Volumn 22, Issue 4, 2004, Pages 339-346

A new LSM approach for planning repetitive housing projects

Author keywords

Bar chart; CPM; Formwork; LMS; PERT; Planning; Repetitive units; Scheduling

Indexed keywords

CONSTRUCTION INDUSTRY; COSTS; RESOURCE ALLOCATION;

EID: 1642569132     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0263-7863(03)00071-1     Document Type: Article
Times cited : (22)

References (14)
  • 4
    • 0000674566 scopus 로고    scopus 로고
    • Scheduling projects with repeating activities
    • ASCE
    • Harris R.B. Ioannou P.G. Scheduling projects with repeating activities J. Construct. Eng. Manage., ASCE 124 4 1998 269-278
    • (1998) J. Construct. Eng. Manage. , vol.124 , Issue.4 , pp. 269-278
    • Harris, R.B.1    Ioannou, P.G.2
  • 7
    • 0002299336 scopus 로고    scopus 로고
    • Space planning method for multi-story building construction
    • ASCE
    • Riley D.R. Sanvido V.E. Space planning method for multi-story building construction J. Construct. Eng. Manage., ASCE 123 2 1997 171-180
    • (1997) J. Construct. Eng. Manage. , vol.123 , Issue.2 , pp. 171-180
    • Riley, D.R.1    Sanvido, V.E.2
  • 8
    • 1642438329 scopus 로고    scopus 로고
    • Network creation and development for repetitive-unit projects
    • ASCE
    • Yi K.J. Lee H.S. Choi Y.K. Network creation and development for repetitive-unit projects J. Construct. Eng. Manage., ASCE 128 3 2002 257-264
    • (2002) J. Construct. Eng. Manage. , vol.128 , Issue.3 , pp. 257-264
    • Yi, K.J.1    Lee, H.S.2    Choi, Y.K.3
  • 9
    • 0001582375 scopus 로고
    • Knowledge-based system for construction planning of high-rise building
    • ASCE
    • Shaked O. Warszawski A. Knowledge-based system for construction planning of high-rise building J. Construct. Eng. Manage., ASCE 121 2 1995 172-182
    • (1995) J. Construct. Eng. Manage. , vol.121 , Issue.2 , pp. 172-182
    • Shaked, O.1    Warszawski, A.2
  • 10
    • 0000802988 scopus 로고    scopus 로고
    • Linear scheduling model: Development of controlling activity path
    • ASCE
    • Harmelink D.J. Linear scheduling model: development of controlling activity path J. Construct. Eng. Manage., ASCE 124 4 1998 263-268
    • (1998) J. Construct. Eng. Manage. , vol.124 , Issue.4 , pp. 263-268
    • Harmelink, D.J.1
  • 12
    • 0020178299 scopus 로고
    • Time space scheduling method
    • ASCE
    • Stradal O. Cacha J. Time space scheduling method J. Construct. Div., ASCE 108 3 1984 445-457
    • (1984) J. Construct. Div. , vol.108 , Issue.3 , pp. 445-457
    • Stradal, O.1    Cacha, J.2
  • 13
    • 1642438334 scopus 로고    scopus 로고
    • HVLS: Horizontal and vertical logic scheduling for multistory projects
    • ASCE
    • Thabet W. Beliveau Y. HVLS: horizontal and vertical logic scheduling for multistory projects J. Construct. Eng. Manage., ASCE 114 2 1998 191-213
    • (1998) J. Construct. Eng. Manage. , vol.114 , Issue.2 , pp. 191-213
    • Thabet, W.1    Beliveau, Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.