-
1
-
-
0032165995
-
Enhancing new product development performance: An organisational learning perspective
-
Adams, M., Day, E. & Dougherty, D. 1998. Enhancing new product development performance: an organisational learning perspective. Journal of Product innovation management 15(5): 403-422.
-
(1998)
Journal of Product Innovation Management
, vol.15
, Issue.5
, pp. 403-422
-
-
Adams, M.1
Day, E.2
Dougherty, D.3
-
3
-
-
0025510439
-
The battle to build better products
-
Ashley, S. 1990. The battle to build better products. Mechanical Engineering 112(11): 34-38.
-
(1990)
Mechanical Engineering
, vol.112
, Issue.11
, pp. 34-38
-
-
Ashley, S.1
-
4
-
-
0346692506
-
Assembly, promises & simultaneous engineering
-
Bergstrom, R.P. 1990. Assembly, promises & simultaneous engineering. Production 102(5): 50-56.
-
(1990)
Production
, vol.102
, Issue.5
, pp. 50-56
-
-
Bergstrom, R.P.1
-
5
-
-
84982671404
-
A model of corporate innovation management: Some recent high tech innovations in Japan
-
Bowonder, B. & Miyake, T. 1992. A model of corporate innovation management: some recent high tech innovations in Japan. R&D Management 22(4): 319-335.
-
(1992)
R&D Management
, vol.22
, Issue.4
, pp. 319-335
-
-
Bowonder, B.1
Miyake, T.2
-
6
-
-
84982706013
-
Design - The starting point for CIM
-
Brooks, B. 1990. Design - the starting point for CIM. R&D Management 20(3): 221-227.
-
(1990)
R&D Management
, vol.20
, Issue.3
, pp. 221-227
-
-
Brooks, B.1
-
9
-
-
0009403885
-
Re-engineering to achieve a concurrent engineering environment
-
Dicesare, F.P. 1993. Re-engineering to achieve a concurrent engineering environment. Journal of Design and Manufacturing 3(2): 75-89.
-
(1993)
Journal of Design and Manufacturing
, vol.3
, Issue.2
, pp. 75-89
-
-
Dicesare, F.P.1
-
10
-
-
0001625458
-
A novel approach to product design and development in a concurrent engineering environment
-
Dowlatshahi, S. 1993. A novel approach to product design and development in a concurrent engineering environment. Technavation 13(3): 161-176.
-
(1993)
Technavation
, vol.13
, Issue.3
, pp. 161-176
-
-
Dowlatshahi, S.1
-
14
-
-
0024717651
-
Design and manufacture overlap to advantage
-
Hollingum, J. 1989. Design and manufacture overlap to advantage. Assembly Automation 9(3): 128-131.
-
(1989)
Assembly Automation
, vol.9
, Issue.3
, pp. 128-131
-
-
Hollingum, J.1
-
18
-
-
0041575021
-
The design team: Suppliers move into the line of fire
-
Raia, E. 1993. The design team: suppliers move into the line of fire. Purchasing 115(8): 9-13.
-
(1993)
Purchasing
, vol.115
, Issue.8
, pp. 9-13
-
-
Raia, E.1
-
20
-
-
0002856695
-
Development of a model for predicting design for manufacturability effectiveness
-
G.Susman (ed.). New York, Oxford
-
Susman, G. & Dean., J. 1992. Development of a model for predicting design for manufacturability effectiveness. In G.Susman (ed.), Integrating design and manufacturing for competitive advantage. New York, Oxford: 207-222.
-
(1992)
Integrating Design and Manufacturing for Competitive Advantage
, pp. 207-222
-
-
Susman, G.1
Dean, J.2
-
21
-
-
0032635365
-
Measuring the effectiveness of overlapping development activities
-
Terwiesch, C., & Loch, C.H. 1999. Measuring the effectiveness of overlapping development activities. Management Science 45(4): 455-465.
-
(1999)
Management Science
, vol.45
, Issue.4
, pp. 455-465
-
-
Terwiesch, C.1
Loch, C.H.2
-
24
-
-
1542518498
-
The role of concurrent engineering in weapons system acquisition
-
Institute for Defense Analyses
-
Winner, R.J., Pennell, J.P., Bertrand, H.E., & Slusarczuk, M.M. 1988. The role of concurrent engineering in weapons system acquisition, IDA R-338. Institute for Defense Analyses.
-
(1988)
IDA R-338
-
-
Winner, R.J.1
Pennell, J.P.2
Bertrand, H.E.3
Slusarczuk, M.M.4
-
25
-
-
0343765733
-
Concurrent engineering - Your strategic weapon in today's jungle
-
Yesersky, P. T. 1993. Concurrent engineering - your strategic weapon in today's jungle, CMA Magazine 67(6): 24-27.
-
(1993)
CMA Magazine
, vol.67
, Issue.6
, pp. 24-27
-
-
Yesersky, P.T.1
|