load Forecasting 1985 John Wiley New York
-
(1985)
-
-
Bunn, D.1
Farmer, E.D.2
-
3
-
-
0029777652
-
Forecasting the demand for energy in China
-
H.L. Chan S.K. Lee Forecasting the demand for energy in China The Energy Journal 17 1 1996 19-30
-
(1996)
The Energy Journal
, vol.17
, Issue.1
, pp. 19-30
-
-
Chan, H.L.1
Lee, S.K.2
-
4
-
-
0002715074
-
Forecasting the short-term demand for electricity. Do neural networks stand a better chance?
-
G.A. Darbellay M. Slama Forecasting the short-term demand for electricity. Do neural networks stand a better chance? International Journal of Forecasting 16 1 2000 71-83
-
(2000)
International Journal of Forecasting
, vol.16
, Issue.1
, pp. 71-83
-
-
Darbellay, G.A.1
Slama, M.2
-
7
-
-
0037273331
-
Modelling and forecasting the demand for electricity in New Zealand: A comparison of alternative approaches
-
K. Fatai L. Oxley F.G. Scrimgeour Modelling and forecasting the demand for electricity in New Zealand: A comparison of alternative approaches The Energy Journal 24 1 2003 75-102
-
(2003)
The Energy Journal
, vol.24
, Issue.1
, pp. 75-102
-
-
Fatai, K.1
Oxley, L.2
Scrimgeour, F.G.3
-
9
-
-
4243078673
-
Risk and costs of failure in the French electricity system
-
G.L. Gouni P. Torrion Risk and costs of failure in the French electricity system The Energy Journal 9 1988 33-37
-
(1988)
The Energy Journal
, vol.9
, pp. 33-37
-
-
Gouni, G.L.1
Torrion, P.2
-
10
-
-
0000741557
-
Methodological advances in energy modelling: 1970-1990
-
J.M. Griffin Methodological advances in energy modelling: 1970-1990 The Energy Journal 14 1 1993 111-124
-
(1993)
The Energy Journal
, vol.14
, Issue.1
, pp. 111-124
-
-
Griffin, J.M.1
-
15
-
-
0023438615
-
An integrated monthly and hourly regional electricity model for Ontario, Canada
-
C. Hsio M.W.L. Chan D.C. Mountain K.Y. Tsui An integrated monthly and hourly regional electricity model for Ontario, Canada Resources and Energy 9 3 1987 275-299
-
(1987)
Resources and Energy
, vol.9
, Issue.3
, pp. 275-299
-
-
Hsio, C.1
Chan, M.W.L.2
Mountain, D.C.3
Tsui, K.Y.4
-
16
-
-
17144393915
-
Short-term electrical load forecasting using artificial neural network
-
Australasian Universities Power Engineering Conference, New Zealand
-
V.H. Kher S.K. Joshi Short-term electrical load forecasting using artificial neural network Australasian Universities Power Engineering Conference, New Zealand 2003
-
(2003)
-
-
Kher, V.H.1
Joshi, S.K.2
-
17
-
-
17144412383
-
Diagnostic checking and intra-daily effects in time series models
-
S.J. Koopman Diagnostic checking and intra-daily effects in time series models Tinbergen Institute Research Series 27 1992 163-165
-
(1992)
Tinbergen Institute Research Series
, vol.27
, pp. 163-165
-
-
Koopman, S.J.1
-
20
-
-
15544367666
-
Estimating the number and location of knots in spline regression
-
L. Marsh Estimating the number and location of knots in spline regression Journal of Applied Business Research 3 1986 60-70
-
(1986)
Journal of Applied Business Research
, vol.3
, pp. 60-70
-
-
Marsh, L.1
-
21
-
-
15544383816
-
Alternative methods of estimating piecewise linear and higher order regression models
-
L. Marsh M. Maudgal J. Raman Alternative methods of estimating piecewise linear and higher order regression models Proceedings of SAS User's Group International 15 1990 523-527
-
(1990)
Proceedings of SAS User's Group International
, vol.15
, pp. 523-527
-
-
Marsh, L.1
Maudgal, M.2
Raman, J.3
-
22
-
-
17144381116
-
Demand forecasting for electricity
-
New Delhi, organised by the Energy and Resource Institute
-
Mehra, M., Bharadwaj, A., 2000. Demand forecasting for electricity, Proceedings of the National Conference on Regulation in Infrastructure Services, New Delhi, organised by the Energy and Resource Institute.
-
(2000)
Proceedings of the National Conference on Regulation in Infrastructure Services
-
-
Mehra, M.1
Bharadwaj, A.2
-
27
-
-
17144410170
-
Distributed lags and the demand for electricity
-
R.J. Sutherland Distributed lags and the demand for electricity The Energy Journal 4 1983 141-151
-
(1983)
The Energy Journal
, vol.4
, pp. 141-151
-
-
Sutherland, R.J.1
-
28
-
-
0037253037
-
Using weather ensemble predictions in electricity demand forecasting
-
J.W. Taylor R. Buizza Using weather ensemble predictions in electricity demand forecasting International Journal of Forecasting 19 1 2003 57-70
-
(2003)
International Journal of Forecasting
, vol.19
, Issue.1
, pp. 57-70
-
-
Taylor, J.W.1
Buizza, R.2
-
29
-
-
0343090870
-
Using combined forecasts with changing weights for electricity demand profiling
-
J.W. Taylor S. Majithia Using combined forecasts with changing weights for electricity demand profiling Journal of the Operational Research Society 51 2000 72-82
-
(2000)
Journal of the Operational Research Society
, vol.51
, pp. 72-82
-
-
Taylor, J.W.1
Majithia, S.2
-
30
-
-
17144369346
-
Modelización de series temporales estacionarias en espacio de estados
-
Documento de Trabajo de la Facultad de CC.EE. de la Universidad de Castilla la Mancha 2/1999/4
-
Vargas, M., 1999. Modelización de series temporales estacionarias en espacio de estados, Documento de Trabajo de la Facultad de CC.EE. de la Universidad de Castilla la Mancha 2/1999/4.
-
(1999)
-
-
Vargas, M.1
|