-
1
-
-
0026124166
-
Automated two-machine flow-shop scheduling: A solvable case
-
H. Kise, T. Shioyama, and T. Ibaraki Automated two-machine flow-shop scheduling a solvable case IIE Trans 23 1 1991 10 16
-
(1991)
IIE Trans
, vol.23
, Issue.1
, pp. 10-16
-
-
Kise, H.1
Shioyama, T.2
Ibaraki, T.3
-
2
-
-
0027569359
-
Robot task scheduling in a flexible manufacturing cell
-
R. King, T. Hodgson, and F. Chafee Robot task scheduling in a flexible manufacturing cell IIE Trans 25 2 1993 80 87
-
(1993)
IIE Trans
, vol.25
, Issue.2
, pp. 80-87
-
-
King, R.1
Hodgson, T.2
Chafee, F.3
-
3
-
-
0031272146
-
Cyclic scheduling of identical parts in a robotic cell
-
Y. Crama, and J. van de Klundert Cyclic scheduling of identical parts in a robotic cell Oper Res 45 6 1997 952 965
-
(1997)
Oper Res
, vol.45
, Issue.6
, pp. 952-965
-
-
Crama, Y.1
Van De Klundert, J.2
-
4
-
-
0002604088
-
Cyclic scheduling in 3-machine robotic flowshops
-
Y. Crama, and J. van de Klundert Cyclic scheduling in 3-machine robotic flowshops J Scheduling 2 1999 35 54
-
(1999)
J Scheduling
, vol.2
, pp. 35-54
-
-
Crama, Y.1
Van De Klundert, J.2
-
6
-
-
0003546381
-
Scheduling in robotic cells: Classification, two and three machine cell
-
N. Hall, H. Kamoun, and C. Sriskandarajah Scheduling in robotic cells classification, two and three machine cell Eur J Oper Res 99 1997 136 153
-
(1997)
Eur J Oper Res
, vol.99
, pp. 136-153
-
-
Hall, N.1
Kamoun, H.2
Sriskandarajah, C.3
-
7
-
-
0033312656
-
Scheduling in robotic cell: Heuristics and cell design
-
H. Kamoun, N. Hall, and C. Sriskandarajah Scheduling in robotic cell heuristics and cell design Oper Res 47 6 1999 821 835
-
(1999)
Oper Res
, vol.47
, Issue.6
, pp. 821-835
-
-
Kamoun, H.1
Hall, N.2
Sriskandarajah, C.3
-
8
-
-
0035357074
-
Scheduling in dual gripper robotic cells for productivity gains
-
S. Sethi, J. Sidney, and C. Sriskandarajah Scheduling in dual gripper robotic cells for productivity gains IEEE Trans Robotics Automat 17 3 2001 324 341
-
(2001)
IEEE Trans Robotics Automat
, vol.17
, Issue.3
, pp. 324-341
-
-
Sethi, S.1
Sidney, J.2
Sriskandarajah, C.3
-
22
-
-
0034838042
-
Looking for optimum feeding sequences in a manufacturing cell with four parallel machines
-
ISATP2001, Fukuoka, Japan, 28-29 May
-
R. Suárez, and J. Rosell Looking for optimum feeding sequences in a manufacturing cell with four parallel machines Proceedings of the 2001 IEEE international symposium on assembly and task planning ISATP2001, Fukuoka, Japan, 28-29 May 2001 256 261
-
(2001)
Proceedings of the 2001 IEEE International Symposium on Assembly and Task Planning
, pp. 256-261
-
-
Suárez, R.1
Rosell, J.2
-
23
-
-
15744396928
-
Feeding-sequence selection using linear discriminants in a parallel-machine manufacturing cell. 15th triennial world congress of the international federation of automatic control
-
Barcelona, Spain, 21-26 July
-
Suárez R, Rosell J, Tuset M, Pérez R. Feeding-sequence selection using linear discriminants in a parallel-machine manufacturing cell. 15th triennial world congress of the international federation of automatic control, IFAC b'02, Barcelona, Spain, 21-26 July, 2002.
-
(2002)
IFAC b'02
-
-
Suárez, R.1
Rosell, J.2
Tuset, M.3
Pérez, R.4
-
24
-
-
0003408787
-
-
Natick, MA: The Maths Works Inc.
-
The Math Works Inc. Optimization toolbox user's guide. Natick, MA: The Maths Works Inc.; 1996.
-
(1996)
Optimization Toolbox User's Guide
-
-
|