Volumn 107, Issue 2, 1998, Pages 250-259

The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure

Author keywords

Activity cost; Crashable modes; Penalty cost; Project cost; Resource constrained project scheduling

Indexed keywords

ALGORITHMS; COMPUTATIONAL METHODS; COST EFFECTIVENESS; HEURISTIC METHODS; INDUSTRIAL ECONOMICS; PROBLEM SOLVING; RESOURCE ALLOCATION; SCHEDULING;

EID: 0032097042     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(97)00331-7     Document Type: Article
Times cited : (45)

References (25)
  • 3
    • 0042416400 scopus 로고
    • Resource allocation in a PERT network under continuous activity time-cost functions
    • Herman, E.B., 1964. Resource allocation in a PERT network under continuous activity time-cost functions. Management Science 10, 734-745.
    • (1964) Management Science , vol.10 , pp. 734-745
    • Herman, E.B.1
  • 4
    • 0025701919 scopus 로고
    • Some efficient multi-heuristic procedures for resource-constrained project scheduling
    • Boctor, F.F., 1990. Some efficient multi-heuristic procedures for resource-constrained project scheduling. European Journal of Operational Research 49, 3-13.
    • (1990) European Journal of Operational Research , vol.49 , pp. 3-13
    • Boctor, F.F.1
  • 5
    • 0027694317 scopus 로고
    • Heuristics for scheduling projects with resource restrictions and several resource-duration modes
    • Boctor, F.F., 1993. Heuristics for scheduling projects with resource restrictions and several resource-duration modes. International Journal of Production Research 31, 2547-2558.
    • (1993) International Journal of Production Research , vol.31 , pp. 2547-2558
    • Boctor, F.F.1
  • 7
    • 0016498438 scopus 로고
    • A comparison of heuristic and optimum solutions in resource constrained project scheduling
    • Davis, E.W., Patterson, J.H., 1975. A comparison of heuristic and optimum solutions in resource constrained project scheduling. Management Science 17, 944-955.
    • (1975) Management Science , vol.17 , pp. 944-955
    • Davis, E.W.1    Patterson, J.H.2
  • 8
    • 0002907360 scopus 로고
    • A branch and bound procedure for the multiple resource-constrained project scheduling problem
    • Demeulemeester, E.L., Herroelen, W.S., 1992. A branch and bound procedure for the multiple resource-constrained project scheduling problem. Management Science 38, 1803-1818.
    • (1992) Management Science , vol.38 , pp. 1803-1818
    • Demeulemeester, E.L.1    Herroelen, W.S.2
  • 10
    • 0027666457 scopus 로고
    • Nonpreemptive multi-mode resource constrained project scheduling
    • Drexl, A., Gruenewald, J., 1993. Nonpreemptive multi-mode resource constrained project scheduling. IIE Transactions 25, 74-81.
    • (1993) IIE Transactions , vol.25 , pp. 74-81
    • Drexl, A.1    Gruenewald, J.2
  • 11
    • 0015484051 scopus 로고
    • Critical path problems with concave cost curves
    • Falk, J.E., Horowitz, J.L., 1972. Critical path problems with concave cost curves. Management Science 19, 446-455.
    • (1972) Management Science , vol.19 , pp. 446-455
    • Falk, J.E.1    Horowitz, J.L.2
  • 12
    • 0000181338 scopus 로고
    • A network flow computation for project cost curves
    • Fulkerson, D.R., 1961. A network flow computation for project cost curves. Management Science 7, 167-178.
    • (1961) Management Science , vol.7 , pp. 167-178
    • Fulkerson, D.R.1
  • 13
    • 0001620447 scopus 로고
    • Critical path planning and scheduling: Mathematical basis
    • Kelly, J.E., 1961. Critical path planning and scheduling: Mathematical basis. Operations Research 9, 296-320.
    • (1961) Operations Research , vol.9 , pp. 296-320
    • Kelly, J.E.1
  • 15
    • 0014804811 scopus 로고
    • Optimum time compression in project scheduling
    • Lamberson, L.R., Hocking, R.R., 1970. Optimum time compression in project scheduling. Management Science 16, 597-606.
    • (1970) Management Science , vol.16 , pp. 597-606
    • Lamberson, L.R.1    Hocking, R.R.2
  • 16
    • 0016935106 scopus 로고
    • Project scheduling: The effects of problem structure on heuristic performance
    • Patterson, J.H., 1976. Project scheduling: The effects of problem structure on heuristic performance. Naval Research Logistics Quarterly 23, 95-123.
    • (1976) Naval Research Logistics Quarterly , vol.23 , pp. 95-123
    • Patterson, J.H.1
  • 17
    • 0016028677 scopus 로고
    • A horizon-varying, zero-one approach to project scheduling
    • Patterson, J.H., Huber, W.D., 1974. A horizon-varying, zero-one approach to project scheduling. Management Science 20, 990-998.
    • (1974) Management Science , vol.20 , pp. 990-998
    • Patterson, J.H.1    Huber, W.D.2
  • 18
    • 0017268482 scopus 로고
    • Scheduling a project under multiple resource constraints: A zero-one approach
    • Patterson, J.H., Roth, G., 1976. Scheduling a project under multiple resource constraints: A zero-one approach. AIIE Transactions 8, 449-456.
    • (1976) AIIE Transactions , vol.8 , pp. 449-456
    • Patterson, J.H.1    Roth, G.2
  • 20
    • 0025701909 scopus 로고
    • Computational experience with a backtracking algorithm for solving a general class of precedence and resource constrained scheduling problems
    • Patterson, J.H., Slowinski, R., Talbot, F.B., Weglarz, J., 1990. Computational experience with a backtracking algorithm for solving a general class of precedence and resource constrained scheduling problems. European Journal of Operational Research 49, 68-79.
    • (1990) European Journal of Operational Research , vol.49 , pp. 68-79
    • Patterson, J.H.1    Slowinski, R.2    Talbot, F.B.3    Weglarz, J.4
  • 21
    • 21344485821 scopus 로고
    • Resource-Constrained Project Scheduling: Exact Methods for the Multi-Mode Case
    • Springer, Berlin
    • Sprecher, A., 1994. Resource-Constrained Project Scheduling: Exact Methods for the Multi-Mode Case, Lecture Notes in Economics and Mathematical Systems 409, Springer, Berlin.
    • (1994) Lecture Notes in Economics and Mathematical Systems , vol.409
    • Sprecher, A.1
  • 23
    • 0018011301 scopus 로고
    • Multiple resource-constrained scheduling using branch and bound
    • Stinson, J.P., Davis, E.W., Khumawala, B.M., 1978. Multiple resource-constrained scheduling using branch and bound. AIIE Transactions 10, 252-259.
    • (1978) AIIE Transactions , vol.10 , pp. 252-259
    • Stinson, J.P.1    Davis, E.W.2    Khumawala, B.M.3
  • 24
    • 0020193734 scopus 로고
    • Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case
    • Talbot, F.B., 1982. Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case. Management Science 28, 1197-1210.
    • (1982) Management Science , vol.28 , pp. 1197-1210
    • Talbot, F.B.1
  • 25
    • 0017997005 scopus 로고
    • An efficient integer programming algorithm with network cut for solving resource constrained scheduling problems
    • Talbot, F.B., Patterson, J.H., 1978. An efficient integer programming algorithm with network cut for solving resource constrained scheduling problems. Management Science 24, 1163-1174.
    • (1978) Management Science , vol.24 , pp. 1163-1174
    • Talbot, F.B.1    Patterson, J.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.