메뉴 건너뛰기




Volumn 130, Issue 1, 2004, Pages 113-121

Performance evaluation of signalized urban intersections under mixed traffic conditions by gray system theory

Author keywords

Intersections; Performance evaluation; Traffic signals; Urban areas

Indexed keywords

ACCIDENT PREVENTION; INTERSECTIONS; PARAMETER ESTIMATION; SYSTEMS ANALYSIS;

EID: 1642561877     PISSN: 0733947X     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-947X(2004)130:1(113)     Document Type: Article
Times cited : (34)

References (17)
  • 1
    • 0030286275 scopus 로고    scopus 로고
    • Effect on vehicle-pedestrian conflicts of turning traffic must yield to pedestrians sign
    • Transportation Research Board, Washington, D.C
    • Abdulsattar, H. N., Tarawneh, M. S., McCoy, P. T., and Kachman, S. D. (1996). "Effect on vehicle-pedestrian conflicts of turning traffic must yield to pedestrians sign." Transportation Research Record, 1494, Transportation Research Board, Washington, D.C., 38-45.
    • (1996) Transportation Research Record, 1494 , pp. 38-45
    • Abdulsattar, H.N.1    Tarawneh, M.S.2    McCoy, P.T.3    Kachman, S.D.4
  • 2
    • 0027642865 scopus 로고
    • Grey system theory applied to rock mechanics
    • Cai, S. J. (1993). "Grey system theory applied to rock mechanics." Int. Rock Mech. Min. Sci. Geomech., 30(4), 473-478.
    • (1993) Int. Rock Mech. Min. Sci. Geomech. , vol.30 , Issue.4 , pp. 473-478
    • Cai, S.J.1
  • 3
    • 0009380011 scopus 로고    scopus 로고
    • Application of grey theory and multiobjective programming towards airline network design
    • Chang, I. H. (2000). "Application of grey theory and multiobjective programming towards airline network design." Eur. J. Oper. Res., 127, 44-68.
    • (2000) Eur. J. Oper. Res. , vol.127 , pp. 44-68
    • Chang, I.H.1
  • 4
    • 0032636643 scopus 로고    scopus 로고
    • Stability analysis of grey compromise programming and its application to watershed land-use planning
    • Chang, N. B., Yeh, S. C., and Wu, G. C. (1999). "Stability analysis of grey compromise programming and its application to watershed land-use planning." Int. J. Syst. Sci., 30(6), 571-589.
    • (1999) Int. J. Syst. Sci. , vol.30 , Issue.6 , pp. 571-589
    • Chang, N.B.1    Yeh, S.C.2    Wu, G.C.3
  • 5
    • 0029333402 scopus 로고
    • Techniques to assess delay and queue length consequences of bus preemption
    • Transportation Research Board, Washington, D.C
    • Cisco, B. A. (1995). "Techniques to assess delay and queue length consequences of bus preemption." Transportation Research Record, 1494, Transportation Research Board, Washington, D.C., 167-175.
    • (1995) Transportation Research Record, 1494 , pp. 167-175
    • Cisco, B.A.1
  • 6
    • 0004310188 scopus 로고
    • Huazhong Polytechnic University Press, Wuhan, China
    • Deng, J. (1985). Grey system fundamental method, Huazhong Polytechnic University Press, Wuhan, China.
    • (1985) Grey System Fundamental Method
    • Deng, J.1
  • 7
    • 0030419927 scopus 로고    scopus 로고
    • A grey hop, skip and jump approach: Generating alternatives for expansion planning of waste management facilities
    • Huang, G. H. (1996). "A grey hop, skip and jump approach: generating alternatives for expansion planning of waste management facilities." Can. J. Civ. Eng., 23, 1207-1219.
    • (1996) Can. J. Civ. Eng. , vol.23 , pp. 1207-1219
    • Huang, G.H.1
  • 8
    • 1642545458 scopus 로고    scopus 로고
    • Institute of Transportation (IT). Taiwan, China
    • Institute of Transportation (IT). (1996). Highway capacity manual for Taiwan area, Taiwan, China.
    • (1996) Highway Capacity Manual for Taiwan Area
  • 9
    • 0029333221 scopus 로고
    • Development of safety-based level-of-service criteria for isolated signalized intersections
    • Transportation Research Board, Washington, D.C
    • Jun, H. T. (1995). "Development of safety-based level-of-service criteria for isolated signalized intersections." Transportation Research Record, 1484, Transportation Research Board, Washington, D.C., 98-104.
    • (1995) Transportation Research Record, 1484 , pp. 98-104
    • Jun, H.T.1
  • 10
    • 1642422700 scopus 로고
    • The grey evaluation of road traffic safety
    • in Chinese
    • Luo, J. T. (1995). "The grey evaluation of road traffic safety." Chin. J. Highway Transport, 8(4), 78-83 (in Chinese).
    • (1995) Chin. J. Highway Transport , vol.8 , Issue.4 , pp. 78-83
    • Luo, J.T.1
  • 12
    • 1642422703 scopus 로고    scopus 로고
    • Study on the evaluation system of hotel management achievement
    • in Chinese
    • Peng, Z. L. (1999). "Study on the evaluation system of hotel management achievement." J. Shanghai Univ., 5(1), 23-28 (in Chinese ).
    • (1999) J. Shanghai Univ. , vol.5 , Issue.1 , pp. 23-28
    • Peng, Z.L.1
  • 13
    • 0032710205 scopus 로고    scopus 로고
    • Traffic conflict standards for intersections
    • Sayed, T. Z. S. (1999). "Traffic conflict standards for intersections." Transp. Plan. Technol., 22(4), 309-323.
    • (1999) Transp. Plan. Technol. , vol.22 , Issue.4 , pp. 309-323
    • Sayed, T.Z.S.1
  • 14
    • 0003678538 scopus 로고
    • Transportation Research Board (TRB). Special Rep. No. 207, National Research Council, Washington, D.C
    • Transportation Research Board (TRB). (1994). Highway capacity manual. Special Rep. No. 207, National Research Council, Washington, D.C.
    • (1994) Highway Capacity Manual
  • 15
    • 0037210529 scopus 로고    scopus 로고
    • Lane-based optimization of signal timings for isolated junctions
    • Wong, C. K., and Wong, S. C. (2003). "Lane-based optimization of signal timings for isolated junctions." Transp. Res., 37B, 63-84.
    • (2003) Transp. Res. , vol.37 B , pp. 63-84
    • Wong, C.K.1    Wong, S.C.2
  • 16
    • 1642504687 scopus 로고    scopus 로고
    • The delay at a signal-controlled intersection with bus stop upstream
    • Wong, S. C., Yang, H., Au Yeung, W. S., Cheuk, S. L., and Lo, M. K. (1998). "The delay at a signal-controlled intersection with bus stop upstream." J. Transp. Eng., 124(3), 229-234.
    • (1998) J. Transp. Eng. , vol.124 , Issue.3 , pp. 229-234
    • Wong, S.C.1    Yang, H.2    Au Yeung, W.S.3    Cheuk, S.L.4    Lo, M.K.5
  • 17
    • 0033363666 scopus 로고    scopus 로고
    • Gray evaluation method of concrete pavement comprehensive condition
    • Wong, W. (1999). "Gray evaluation method of concrete pavement comprehensive condition." J. Transp. Eng., 125(6), 547-551.
    • (1999) J. Transp. Eng. , vol.125 , Issue.6 , pp. 547-551
    • Wong, W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.