메뉴 건너뛰기




Volumn , Issue , 2003, Pages 57-75

Opportunities for IT to Support the Construction Supply Chain

Author keywords

[No Author keywords available]

Indexed keywords

AUTOMATION; COMPUTER ARCHITECTURE; CONSTRUCTION INDUSTRY; COSTS; INDUSTRIAL MANAGEMENT; INTERNET; PLANNING; PROJECT MANAGEMENT;

EID: 1642344550     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (6)

References (27)
  • 1
    • 0031635301 scopus 로고    scopus 로고
    • Time-space conflict analysis based on 4D production models
    • Boston, October 18-21
    • Akinci, B., and Fischer, M. (1998). "Time-space conflict analysis based on 4D production models." International Computing Congress, Boston, October 18-21, 342-353.
    • (1998) International Computing Congress , pp. 342-353
    • Akinci, B.1    Fischer, M.2
  • 3
    • 0013267361 scopus 로고    scopus 로고
    • Value stream analysis of construction supply chains: Case study on pipe supports used in power plants
    • Gramado, Brazil, 6-8 August, 2002
    • Arbulu, R. J., and Tommelein, I. D. (2002). "Value stream analysis of construction supply chains: case study on pipe supports used in power plants." Tenth Annual Conference of the International Group for Lean Construction (IGLC-10), Gramado, Brazil, 6-8 August, 2002, http://www.cpgec.ufrgs.br/norie/iglc10/papers/8-Arbulu&Tommelein.pdf, 183-195.
    • (2002) Tenth Annual Conference of the International Group for Lean Construction (IGLC-10) , pp. 183-195
    • Arbulu, R.J.1    Tommelein, I.D.2
  • 5
    • 1642374799 scopus 로고    scopus 로고
    • Network server supply chain at HP: A case study
    • J.-S. Song and D. Yao, eds., Kluwer Academic Publishers, Boston/Dordrecht/London
    • Beyer, D., and Ward, J. (2002). "Network server supply chain at HP: a case study." Supply Chain Structures: Coordination, Information, and Optimization, J.-S. Song and D. Yao, eds., Kluwer Academic Publishers, Boston/Dordrecht/London, 257-282.
    • (2002) Supply Chain Structures: Coordination, Information, and Optimization , pp. 257-282
    • Beyer, D.1    Ward, J.2
  • 6
    • 1642312975 scopus 로고    scopus 로고
    • Q&A: How Dell keeps from stumbling
    • BusinessWeek, May 14, 2001
    • BusinessWeek. (2001). "Q&A: How Dell keeps from stumbling. " BusinessWeek, May 14, 2001, http://www.businessweek.com/magazine/content/01_20/b3732052.htm.
    • (2001) BusinessWeek
  • 7
    • 0002914796 scopus 로고    scopus 로고
    • Designing supply contracts: Contract type and information asymmetry
    • S. Tayur, R. Ganeshan, and M. Magazine, eds., Kluwer Academic Publishers, Boston/Dordrecht/London
    • Corbett, C. J., and Tang, C. S. (1999). "Designing supply contracts: contract type and information asymmetry." Quantitative Models for Supply Chain Management, S. Tayur, R. Ganeshan, and M. Magazine, eds., Kluwer Academic Publishers, Boston/Dordrecht/London, 269-298.
    • (1999) Quantitative Models for Supply Chain Management , pp. 269-298
    • Corbett, C.J.1    Tang, C.S.2
  • 8
    • 0002355705 scopus 로고
    • Effective supply chain management
    • Davis, T. (1993). "Effective supply chain management." Sloan Management Review, 34(4), 35-46.
    • (1993) Sloan Management Review , vol.34 , Issue.4 , pp. 35-46
    • Davis, T.1
  • 9
    • 0003732501 scopus 로고    scopus 로고
    • Department of the Environment, Transport and the Regions, 16 July 1998
    • Egan, J. (1998). "Rethinking construction." Department of the Environment, Transport and the Regions, 16 July 1998, http://www.dti.gov.uk/construction/rethink/report/index.htm.
    • (1998) Rethinking Construction
    • Egan, J.1
  • 11
    • 0038708678 scopus 로고    scopus 로고
    • Optimal Use of demand information in supply chain management
    • J.-S. Song and D. Yao, eds., Kluwer Academic Publishers, Boston/Dordrecht/London
    • Gallego, G., and Özer, Ö. (2002). "Optimal Use of demand information in supply chain management." Supply Chain Structures: Coordination, Information, and Optimization, J.-S. Song and D. Yao, eds., Kluwer Academic Publishers, Boston/Dordrecht/London, 119-160.
    • (2002) Supply Chain Structures: Coordination, Information, and Optimization , pp. 119-160
    • Gallego, G.1    Özer, Ö.2
  • 14
    • 9144265399 scopus 로고    scopus 로고
    • Product model and 4D CAD final report
    • Center for Integrated Facility Engineering, Stanford University, October 2002, 51 pages
    • Kam, C., and Fischer, M. (2002). "Product model and 4D CAD final report." Technical Report 143, Center for Integrated Facility Engineering, Stanford University, October 2002, 51 pages.
    • (2002) Technical Report , vol.143
    • Kam, C.1    Fischer, M.2
  • 15
    • 0031108822 scopus 로고    scopus 로고
    • Information distortion in a supply-chain: The bullwhip effect
    • Lee, H. L., Padmanabhan, V., and Whang, S. (1997). "Information distortion in a supply-chain: the bullwhip effect." Management Science, 43(4), 546-558.
    • (1997) Management Science , vol.43 , Issue.4 , pp. 546-558
    • Lee, H.L.1    Padmanabhan, V.2    Whang, S.3
  • 16
    • 2342552827 scopus 로고    scopus 로고
    • E-Business and Supply Chain Integration
    • Stanford Global Supply Chain Management Forum, November 2001, 20 pages
    • Lee, H. L., and Whang, S. (2001). "E-Business and Supply Chain Integration." SGSCMF-W2-2001, Stanford Global Supply Chain Management Forum, November 2001, 20 pages.
    • (2001) SGSCMF-W2-2001
    • Lee, H.L.1    Whang, S.2
  • 17
    • 1642392509 scopus 로고    scopus 로고
    • Follow the money: What really drives technology innovation in construction
    • Honolulu, Hawaii, March 19-21, 2003, 9 pages
    • Macomber, J. (2003). "Follow the money: what really drives technology innovation in construction." Proceedings of ASCE Construction Congress 7, Honolulu, Hawaii, March 19-21, 2003, 9 pages.
    • (2003) Proceedings of ASCE Construction Congress , vol.7
    • Macomber, J.1
  • 18
    • 1642324393 scopus 로고    scopus 로고
    • Miller Williams, Inc., October 2001, 11 pages
    • Miller Williams. (2001). "i2 Technologies Customer Value Report." Miller Williams, Inc., October 2001, http://www.i2.com/assets/pdf/30D8BA12-4467-42E0-B371922DD35501E6.pdf, 11 pages.
    • (2001) i2 Technologies Customer Value Report
    • Williams, M.1
  • 19
    • 84855460208 scopus 로고    scopus 로고
    • Multi-project resource allocation: Parametric models and managerial implications
    • University of Sussex, Brighton, United Kingdom, July 17-19
    • O'Brien, W. J. (2000). "Multi-project resource allocation: parametric models and managerial implications." Eighth Annual Conference of the IGLC, University of Sussex, Brighton, United Kingdom, July 17-19, http://www.sussex.ac.uk/spru/imichair/iglc8/19.pdf, 11 pp.
    • (2000) Eighth Annual Conference of the IGLC
    • O'Brien, W.J.1
  • 20
    • 1642290109 scopus 로고    scopus 로고
    • 4D CAD and dynamic resource planning for specialist contractors: Case study and issues
    • R. Issa, I. Flood, and W. O'Brien, eds., A. A. Balkema, Lisse, The Netherlands
    • O'Brien, W. (2003). "4D CAD and dynamic resource planning for specialist contractors: case study and issues." 4D CAD and Visualization in Construction: Developments and Applications, R. Issa, I. Flood, and W. O'Brien, eds., A. A. Balkema, Lisse, The Netherlands, 101-124.
    • (2003) 4D CAD and Visualization in Construction: Developments and Applications , pp. 101-124
    • O'Brien, W.1
  • 24
    • 84888250640 scopus 로고    scopus 로고
    • Identification and classification of value drivers for a new production homebuilding supply chain
    • Gramado, Brazil, 6-8 August, 2002
    • Taylor, J., and Björnsson, H. (2002). "Identification and classification of value drivers for a new production homebuilding supply chain." Tenth Annual Conference of the International Group for Lean Construction (IGLC-10), Gramado, Brazil, 6-8 August, 2002, http://www.cpgec.ufrgs.br/norie/iglc10/papers/76-TavlorBjornsson.pdf, 171-182.
    • (2002) Tenth Annual Conference of the International Group for Lean Construction (IGLC-10) , pp. 171-182
    • Taylor, J.1    Björnsson, H.2
  • 26
    • 1642384525 scopus 로고    scopus 로고
    • Case study in application of project scheduling system for supply chain management
    • Gramado, Brazil, 6-8 August, 2002
    • Vaidyanathan, K. (2002). "Case study in application of project scheduling system for supply chain management." Tenth Annual Conference of the International Group for Lean Construction (IGLC-10), Gramado, Brazil, 6-8 August, 2002, http://www.cpgec.ufrgs.br/norie/iglc10/papers/80-Vaidvanathan.pdf, 161-169.
    • (2002) Tenth Annual Conference of the International Group for Lean Construction (IGLC-10) , pp. 161-169
    • Vaidyanathan, K.1
  • 27
    • 0012258582 scopus 로고    scopus 로고
    • Roles of supply chain management in construction
    • Berkeley, CA, July 26-28, 1999
    • Vrijhoef, R., and Koskela, L. (1999). "Roles of supply chain management in construction." Proceedings of IGLC-7, Berkeley, CA, July 26-28, 1999, http://www.ce.berkeley.edu/~tommelein/IGLC-7/PDF/ AlSudairi&Diekmann&Songer&Brown.pdf, 133-146.
    • (1999) Proceedings of IGLC-7 , pp. 133-146
    • Vrijhoef, R.1    Koskela, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.