-
1
-
-
0012877102
-
Probability distributions of short-term electricity peak load forecasts
-
Adams, G., Allen, P. G., & Morzuch, B. J. (1991). Probability distributions of short-term electricity peak load forecasts. International Journal of Forecasting, 7, 283-297.
-
(1991)
International Journal of Forecasting
, vol.7
, pp. 283-297
-
-
Adams, G.1
Allen, P.G.2
Morzuch, B.J.3
-
2
-
-
0005880209
-
Answering the critics: Yes ARCH models do provide good volatility forecasts
-
Andersen, T. G., & Bollerslev, T. (1998). Answering the critics: yes ARCH models do provide good volatility forecasts. International Economic Review, 39, 885-906.
-
(1998)
International Economic Review
, vol.39
, pp. 885-906
-
-
Andersen, T.G.1
Bollerslev, T.2
-
3
-
-
0022223039
-
Load forecasting for scheduling generation on a large interconnected system
-
Bunn, D.W., & Farmer, E. D. (Eds.), Chichester: Wiley
-
Baker, A. B. (1985). Load forecasting for scheduling generation on a large interconnected system. In Bunn, D.W., & Farmer, E. D. (Eds.), Comparative Models for Electrical Load Forecasting. Chichester: Wiley, pp. 57-67.
-
(1985)
Comparative Models for Electrical Load Forecasting
, pp. 57-67
-
-
Baker, A.B.1
-
4
-
-
42449156579
-
Generalized autoregressive conditional heteroskedasticity
-
Bollerslev, T. (1986). Generalized autoregressive conditional heteroskedasticity. Journal of Econometrics, 31, 307-327.
-
(1986)
Journal of Econometrics
, vol.31
, pp. 307-327
-
-
Bollerslev, T.1
-
5
-
-
0033403384
-
Stochastic simulation of model uncertainties
-
Buizza, R., Miller, M., & Palmer, T. N. (1999). Stochastic simulation of model uncertainties. Quarterly Journal of the Royal Meteorological Society, 125, 2887-2908.
-
(1999)
Quarterly Journal of the Royal Meteorological Society
, vol.125
, pp. 2887-2908
-
-
Buizza, R.1
Miller, M.2
Palmer, T.N.3
-
6
-
-
0032414047
-
Impact of model resolution and ensemble size on the performance of an ensemble prediction system
-
Buizza, R., Petroliagis, T., Palmer, T. N., Barkmeijer, J., Hamrud, M., Hollingsworth, A., Simmons, A., & Wedi, N. (1998). Impact of model resolution and ensemble size on the performance of an ensemble prediction system. Quarterly Journal of the Royal Meteorological Society, 124, 1935-1960.
-
(1998)
Quarterly Journal of the Royal Meteorological Society
, vol.124
, pp. 1935-1960
-
-
Buizza, R.1
Petroliagis, T.2
Palmer, T.N.3
Barkmeijer, J.4
Hamrud, M.5
Hollingsworth, A.6
Simmons, A.7
Wedi, N.8
-
7
-
-
0000051984
-
Autoregressive conditional heteroscedasticity with estimates of the variance of United Kingdom inflation
-
Engle, R. F. (1982). Autoregressive conditional heteroscedasticity with estimates of the variance of United Kingdom inflation. Econometrica, 50, 987-1008.
-
(1982)
Econometrica
, vol.50
, pp. 987-1008
-
-
Engle, R.F.1
-
8
-
-
0010996879
-
Probabilistic Methods in Forecasting Hourly Loads and Peaks
-
Palo Alto, CA: Electric Power Research Institute, EPRI TE-101902
-
Engle, R., Granger, C.W. J., Ramanathan, R., & Vahid-Araghi, F. (1993). Probabilistic Methods in Forecasting Hourly Loads and Peaks. Palo Alto, CA: Electric Power Research Institute, EPRI TE-101902.
-
(1993)
-
-
Engle, R.1
Granger, C.W.J.2
Ramanathan, R.3
Vahid-Araghi, F.4
-
9
-
-
84984516669
-
Combining forecasts - Twenty years later
-
Granger, C. W. J. (1989). Combining forecasts - twenty years later. Journal of Forecasting, 8, 167-173.
-
(1989)
Journal of Forecasting
, vol.8
, pp. 167-173
-
-
Granger, C.W.J.1
-
10
-
-
0039197827
-
Can we improve the perceived quality of economic forecasts?
-
Granger, C.W. J. (1996). Can we improve the perceived quality of economic forecasts? Journal of Applied Econometrics, 11, 455-473.
-
(1996)
Journal of Applied Econometrics
, vol.11
, pp. 455-473
-
-
Granger, C.W.J.1
-
11
-
-
0003664106
-
-
2nd edn, Academic Press, London
-
Granger, C. W. J., & Newbold, P. (1986). 2nd edn, Forecasting Economic Time Series, Academic Press, London.
-
(1986)
Forecasting Economic Time Series
-
-
Granger, C.W.J.1
Newbold, P.2
-
12
-
-
38249026075
-
Interval forecasting: An analysis based upon ARCH-quantile estimators
-
Granger, C. W. J., White, H., & Kamstra, M. (1989). Interval forecasting: an analysis based upon ARCH-quantile estimators. Journal of Econometrics, 40, 87-96.
-
(1989)
Journal of Econometrics
, vol.40
, pp. 87-96
-
-
Granger, C.W.J.1
White, H.2
Kamstra, M.3
-
14
-
-
0035248045
-
Neural networks for short-term load forecasting: A review and evaluation
-
Hippert, H. S., Pedreira, C. E., & Souza, R. C. (2001). Neural networks for short-term load forecasting: a review and evaluation. IEEE Transactions on Power Systems, 16, 44-55.
-
(2001)
IEEE Transactions on Power Systems
, vol.16
, pp. 44-55
-
-
Hippert, H.S.1
Pedreira, C.E.2
Souza, R.C.3
-
15
-
-
0000630257
-
Theoretical skill of Monte Carlo forecasts
-
Leith, C. E. (1974). Theoretical skill of Monte Carlo forecasts. Monthly Weather Review, 102, 409-418.
-
(1974)
Monthly Weather Review
, vol.102
, pp. 409-418
-
-
Leith, C.E.1
-
16
-
-
84979347161
-
Forecasting from non-linear models in practice
-
Lin, J., & Granger, C. W. J. (1994). Forecasting from non-linear models in practice. Journal of Forecasting, 13, 1-9.
-
(1994)
Journal of Forecasting
, vol.13
, pp. 1-9
-
-
Lin, J.1
Granger, C.W.J.2
-
17
-
-
0029753275
-
The new ECMWF ensemble prediction system: Methodology and validation
-
Molteni, F., Buizza, R., Palmer, T. N., & Petroliagis, T. (1996). The new ECMWF ensemble prediction system: methodology and validation. Quarterly Journal of the Royal Meteorological Society, 122, 73-119.
-
(1996)
Quarterly Journal of the Royal Meteorological Society
, vol.122
, pp. 73-119
-
-
Molteni, F.1
Buizza, R.2
Palmer, T.N.3
Petroliagis, T.4
-
18
-
-
0002335344
-
Ensemble prediction
-
Shinfield Park, Reading, RG2 9AX, UK: ECMWF
-
Palmer, T. N., Molteni, F., Mureau, R., Buizza, R., Chapelet, P., & Tribbia, J. (1993). Ensemble prediction. In Proceedings of the ECMWF Seminar on Validation of Models over Europe,Vol. I. Shinfield Park, Reading, RG2 9AX, UK: ECMWF.
-
(1993)
Proceedings of the ECMWF Seminar on Validation of Models over Europe
, vol.1
-
-
Palmer, T.N.1
Molteni, F.2
Mureau, R.3
Buizza, R.4
Chapelet, P.5
Tribbia, J.6
-
19
-
-
0031168758
-
Short-run forecasts of electricity loads and peaks
-
Ramanathan, R., Engle, R., Granger, C.W. J.,Vahid-Araghi, F., & Brace, C. (1997). Short-run forecasts of electricity loads and peaks. International Journal of Forecasting, 13, 161-174.
-
(1997)
International Journal of Forecasting
, vol.13
, pp. 161-174
-
-
Ramanathan, R.1
Engle, R.2
Granger, C.W.J.3
Vahid-Araghi, F.4
Brace, C.5
-
20
-
-
0012856933
-
-
Stata STATA 3.1. College Station, TX: Stata Corporation
-
Stata (1993). STATA 3.1. College Station, TX: Stata Corporation.
-
(1993)
-
-
-
21
-
-
0000588489
-
Evaluating volatility and interval forecasts
-
Taylor, J. W. (1999). Evaluating volatility and interval forecasts. Journal of Forecasting, 18, 111-128.
-
(1999)
Journal of Forecasting
, vol.18
, pp. 111-128
-
-
Taylor, J.W.1
-
22
-
-
0343090870
-
Using combined forecasts with changing weights for electricity demand profiling
-
Taylor, J. W., & Majithia, S. (2000). Using combined forecasts with changing weights for electricity demand profiling. Journal of the Operational Research Society, 51, 72-82.
-
(2000)
Journal of the Operational Research Society
, vol.51
, pp. 72-82
-
-
Taylor, J.W.1
Majithia, S.2
-
24
-
-
0027705108
-
Operational ensemble prediction at the National Meteorological Center: Practical aspects
-
Tracton, M. S., & Kalnay, E. (1993). Operational ensemble prediction at the National Meteorological Center: practical aspects. Weather and Forecasting, 8, 379-398.
-
(1993)
Weather and Forecasting
, vol.8
, pp. 379-398
-
-
Tracton, M.S.1
Kalnay, E.2
|