Working Paper Series #95-101, Department of Decision and Information Sciences, University of Florida, Gainesville, FL
-
Ahn, T., Erenguc, S., 1995. Resource constrained project scheduling problem with multiple crashable modes - An exact solution method. Working Paper Series #95-101, Department of Decision and Information Sciences, University of Florida, Gainesville, FL.
-
(1995)
Resource Constrained Project Scheduling Problem with Multiple Crashable Modes - an Exact Solution Method
-
-
Ahn, T.1
Erenguc, S.2
-
3
-
-
0042416400
-
Resource allocation in a PERT network under continuous activity time-cost functions
-
Herman, E.B., 1964. Resource allocation in a PERT network under continuous activity time-cost functions. Management Science 10, 734-745.
-
(1964)
Management Science
, vol.10
, pp. 734-745
-
-
Herman, E.B.1
-
4
-
-
0025701919
-
Some efficient multi-heuristic procedures for resource-constrained project scheduling
-
Boctor, F.F., 1990. Some efficient multi-heuristic procedures for resource-constrained project scheduling. European Journal of Operational Research 49, 3-13.
-
(1990)
European Journal of Operational Research
, vol.49
, pp. 3-13
-
-
Boctor, F.F.1
-
5
-
-
0027694317
-
Heuristics for scheduling projects with resource restrictions and several resource-duration modes
-
Boctor, F.F., 1993. Heuristics for scheduling projects with resource restrictions and several resource-duration modes. International Journal of Production Research 31, 2547-2558.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 2547-2558
-
-
Boctor, F.F.1
-
6
-
-
0023362513
-
Project scheduling with resource constraints: A branch and bound approach
-
Christofides, N., Alvarez-Valdes, R., Tamarit, J.M., 1987. Project scheduling with resource constraints: A branch and bound approach. European Journal of Operational Research 29, 262-273.
-
(1987)
European Journal of Operational Research
, vol.29
, pp. 262-273
-
-
Christofides, N.1
Alvarez-Valdes, R.2
Tamarit, J.M.3
-
7
-
-
0016498438
-
A comparison of heuristic and optimum solutions in resource constrained project scheduling
-
Davis, E.W., Patterson, J.H., 1975. A comparison of heuristic and optimum solutions in resource constrained project scheduling. Management Science 17, 944-955.
-
(1975)
Management Science
, vol.17
, pp. 944-955
-
-
Davis, E.W.1
Patterson, J.H.2
-
8
-
-
0002907360
-
A branch and bound procedure for the multiple resource-constrained project scheduling problem
-
Demeulemeester, E.L., Herroelen, W.S., 1992. A branch and bound procedure for the multiple resource-constrained project scheduling problem. Management Science 38, 1803-1818.
-
(1992)
Management Science
, vol.38
, pp. 1803-1818
-
-
Demeulemeester, E.L.1
Herroelen, W.S.2
-
9
-
-
0042463576
-
-
Research Report, Department of Applied Economics, Katholieke Universiteit Leuven, Belgium
-
Demeulemeester, E.L., Herroelen, W.S., Elmaghraby, S.E., 1993. Optimal procedures for the discrete time/cost trade-off problem in project networks. Research Report, Department of Applied Economics, Katholieke Universiteit Leuven, Belgium.
-
(1993)
Optimal Procedures for the Discrete Time/cost Trade-off Problem in Project Networks
-
-
Demeulemeester, E.L.1
Herroelen, W.S.2
Elmaghraby, S.E.3
-
10
-
-
0027666457
-
Nonpreemptive multi-mode resource constrained project scheduling
-
Drexl, A., Gruenewald, J., 1993. Nonpreemptive multi-mode resource constrained project scheduling. IIE Transactions 25, 74-81.
-
(1993)
IIE Transactions
, vol.25
, pp. 74-81
-
-
Drexl, A.1
Gruenewald, J.2
-
11
-
-
0015484051
-
Critical path problems with concave cost curves
-
Falk, J.E., Horowitz, J.L., 1972. Critical path problems with concave cost curves. Management Science 19, 446-455.
-
(1972)
Management Science
, vol.19
, pp. 446-455
-
-
Falk, J.E.1
Horowitz, J.L.2
-
12
-
-
0000181338
-
A network flow computation for project cost curves
-
Fulkerson, D.R., 1961. A network flow computation for project cost curves. Management Science 7, 167-178.
-
(1961)
Management Science
, vol.7
, pp. 167-178
-
-
Fulkerson, D.R.1
-
13
-
-
0001620447
-
Critical path planning and scheduling: Mathematical basis
-
Kelly, J.E., 1961. Critical path planning and scheduling: Mathematical basis. Operations Research 9, 296-320.
-
(1961)
Operations Research
, vol.9
, pp. 296-320
-
-
Kelly, J.E.1
-
14
-
-
0009318561
-
-
Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel, No. 301
-
Kolisch, R., Sprecher, A., Drexl, A., 1992. Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems: Easy And Hard Instances. Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel, No. 301.
-
(1992)
Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems: Easy and Hard Instances
-
-
Kolisch, R.1
Sprecher, A.2
Drexl, A.3
-
15
-
-
0014804811
-
Optimum time compression in project scheduling
-
Lamberson, L.R., Hocking, R.R., 1970. Optimum time compression in project scheduling. Management Science 16, 597-606.
-
(1970)
Management Science
, vol.16
, pp. 597-606
-
-
Lamberson, L.R.1
Hocking, R.R.2
-
16
-
-
0016935106
-
Project scheduling: The effects of problem structure on heuristic performance
-
Patterson, J.H., 1976. Project scheduling: The effects of problem structure on heuristic performance. Naval Research Logistics Quarterly 23, 95-123.
-
(1976)
Naval Research Logistics Quarterly
, vol.23
, pp. 95-123
-
-
Patterson, J.H.1
-
17
-
-
0016028677
-
A horizon-varying, zero-one approach to project scheduling
-
Patterson, J.H., Huber, W.D., 1974. A horizon-varying, zero-one approach to project scheduling. Management Science 20, 990-998.
-
(1974)
Management Science
, vol.20
, pp. 990-998
-
-
Patterson, J.H.1
Huber, W.D.2
-
18
-
-
0017268482
-
Scheduling a project under multiple resource constraints: A zero-one approach
-
Patterson, J.H., Roth, G., 1976. Scheduling a project under multiple resource constraints: A zero-one approach. AIIE Transactions 8, 449-456.
-
(1976)
AIIE Transactions
, vol.8
, pp. 449-456
-
-
Patterson, J.H.1
Roth, G.2
-
19
-
-
0000480311
-
An algorithm for a general class of precedence and resource constrained scheduling problems
-
Slowinski, R., Weglarz, J. (Ed.), Elsevier, Amsterdam
-
Patterson, J.H., Slowinski, R., Talbot, F.B., Weglarz, J., 1989. An algorithm for a general class of precedence and resource constrained scheduling problems. In: Slowinski, R., Weglarz, J. (Ed.), Studies in Production and Engineering Economics, vol. 9: Advances in Project Scheduling. Elsevier, Amsterdam, pp. 3-28.
-
(1989)
Studies in Production and Engineering Economics, Vol. 9: Advances in Project Scheduling
, vol.9
, pp. 3-28
-
-
Patterson, J.H.1
Slowinski, R.2
Talbot, F.B.3
Weglarz, J.4
-
20
-
-
0025701909
-
Computational experience with a backtracking algorithm for solving a general class of precedence and resource constrained scheduling problems
-
Patterson, J.H., Slowinski, R., Talbot, F.B., Weglarz, J., 1990. Computational experience with a backtracking algorithm for solving a general class of precedence and resource constrained scheduling problems. European Journal of Operational Research 49, 68-79.
-
(1990)
European Journal of Operational Research
, vol.49
, pp. 68-79
-
-
Patterson, J.H.1
Slowinski, R.2
Talbot, F.B.3
Weglarz, J.4
-
21
-
-
21344485821
-
Resource-Constrained Project Scheduling: Exact Methods for the Multi-Mode Case
-
Springer, Berlin
-
Sprecher, A., 1994. Resource-Constrained Project Scheduling: Exact Methods for the Multi-Mode Case, Lecture Notes in Economics and Mathematical Systems 409, Springer, Berlin.
-
(1994)
Lecture Notes in Economics and Mathematical Systems
, vol.409
-
-
Sprecher, A.1
-
22
-
-
0343866850
-
-
Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel, No. 357, Olshausenstraße 40, 24118 Kiel, Germany
-
Sprecher, A., Hartmann, S., Drexl, A., 1994. Project Scheduling with Discrete Time-Resource and Resource-Resource Tradeoffs, Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel, No. 357, Olshausenstraße 40, 24118 Kiel, Germany.
-
(1994)
Project Scheduling with Discrete Time-Resource and Resource-Resource Tradeoffs
-
-
Sprecher, A.1
Hartmann, S.2
Drexl, A.3
-
23
-
-
0018011301
-
Multiple resource-constrained scheduling using branch and bound
-
Stinson, J.P., Davis, E.W., Khumawala, B.M., 1978. Multiple resource-constrained scheduling using branch and bound. AIIE Transactions 10, 252-259.
-
(1978)
AIIE Transactions
, vol.10
, pp. 252-259
-
-
Stinson, J.P.1
Davis, E.W.2
Khumawala, B.M.3
-
24
-
-
0020193734
-
Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case
-
Talbot, F.B., 1982. Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case. Management Science 28, 1197-1210.
-
(1982)
Management Science
, vol.28
, pp. 1197-1210
-
-
Talbot, F.B.1
-
25
-
-
0017997005
-
An efficient integer programming algorithm with network cut for solving resource constrained scheduling problems
-
Talbot, F.B., Patterson, J.H., 1978. An efficient integer programming algorithm with network cut for solving resource constrained scheduling problems. Management Science 24, 1163-1174.
-
(1978)
Management Science
, vol.24
, pp. 1163-1174
-
-
Talbot, F.B.1
Patterson, J.H.2
|