-
2
-
-
0031635301
-
Time-space conflict analysis based on 4D production models
-
K.C.P. Wang (ed.), Boston, 18-21 October, ASCE
-
Akinci, B. and Fischer, M. 1998. Time-space conflict analysis based on 4D production models. In K.C.P. Wang (ed.), International computing congress, Boston, 18-21 October: 342-353. ASCE.
-
(1998)
International computing congress
, pp. 342-353
-
-
Akinci, B.1
Fischer, M.2
-
7
-
-
0000567436
-
Relevant costs, congestion and stochasticity in production environments
-
Banker, R.D., Datar, S.M. and Kekre, S. 1988. Relevant costs, congestion and stochasticity in production environments. Journal of Accounting and Economics 10(3): 171-197.
-
(1988)
Journal of Accounting and Economics
, vol.10
, Issue.3
, pp. 171-197
-
-
Banker, R.D.1
Datar, S.M.2
Kekre, S.3
-
8
-
-
2342418087
-
Specialist contractors: A review of issues raised by their new role in building
-
Bennett, J. and Ferry, D. 1990. Specialist contractors: a review of issues raised by their new role in building. Construction Management and Economics 8(3): 259-283.
-
(1990)
Construction Management and Economics
, vol.8
, Issue.3
, pp. 259-283
-
-
Bennett, J.1
Ferry, D.2
-
9
-
-
0019064535
-
Construction planning-beyond the critical path
-
ASCE
-
Birrell, G.S. 1980. Construction planning-beyond the critical path. Journal of the Construction Division 106(CO3): 389-407. ASCE.
-
(1980)
Journal of the Construction Division
, vol.106
, Issue.CO3
, pp. 389-407
-
-
Birrell, G.S.1
-
11
-
-
0345100588
-
Interactive coordination of distributed work plans
-
K.D. Walsh (ed.), Orlando, Florida, 20-22 February, ASCE
-
Choo, H.J. and Tommelein, I.D. 2000a. Interactive coordination of distributed work plans. In K.D. Walsh (ed.), Proceedings of construction congress VI: Building together for a better tomorrow in an increasingly complex world, Orlando, Florida, 20-22 February: 11-20. ASCE.
-
(2000)
Proceedings of construction congress VI: Building together for a better tomorrow in an increasingly complex world
, pp. 11-20
-
-
Choo, H.J.1
Tommelein, I.D.2
-
12
-
-
85160496064
-
WorkMovePlan: Database for distributed planning and coordination
-
J. Barlow (ed.), University of Sussex, Brighton, United Kingdom, 17-19 July
-
Choo, H.J. and Tommelein, I.D. 2000b. WorkMovePlan: database for distributed planning and coordination. In J. Barlow (ed.), Eighth annual conference of the IGLC, University of Sussex, Brighton, United Kingdom, 17-19 July: 12 pp.
-
(2000)
Eighth annual conference of the IGLC
, pp. 12
-
-
Choo, H.J.1
Tommelein, I.D.2
-
13
-
-
0032667279
-
WorkPlan: Constraintbased database for work package scheduling
-
ASCE
-
Choo, H.J., Tommelein, I.D., Ballard, G. and Zabelle, T.R. 1999. WorkPlan: constraintbased database for work package scheduling. Journal of Construction Engineering and Management 125(3): 151-160. ASCE.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.3
, pp. 151-160
-
-
Choo, H.J.1
Tommelein, I.D.2
Ballard, G.3
Zabelle, T.R.4
-
14
-
-
84974449619
-
OARPLAN: Generating project plans by reasoning about objects, actions, and resources
-
Darwiche, A., Levitt, R. and Hayes-Roth, B. 1988. OARPLAN: generating project plans by reasoning about objects, actions, and resources. AI EDAM 2(3): 169-181.
-
(1988)
AI EDAM
, vol.2
, Issue.3
, pp. 169-181
-
-
Darwiche, A.1
Levitt, R.2
Hayes-Roth, B.3
-
15
-
-
0000693991
-
Scheduling with computer-interpretable construction method models
-
ASCE
-
Fischer, M. and Aalami, F. 1996. Scheduling with computer-interpretable construction method models. Journal of Construction Engineering and Management 122(4): 337-347. ASCE.
-
(1996)
Journal of Construction Engineering and Management
, vol.122
, Issue.4
, pp. 337-347
-
-
Fischer, M.1
Aalami, F.2
-
20
-
-
58849120784
-
Columbia construction research: The applications of three-dimensional computer models in construction
-
Griffis, F., O’Brien, W. and Bronner, P. 1990. Columbia construction research: the applications of three-dimensional computer models in construction. Architectural and Engineering Systems.
-
(1990)
Architectural and Engineering Systems
-
-
Griffis, F.1
O’Brien, W.2
Bronner, P.3
-
21
-
-
0025857941
-
Productivity applications: 3D models and simulation
-
ASCE
-
Griffis, F.H., Rubinson, D., O’Brien, W., Retailleau, S. and Zabilsky, R. 1991. Productivity applications: 3D models and simulation. Proceedings of construction congress '91: 247-252. ASCE.
-
(1991)
Proceedings of construction congress '91
, pp. 247-252
-
-
Griffis, F.H.1
Rubinson, D.2
O’Brien, W.3
Retailleau, S.4
Zabilsky, R.5
-
23
-
-
0028454852
-
The contractor-subcontractor relationship: The subcontractor’s view
-
ASCE
-
Hinze, J. and Tracey, A. 1994. The contractor-subcontractor relationship: the subcontractor’s view. Journal of Construction Engineering and Management 120(2): 274-287. ASCE.
-
(1994)
Journal of Construction Engineering and Management
, vol.120
, Issue.2
, pp. 274-287
-
-
Hinze, J.1
Tracey, A.2
-
26
-
-
84855460208
-
Multi-project resource allocation: Parametric models and managerial implications
-
J. Barlow (ed.), University of Sussex, Brighton, United Kingdom, 17-19 July
-
O’Brien, W.J. 2000a. Multi-project resource allocation: parametric models and managerial implications. In J. Barlow (ed.), Eighth annual conference of the IGLC. University of Sussex, Brighton, United Kingdom, 17-19 July: 11 pp.
-
(2000)
Eighth annual conference of the IGLC
, pp. 11
-
-
O’Brien, W.J.1
-
27
-
-
58849116345
-
Towards 5D CAD-dynamic cost and resource planning for specialist contractors
-
K.D. Barlow (ed.), Orlando, Florida, 20-22 February, 2000, ASCE
-
O’Brien, W.J. 2000b. Towards 5D CAD-dynamic cost and resource planning for specialist contractors. In K.D. Barlow (ed.), Proceedings of construction congress VI: Building together for a better tomorrow in an increasingly complex world, Orlando, Florida, 20-22 February, 2000: 1023-1028. ASCE.
-
(2000)
Proceedings of construction congress VI: Building together for a better tomorrow in an increasingly complex world
, pp. 1023-1028
-
-
O’Brien, W.J.1
-
29
-
-
84948495832
-
An economic view of project coordination
-
O’Brien, W.J., Fischer, M.A. and Jucker, J.V. 1995. An economic view of project coordination. Construction Management and Economics 13(5): 393-400.
-
(1995)
Construction Management and Economics
, vol.13
, Issue.5
, pp. 393-400
-
-
O’Brien, W.J.1
Fischer, M.A.2
Jucker, J.V.3
-
31
-
-
1642272264
-
The role of four-dimensional (4D) models in trade sequencing and production planning
-
K.D. Walsh (ed.), Orlando, Florida: 20-22, February, 2000, ASCE
-
Riley, D. 2000. The role of four-dimensional (4D) models in trade sequencing and production planning. In K.D. Walsh (ed.), Proceedings of construction congress VI: Building together for a better tomorrow in an increasingly complex world, Orlando, Florida: 20-22, February, 2000: 1029-1034. ASCE.
-
(2000)
Proceedings of construction congress VI: Building together for a better tomorrow in an increasingly complex world
, pp. 1029-1034
-
-
Riley, D.1
-
32
-
-
1842831431
-
The practical needs of integrating scope, cost, and time
-
May 30-June 3, 1998, Vancouver, Canada: NRC Research Press
-
Staub-French, S. and Fischer, M. 1999. The practical needs of integrating scope, cost, and time. Proceedings of the 8th international conference on durability of building materials and component, May 30-June 3, 1998: 2888-2898. Vancouver, Canada: NRC Research Press.
-
(1999)
Proceedings of the 8th international conference on durability of building materials and component
, pp. 2888-2898
-
-
Staub-French, S.1
Fischer, M.2
-
34
-
-
0028401574
-
Modeling work space to schedule repetitive floors in multistory buildings
-
ASCE
-
Thabet, W.Y. and Beliveau, Y.J. 1994. Modeling work space to schedule repetitive floors in multistory buildings. Journal of Construction Engineering and Management 120(1): 96-116. ASCE.
-
(1994)
Journal of Construction Engineering and Management
, vol.120
, Issue.1
, pp. 96-116
-
-
Thabet, W.Y.1
Beliveau, Y.J.2
-
35
-
-
0030825017
-
SCaRC: Space-constrained resource-constrained scheduling system
-
ASCE
-
Thabet, W.Y. and Beliveau, Y.J. 1997. SCaRC: Space-constrained resource-constrained scheduling system. Journal of Computing in Civil Engineering 11(1): 48-59. ASCE.
-
(1997)
Journal of Computing in Civil Engineering
, vol.11
, Issue.1
, pp. 48-59
-
-
Thabet, W.Y.1
Beliveau, Y.J.2
-
36
-
-
2342419514
-
Impact of variability and uncertainty on integrated product and process development
-
K. Walsh (ed.), Orlando, Florida, 20-22 February, 2000, ASCE
-
Tommelein, I. 2000. Impact of variability and uncertainty on integrated product and process development. In K. Walsh (ed.), Proceedings of construction congress 6, special program of 4D CAD and visualization, Orlando, Florida, 20-22 February, 2000: 969-976. ASCE.
-
(2000)
Proceedings of construction congress 6, special program of 4D CAD and visualization
, pp. 969-976
-
-
Tommelein, I.1
-
38
-
-
12444319455
-
Risks in subcontracting: Subcontract conditions
-
Uher, T.E. 1991. Risks in subcontracting: subcontract conditions. Construction Management and Economics 9(3): 495-508.
-
(1991)
Construction Management and Economics
, vol.9
, Issue.3
, pp. 495-508
-
-
Uher, T.E.1
|