메뉴 건너뛰기




Volumn 18, Issue 4, 2004, Pages 281-290

Navigational models for computer supported project Management tasks on construction sites

Author keywords

Construction industry; Construction sites; Data collection; Models; Navigation; Project management; Quality control

Indexed keywords

ARCHITECTURAL/ENGINEERING/CONSTRUCTION (AEC) DOMAINS; CONSTRUCTION SITES; DATA COLLECTION; DATA SETS;

EID: 16444371734     PISSN: 08873801     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0887-3801(2004)18:4(281)     Document Type: Article
Times cited : (22)

References (29)
  • 3
    • 0043253368 scopus 로고    scopus 로고
    • Formalization and automation of time-space conflict analysis
    • Akinci, B., Fischen, M., Levitt, R., and Carlson, R. (2002). "Formalization and automation of time-space conflict analysis." J. Comput. Civ. Eng., 6(2), 124-134.
    • (2002) J. Comput. Civ. Eng. , vol.6 , Issue.2 , pp. 124-134
    • Akinci, B.1    Fischen, M.2    Levitt, R.3    Carlson, R.4
  • 6
    • 0026850440 scopus 로고
    • A unified approach for modeling construction information
    • Bjork, B. C. (1991). "A unified approach for modeling construction information." Build. Environ., 27(2), 173-194.
    • (1991) Build. Environ. , vol.27 , Issue.2 , pp. 173-194
    • Bjork, B.C.1
  • 9
    • 0027644085 scopus 로고
    • Taking the pain out of the punch list
    • Boyle, M. A. (1993). "Taking the pain out of the punch list." Civ. Eng. (N.Y.), 63(8), 70-71.
    • (1993) Civ. Eng. (N.Y.) , vol.63 , Issue.8 , pp. 70-71
    • Boyle, M.A.1
  • 10
    • 0035482844 scopus 로고    scopus 로고
    • Construction coordination activities: What is important and what consumes time
    • Darshi de Saram, D., and Ahmed, S. M. (2001). "Construction coordination activities: What is important and what consumes time." J. Manage. Eng., 17(4), 202-213.
    • (2001) J. Manage. Eng. , vol.17 , Issue.4 , pp. 202-213
    • Darshi De Saram, D.1    Ahmed, S.M.2
  • 12
    • 0028465694 scopus 로고
    • Information models for use in product design: A comparison
    • Eastman, C. M., and Fereshetian, N. (1994). "Information models for use in product design: A comparison." Comput.-Aided Des., 26, 551-572.
    • (1994) Comput.-aided Des. , vol.26 , pp. 551-572
    • Eastman, C.M.1    Fereshetian, N.2
  • 13
    • 0002257445 scopus 로고    scopus 로고
    • Industry foundation classes for project management-first light, ITCON
    • Froese, T., et al. (1999). "Industry foundation classes for project management-First light, ITCON." Electron. J. Info. Technol. Constr. 4, 17-36.
    • (1999) Electron. J. Info. Technol. Constr. , vol.4 , pp. 17-36
    • Froese, T.1
  • 15
    • 0004059708 scopus 로고
    • The FISHEYE view: A new look at structured files
    • Bell Laboratories, Murray Hill, N.J.
    • Furnas, G. W. (1981). "The FISHEYE view: A new look at structured files." Technical Memorandum No. 81-11221-9, Bell Laboratories, Murray Hill, N.J.
    • (1981) Technical Memorandum No. 81-11221-9
    • Furnas, G.W.1
  • 19
    • 16444364835 scopus 로고
    • Mechanisms of slips in display-based human-computer interaction: A model-based analysis
    • HCI International, Tokyo
    • Kitajima, M., and Polson, P. (1995). "Mechanisms of slips in display-based human-computer interaction: A model-based analysis." Proc., Int. Conf. on Advances in Human Factors/Ergonomics, HCI International, Tokyo, 515-520.
    • (1995) Proc., Int. Conf. on Advances in Human Factors/Ergonomics , pp. 515-520
    • Kitajima, M.1    Polson, P.2
  • 24
    • 16444371497 scopus 로고    scopus 로고
    • Using customized navigational models to deliver more efficient interaction with mobile computing devices on construction sites
    • Washington, D.C.
    • Reinhardt, J., Akinci, B., and Garrett, J. H., Jr. (2002). "Using customized navigational models to deliver more efficient interaction with mobile computing devices on construction sites." Proc., 19th Int. Symp. on Automation and Robotics in Construction, Washington, D.C., 223-330.
    • (2002) Proc., 19th Int. Symp. on Automation and Robotics in Construction , pp. 223-330
    • Reinhardt, J.1    Akinci, B.2    Garrett Jr., J.H.3
  • 27
    • 0030195306 scopus 로고    scopus 로고
    • Object-oriented model for integrating construction product and process information
    • Stumpf, A. L., Ganeshan, R., Chin, S., and Liu, L. Y. (1996). "Object-oriented model for integrating construction product and process information." J. Comput. Civ. Eng., 10(3), 204-212.
    • (1996) J. Comput. Civ. Eng. , vol.10 , Issue.3 , pp. 204-212
    • Stumpf, A.L.1    Ganeshan, R.2    Chin, S.3    Liu, L.Y.4
  • 28
    • 0037208776 scopus 로고    scopus 로고
    • Developing an electronic acquisition model for scheduling using XML-based information standard
    • Tserng, H. P., and Lin, W. Y. (2003). "Developing an electronic acquisition model for scheduling using XML-based information standard." Autom.Constr., 12(1), 67-95.
    • (2003) Autom. Constr. , vol.12 , Issue.1 , pp. 67-95
    • Tserng, H.P.1    Lin, W.Y.2
  • 29
    • 0031618064 scopus 로고    scopus 로고
    • International alliance for interoperability: IFCs
    • ASCE, Reston, Va.
    • Yu, K., Froese, T., and Grobler, F. (1998). "International alliance for interoperability: IFCs." Proc., Int. Computing Congress, ASCE, Reston, Va., 385-406.
    • (1998) Proc., Int. Computing Congress , pp. 385-406
    • Yu, K.1    Froese, T.2    Grobler, F.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.