-
1
-
-
0031635301
-
Time-space conflict analysis based on 4D production models
-
Boston, October 18-21
-
Akinci, B., and Fischer, M. (1998). "Time-space conflict analysis based on 4D production models." International Computing Congress, Boston, October 18-21, 342-353.
-
(1998)
International Computing Congress
, pp. 342-353
-
-
Akinci, B.1
Fischer, M.2
-
2
-
-
1642298252
-
-
Springer, New York
-
Alonso, G., Casati, F., Kuno, H., and Machiraju, V. (2003). Web Services: Concepts, Architectures, and Applications, Springer, New York.
-
(2003)
Web Services: Concepts, Architectures, and Applications
-
-
Alonso, G.1
Casati, F.2
Kuno, H.3
Machiraju, V.4
-
3
-
-
0013267361
-
Value stream analysis of construction supply chains: Case study on pipe supports used in power plants
-
Gramado, Brazil, 6-8 August, 2002
-
Arbulu, R. J., and Tommelein, I. D. (2002). "Value stream analysis of construction supply chains: case study on pipe supports used in power plants." Tenth Annual Conference of the International Group for Lean Construction (IGLC-10), Gramado, Brazil, 6-8 August, 2002, http://www.cpgec.ufrgs.br/norie/iglc10/papers/8-Arbulu&Tommelein.pdf, 183-195.
-
(2002)
Tenth Annual Conference of the International Group for Lean Construction (IGLC-10)
, pp. 183-195
-
-
Arbulu, R.J.1
Tommelein, I.D.2
-
4
-
-
11644288742
-
Shielding production: Essential step in production control
-
Ballard, G., and Howell, G. (1998). "Shielding production: essential step in production control." ASCE Journal of Construction Engineering and Management, 124(1), 11-17.
-
(1998)
ASCE Journal of Construction Engineering and Management
, vol.124
, Issue.1
, pp. 11-17
-
-
Ballard, G.1
Howell, G.2
-
5
-
-
1642374799
-
Network server supply chain at HP: A case study
-
J.-S. Song and D. Yao, eds., Kluwer Academic Publishers, Boston/Dordrecht/London
-
Beyer, D., and Ward, J. (2002). "Network server supply chain at HP: a case study." Supply Chain Structures: Coordination, Information, and Optimization, J.-S. Song and D. Yao, eds., Kluwer Academic Publishers, Boston/Dordrecht/London, 257-282.
-
(2002)
Supply Chain Structures: Coordination, Information, and Optimization
, pp. 257-282
-
-
Beyer, D.1
Ward, J.2
-
6
-
-
1642312975
-
Q&A: How Dell keeps from stumbling
-
BusinessWeek, May 14, 2001
-
BusinessWeek. (2001). "Q&A: How Dell keeps from stumbling. " BusinessWeek, May 14, 2001, http://www.businessweek.com/magazine/content/01_20/b3732052.htm.
-
(2001)
BusinessWeek
-
-
-
7
-
-
0002914796
-
Designing supply contracts: Contract type and information asymmetry
-
S. Tayur, R. Ganeshan, and M. Magazine, eds., Kluwer Academic Publishers, Boston/Dordrecht/London
-
Corbett, C. J., and Tang, C. S. (1999). "Designing supply contracts: contract type and information asymmetry." Quantitative Models for Supply Chain Management, S. Tayur, R. Ganeshan, and M. Magazine, eds., Kluwer Academic Publishers, Boston/Dordrecht/London, 269-298.
-
(1999)
Quantitative Models for Supply Chain Management
, pp. 269-298
-
-
Corbett, C.J.1
Tang, C.S.2
-
8
-
-
0002355705
-
Effective supply chain management
-
Davis, T. (1993). "Effective supply chain management." Sloan Management Review, 34(4), 35-46.
-
(1993)
Sloan Management Review
, vol.34
, Issue.4
, pp. 35-46
-
-
Davis, T.1
-
9
-
-
0003732501
-
-
Department of the Environment, Transport and the Regions, 16 July 1998
-
Egan, J. (1998). "Rethinking construction." Department of the Environment, Transport and the Regions, 16 July 1998, http://www.dti.gov.uk/construction/rethink/report/index.htm.
-
(1998)
Rethinking Construction
-
-
Egan, J.1
-
11
-
-
0038708678
-
Optimal Use of demand information in supply chain management
-
J.-S. Song and D. Yao, eds., Kluwer Academic Publishers, Boston/Dordrecht/London
-
Gallego, G., and Özer, Ö. (2002). "Optimal Use of demand information in supply chain management." Supply Chain Structures: Coordination, Information, and Optimization, J.-S. Song and D. Yao, eds., Kluwer Academic Publishers, Boston/Dordrecht/London, 119-160.
-
(2002)
Supply Chain Structures: Coordination, Information, and Optimization
, pp. 119-160
-
-
Gallego, G.1
Özer, Ö.2
-
14
-
-
9144265399
-
Product model and 4D CAD final report
-
Center for Integrated Facility Engineering, Stanford University, October 2002, 51 pages
-
Kam, C., and Fischer, M. (2002). "Product model and 4D CAD final report." Technical Report 143, Center for Integrated Facility Engineering, Stanford University, October 2002, 51 pages.
-
(2002)
Technical Report
, vol.143
-
-
Kam, C.1
Fischer, M.2
-
15
-
-
0031108822
-
Information distortion in a supply-chain: The bullwhip effect
-
Lee, H. L., Padmanabhan, V., and Whang, S. (1997). "Information distortion in a supply-chain: the bullwhip effect." Management Science, 43(4), 546-558.
-
(1997)
Management Science
, vol.43
, Issue.4
, pp. 546-558
-
-
Lee, H.L.1
Padmanabhan, V.2
Whang, S.3
-
16
-
-
2342552827
-
E-Business and Supply Chain Integration
-
Stanford Global Supply Chain Management Forum, November 2001, 20 pages
-
Lee, H. L., and Whang, S. (2001). "E-Business and Supply Chain Integration." SGSCMF-W2-2001, Stanford Global Supply Chain Management Forum, November 2001, 20 pages.
-
(2001)
SGSCMF-W2-2001
-
-
Lee, H.L.1
Whang, S.2
-
17
-
-
1642392509
-
Follow the money: What really drives technology innovation in construction
-
Honolulu, Hawaii, March 19-21, 2003, 9 pages
-
Macomber, J. (2003). "Follow the money: what really drives technology innovation in construction." Proceedings of ASCE Construction Congress 7, Honolulu, Hawaii, March 19-21, 2003, 9 pages.
-
(2003)
Proceedings of ASCE Construction Congress
, vol.7
-
-
Macomber, J.1
-
18
-
-
1642324393
-
-
Miller Williams, Inc., October 2001, 11 pages
-
Miller Williams. (2001). "i2 Technologies Customer Value Report." Miller Williams, Inc., October 2001, http://www.i2.com/assets/pdf/30D8BA12-4467-42E0-B371922DD35501E6.pdf, 11 pages.
-
(2001)
i2 Technologies Customer Value Report
-
-
Williams, M.1
-
19
-
-
84855460208
-
Multi-project resource allocation: Parametric models and managerial implications
-
University of Sussex, Brighton, United Kingdom, July 17-19
-
O'Brien, W. J. (2000). "Multi-project resource allocation: parametric models and managerial implications." Eighth Annual Conference of the IGLC, University of Sussex, Brighton, United Kingdom, July 17-19, http://www.sussex.ac.uk/spru/imichair/iglc8/19.pdf, 11 pp.
-
(2000)
Eighth Annual Conference of the IGLC
-
-
O'Brien, W.J.1
-
20
-
-
1642290109
-
4D CAD and dynamic resource planning for specialist contractors: Case study and issues
-
R. Issa, I. Flood, and W. O'Brien, eds., A. A. Balkema, Lisse, The Netherlands
-
O'Brien, W. (2003). "4D CAD and dynamic resource planning for specialist contractors: case study and issues." 4D CAD and Visualization in Construction: Developments and Applications, R. Issa, I. Flood, and W. O'Brien, eds., A. A. Balkema, Lisse, The Netherlands, 101-124.
-
(2003)
4D CAD and Visualization in Construction: Developments and Applications
, pp. 101-124
-
-
O'Brien, W.1
-
21
-
-
0034271361
-
Importance of capacity constraints to construction cost and schedule
-
O'Brien, W. J., and Fischer, M. A. (2000). "Importance of capacity constraints to construction cost and schedule." ASCE Journal of Construction Engineering and Management, 125(6), 366-373.
-
(2000)
ASCE Journal of Construction Engineering and Management
, vol.125
, Issue.6
, pp. 366-373
-
-
O'Brien, W.J.1
Fischer, M.A.2
-
22
-
-
84948495832
-
An economic view of project coordination
-
O'Brien, W. J., Fischer, M. A., and Jucker, J. V. (1995). "An economic view of project coordination." Construction Management and Economics, 13(5), 393-400.
-
(1995)
Construction Management and Economics
, vol.13
, Issue.5
, pp. 393-400
-
-
O'Brien, W.J.1
Fischer, M.A.2
Jucker, J.V.3
-
23
-
-
0004165937
-
-
Irwin/McGraw-Hill, New York
-
Simchi-Levi, D., Kaminsky, P., and Simchi-Levi, E. (2000). Designing and Managing the Supply Chain, Irwin/McGraw-Hill, New York.
-
(2000)
Designing and Managing the Supply Chain
-
-
Simchi-Levi, D.1
Kaminsky, P.2
Simchi-Levi, E.3
-
24
-
-
84888250640
-
Identification and classification of value drivers for a new production homebuilding supply chain
-
Gramado, Brazil, 6-8 August, 2002
-
Taylor, J., and Björnsson, H. (2002). "Identification and classification of value drivers for a new production homebuilding supply chain." Tenth Annual Conference of the International Group for Lean Construction (IGLC-10), Gramado, Brazil, 6-8 August, 2002, http://www.cpgec.ufrgs.br/norie/iglc10/papers/76-TavlorBjornsson.pdf, 171-182.
-
(2002)
Tenth Annual Conference of the International Group for Lean Construction (IGLC-10)
, pp. 171-182
-
-
Taylor, J.1
Björnsson, H.2
-
25
-
-
0027607458
-
Interactive Dynamic Layout Planning
-
Tommelein, I. D., and Zouein, P. P. (1993). "Interactive Dynamic Layout Planning." ASCE Journal of Construction Engineering and Management, 119(2), 266-287.
-
(1993)
ASCE Journal of Construction Engineering and Management
, vol.119
, Issue.2
, pp. 266-287
-
-
Tommelein, I.D.1
Zouein, P.P.2
-
26
-
-
1642384525
-
Case study in application of project scheduling system for supply chain management
-
Gramado, Brazil, 6-8 August, 2002
-
Vaidyanathan, K. (2002). "Case study in application of project scheduling system for supply chain management." Tenth Annual Conference of the International Group for Lean Construction (IGLC-10), Gramado, Brazil, 6-8 August, 2002, http://www.cpgec.ufrgs.br/norie/iglc10/papers/80-Vaidvanathan.pdf, 161-169.
-
(2002)
Tenth Annual Conference of the International Group for Lean Construction (IGLC-10)
, pp. 161-169
-
-
Vaidyanathan, K.1
-
27
-
-
0012258582
-
Roles of supply chain management in construction
-
Berkeley, CA, July 26-28, 1999
-
Vrijhoef, R., and Koskela, L. (1999). "Roles of supply chain management in construction." Proceedings of IGLC-7, Berkeley, CA, July 26-28, 1999, http://www.ce.berkeley.edu/~tommelein/IGLC-7/PDF/ AlSudairi&Diekmann&Songer&Brown.pdf, 133-146.
-
(1999)
Proceedings of IGLC-7
, pp. 133-146
-
-
Vrijhoef, R.1
Koskela, L.2
|